Nothing Special   »   [go: up one dir, main page]

CN105150810B - A kind of built-in slide lower guide rail installing structure - Google Patents

A kind of built-in slide lower guide rail installing structure Download PDF

Info

Publication number
CN105150810B
CN105150810B CN201510676271.3A CN201510676271A CN105150810B CN 105150810 B CN105150810 B CN 105150810B CN 201510676271 A CN201510676271 A CN 201510676271A CN 105150810 B CN105150810 B CN 105150810B
Authority
CN
China
Prior art keywords
plate
time
marking time
slide
guide rail
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510676271.3A
Other languages
Chinese (zh)
Other versions
CN105150810A (en
Inventor
张羽
徐志海
赵飞
鲁后国
欧阳俊珩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Jianghuai Automobile Group Corp
Original Assignee
Anhui Jianghuai Automobile Group Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Jianghuai Automobile Group Corp filed Critical Anhui Jianghuai Automobile Group Corp
Priority to CN201510676271.3A priority Critical patent/CN105150810B/en
Publication of CN105150810A publication Critical patent/CN105150810A/en
Application granted granted Critical
Publication of CN105150810B publication Critical patent/CN105150810B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Train Traffic Observation, Control, And Security (AREA)
  • Support Devices For Sliding Doors (AREA)

Abstract

The present invention relates to automobile technical field, disclose a kind of built-in slide lower guide rail installing structure, including side-wall outer-plate, mark time and be connected to the side-wall outer-plate and it is described mark time between supporting plate of marking time;It is described to mark time as split-type structural, including mark time leading portion and back segment of marking time, and described mark time is also associated with lower guideway installing plate between leading portion and the back segment of marking time, slide lower guideway is fixed on the bottom of the lower guideway installing plate.The mounting structure is realized the fixed position of slide lower guideway by the lower section that is changed to mark time on side-wall outer-plate, avoid the both sides that slide glidepath is located at slide sealing surface, improve the sealing at slide, save arrangement space simultaneously and turn avoid that glidepath is exposed to influence visual effect outside, improve the functional reliability and service life of glidepath.In addition, slide glidepath to be arranged in the lower section marked time, also it is beneficial to improve the intensity marked time, avoids trampling deformation.

Description

A kind of built-in slide lower guide rail installing structure
Technical field
The present invention relates to automobile technical field, more particularly to a kind of built-in slide lower guide rail installing structure.
Background technology
Compared with traditional car door, automobile sliding door because of side evolution formula, have easily park, opens wide greatly and facilitates occupant's goods The advantages that disengaging, increasingly favored by consumer.In automobile market, the either high-end luxurious MPV of commercial affairs, or towards The light bus and low side passenger traffic minicar of city logisticses use sliding door structure.Slide lower guideway is to maintain slide movement route Guiding mechanism, in structure design of automobile, the mounting structure of slide lower guideway is because all edge laps are complicated, door sealing performance The reasons such as difference are always the difficult point of vehicle body design.
With reference to figure 1 and Fig. 2, respectively slide lower guideway installment state lower front end and the sectional drawing of rear end in the prior art. Slide lower guideway 1' connects into side-wall outer-plate assembly by solder joint and side-wall outer-plate 2' and lower guideway fixed plate 3', and the 4' that marks time is total Weld together during spelling with side-wall outer-plate assembly.As can be seen that slide lower guideway 1' front end is located at car door from Fig. 1 and Fig. 2 Sealing surface A'(is doorframe seam) within, slide lower guideway 1' rear end is located at beyond the A' of door sealing face, i.e. guide rail front and back end Positioned at slide sealing surface A' both sides.This structure causes guide rail to pass through door sealing face so that vehicle poor sealing performance, causes sky Tune effect is poor, noise etc. easily enters in crew module outside crew module, influences vehicle NVH performances;Can also guide rail be caused to be vulnerable to the external world Steam and the influence for scuffing of colliding with, guide rail are vulnerable to corrosion, easily cause sliding track mechanism failure, slide closes not first-class consequence, influence Occupant safety.
Therefore, those skilled in the art need to improve the mounting structure of slide lower guideway, are deposited with solving you to have in technology Above mentioned problem.
The content of the invention
It is an object of the invention to provide a kind of built-in slide lower guide rail installing structure, to improve door sealing, carry Rise the reliability and vehicle security of lower guideway.
To achieve these goals, the invention provides following technical scheme:
A kind of built-in slide lower guide rail installing structure, including side-wall outer-plate, mark time and be connected to the side-wall outer-plate with It is described mark time between supporting plate of marking time;It is described to mark time as split-type structural, including mark time leading portion and back segment of marking time, and described step on Lower guideway installing plate is also associated between step leading portion and the back segment of marking time, slide lower guideway is fixed on the lower guideway installing plate Bottom.
Preferably, the leading portion of marking time is close to the side-wall outer-plate, and the doorframe seam on the peripheral side plate is less than institute State the leading portion and in the outside of the leading portion of marking time of marking time.
Preferably, the front end of the slide lower guideway, rear end are also sequentially provided with preceding shrouding and rear shrouding, the preceding shrouding and Shrouding is welded and fixed with the lower guideway installing plate respectively after described.
Preferably, the back segment of marking time includes the first flat board connected vertically and the second flat board, and described marks time on back segment Provided with the L-shaped reinforcement extended to from first flat board on second flat board.
Preferably, the L-shaped reinforcement is multigroup that multigroup L-shaped reinforcement be arranged in parallel.
Preferably, first flat board is close to the leading portion of marking time, and the edge of first flat board is provided with and is turned over downwards Flange, the flange with it is described mark time support plate weld.
Preferably, the back segment of marking time is integrated punch forming part.
Preferably, the leading portion of marking time is slab construction, and which is provided with multigroup reinforcement be arrangeding in parallel.
Preferably, the lower guideway installing plate is U-shaped steel plate, and marks time leading portion and weldering is respectively adopted in back segment of marking time with described Connect fixation.
Preferably, the lower guideway installing plate is provided with multigroup triangle reinforcement.
The beneficial effects of the present invention are:
Slide lower guide rail installing structure provided by the invention, using split type tread structure, realizing will lead under slide The lower section that the fixed position of rail is changed to mark time by side-wall outer-plate, the both sides that slide glidepath is located at slide sealing surface are avoided, are carried Sealing at high slide, while save arrangement space and turn avoid that glidepath is exposed to influence visual effect outside, also prevent The problems such as having stopped the exposed slide rail corrosion brought of glidepath, having scraped, improve the functional reliability and service life of glidepath.Separately Outside, slide glidepath is arranged in the lower section marked time, is also beneficial to improve the intensity marked time, avoids trampling deformation.
Brief description of the drawings
, below will be to institute in embodiment in order to illustrate more clearly of the embodiment of the present application or technical scheme of the prior art The accompanying drawing needed to use is briefly described, and the specific embodiment of the present invention will be made further specifically with reference to accompanying drawing It is bright, wherein
Fig. 1 is the sectional drawing of slide lower guideway installment state lower front end in the prior art;
Fig. 2 is the sectional drawing of rear end under slide lower guideway installment state in the prior art;
Fig. 3 is the end view drawing of slide lower guide rail installing structure in the embodiment of the present invention;
Fig. 4 is the structural representation of slide lower guide rail installing structure in the embodiment of the present invention;
Fig. 5 is the structural representation of back segment of being marked time in the embodiment of the present invention;
Fig. 6 is the structural representation of leading portion of being marked time in the embodiment of the present invention;
Fig. 7 is the structural representation that lower guideway installs version in the embodiment of the present invention.
Label declaration in wherein above-mentioned accompanying drawing is as follows:
1'- slide lower guideways, 2'- side-wall outer-plates, 3'- lower guideway fixed plates, 4'- mark time, A'- door sealings face;
1- side-wall outer-plates, 2- mark time, and 3- marks time supporting plate, 4- lower guideway installing plates, 5- slide lower guideways;
21- marks time leading portion, and 22- marks time back segment;41- triangle reinforcements;
211- reinforcements, the flat boards of 221- first, the flat boards of 222- second, 223-L shape reinforcements, 224- flange;
A- doorframe seams.
Embodiment
In order that those skilled in the art more fully understand technical scheme, below in conjunction with specific embodiment pair This programme is further described in detail.
With reference to figure 3 and Fig. 4, built-in slide lower guide rail installing structure provided in an embodiment of the present invention, including side-wall outer-plate 1st, mark time and 2 and be connected to the side-wall outer-plate 1 and the supporting plate 3 of marking time marked time between 2;Described mark time 2 is split type knot Structure, including mark time and leading portion 21 and mark time back segment 22, it is described to mark time leading portion 21 and the back segment 22 of marking time is split-type structural, and two Lower guideway installing plate 4 is also associated between person, slide lower guideway 5 is fixed on the bottom of the lower guideway installing plate 4.
Compared with prior art, the installation site of the slide lower guideway 5 is marked time down by being moved on side-wall outer-plate Side, solve the problems, such as that slide lower guideway rear and front end splits door sealing face both sides arrangement, it is close at car door so as to improve Feng Xing, the problems such as avoiding car door leak, leakage sound, while this mounting structure is effectively utilized space, causes to lead under slide again Rail is in concealed arrangement, avoids the exposed influence visual effect of guide rail, also prevent the exposed corrosion brought of guide rail, scratch etc. and asks Topic, so as to improve the service behaviour of slide lower guideway and service life.In addition, lower guideway is arranged in the lower section marked time, The bulk strength marked time beneficial to raising, prevents from trampling deformation.
Split type tread structure, it is easy to being connected for lower guideway installing plate, ensure that slide lower guideway installation knot The feasibility that structure uses on vehicle.When mounting structure in the present embodiment is specifically used, preferably first the lower guideway is pacified Loading board 4 marks time leading portion 21 and the back segment 22 of marking time is respectively adopted and is welded and fixed with described, and the slide lower guideway 5 is welded On the lower guideway installing plate 4, assembly of marking time is formed;The assembly that will mark time afterwards welds with the supporting plate 3 of marking time, then by institute The other end and the side-wall outer-plate 1 for stating supporting plate 3 of marking time weld.
In order to increase the arrangement space of lower guideway, the doorframe seam A on the side-wall outer-plate 1 compared with prior art, position Put and lowered.Specifically, the leading portion 21 of marking time is the section of marking time close to the side-wall outer-plate 1, the peripheral side plate 1 Doorframe seam A is less than the leading portion 21 of marking time.In addition, the doorframe seam A is arranged in the outside of the leading portion 21 of marking time, prevent The leading portion 21 and doorframe seam A that marks time interferes, and influences the sealing at slide.
Further, the front end of the slide lower guideway 5, rear end are also sequentially provided with preceding shrouding and rear shrouding, are sealed before described Plate and the rear shrouding are welded and fixed with the lower guideway installing plate 4 respectively.The preceding shrouding, it is described after shrouding and it is described under lead Rail installing plate 4 and the slide lower guideway 5 can form semi-enclosed box like structure, beneficial to improve integrally-built stability and Intensity.
With reference to figure 5, in the present embodiment, it is flat that the back segment 22 of marking time includes the first flat board 221 and second connected vertically Plate 222, and the back segment 22 of marking time is provided with the L-shaped extended to from first flat board 221 on second flat board 222 and added Strengthening tendons 223.
The L-shaped reinforcement 223 is preferably multigroup, and multigroup L-shaped reinforcement 223 be arranged in parallel.
Further, first flat board 221 is close to the leading portion 21 of marking time, and the edge of first flat board 221 is set There is the flange 224 being turned over downwards, the flange 224 welds with the supporting plate 3 of marking time, and improves described mark time and 2 is stepped on described Walk the reliability that supporting plate 3 connects.
The edge of second flat board 222 may also set up turnup structure, to improve the intensity marked time.
In production, the back segment 22 of marking time is preferably integrated punching molding part, and intensity is high, is easy to batch machining to produce.
In addition, with reference to figure 6, in the present embodiment, the leading portion 21 of marking time is slab construction, and be which is provided with multigroup parallel The reinforcement 211 of setting.
With reference to figure 7, the lower guideway installing plate 4 is U-shaped steel plate, its thickness 1.5mm.The top of the lower guideway installing plate 4 Leading portion 21 is marked time with described and the back segment 22 of marking time is welded and fixed in face respectively.
Multigroup triangle reinforcement 41 is additionally provided with the lower guideway installing plate 4.
Construction, feature and the action effect of the present invention, above institute is described in detail according to the embodiment shown in schema above Only presently preferred embodiments of the present invention is stated, but the present invention is not to limit practical range shown in drawing, it is every according to structure of the invention Want made change, or be revised as the equivalent embodiment of equivalent variations, when still without departing from specification and illustrating covered spirit, All should be in protection scope of the present invention.

Claims (8)

1. a kind of built-in slide lower guide rail installing structure, it is characterised in that including side-wall outer-plate (1), mark time (2) and be connected to The side-wall outer-plate (1) and the supporting plate of marking time (3) marked time between (2);Described mark time (2) are split-type structural, including Mark time leading portion (21) and back segment of marking time (22), and be also associated with down between the leading portion of marking time (21) and the back segment of marking time (22) Guide rail installing plate (4), slide lower guideway (5) are fixed on the bottom of the lower guideway installing plate (4);
The leading portion of marking time (21) is close to the side-wall outer-plate (1), and the doorframe seam (A) on the side-wall outer-plate (1) is less than The leading portion of marking time (21) and in the outside of the leading portion of marking time (21);
Front end, the rear end of the slide lower guideway (5) are also sequentially provided with preceding shrouding and rear shrouding, the preceding shrouding and the rear envelope Plate is welded and fixed with the lower guideway installing plate (4) respectively.
2. built-in slide lower guide rail installing structure according to claim 1, it is characterised in that the back segment of marking time (22) Including the first flat board (221) connected vertically and the second flat board (222), and the back segment of marking time (22) is provided with from described first The L-shaped reinforcement (223) extended on flat board (221) on second flat board (222).
3. built-in slide lower guide rail installing structure according to claim 2, it is characterised in that the L-shaped reinforcement (223) to be multigroup, multigroup L-shaped reinforcement (223) be arranged in parallel.
4. built-in slide lower guide rail installing structure according to claim 3, it is characterised in that first flat board (221) close to the leading portion (21) of marking time, and the edge of first flat board (221) is provided with the flange (224) being turned over downwards, institute Flange (224) is stated to weld with the supporting plate of marking time (3).
5. built-in slide lower guide rail installing structure according to claim 4, it is characterised in that the back segment of marking time (22) It is integrated punch forming part.
6. built-in slide lower guide rail installing structure according to claim 1, it is characterised in that the leading portion of marking time (21) For slab construction, and it which is provided with multigroup reinforcement (211) be arrangeding in parallel.
7. built-in slide lower guide rail installing structure according to claim 1, it is characterised in that the lower guideway installing plate (4) it is U-shaped steel plate, and is respectively adopted and is welded and fixed with the leading portion of marking time (21) and back segment of marking time (22).
8. built-in slide lower guide rail installing structure according to claim 7, it is characterised in that the lower guideway installing plate (4) it is provided with multigroup triangle reinforcement (41).
CN201510676271.3A 2015-10-15 2015-10-15 A kind of built-in slide lower guide rail installing structure Active CN105150810B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510676271.3A CN105150810B (en) 2015-10-15 2015-10-15 A kind of built-in slide lower guide rail installing structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510676271.3A CN105150810B (en) 2015-10-15 2015-10-15 A kind of built-in slide lower guide rail installing structure

Publications (2)

Publication Number Publication Date
CN105150810A CN105150810A (en) 2015-12-16
CN105150810B true CN105150810B (en) 2018-02-13

Family

ID=54791982

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510676271.3A Active CN105150810B (en) 2015-10-15 2015-10-15 A kind of built-in slide lower guide rail installing structure

Country Status (1)

Country Link
CN (1) CN105150810B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106522714B (en) * 2016-08-29 2018-06-01 浙江兴宇汽车零部件有限公司 A kind of processing technology of sliding door of automobile guide rail
CN108705922B (en) * 2018-05-28 2020-01-10 安徽江淮汽车集团股份有限公司 Embedded sliding door lower guide rail mounting structure

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1963133A (en) * 2005-11-11 2007-05-16 爱信精机株式会社 Slide door opening and closing apparatus for vehicle
US7354100B2 (en) * 2004-03-31 2008-04-08 Mitsui Mining & Smelting Co., Ltd. Power slide device for vehicle sliding door
EP1975002A2 (en) * 2007-03-27 2008-10-01 Aisin Seiki Kabushiki Kaisha Step apparatus for vehicle and structure arrangement of step apparatus for vehicle
CN203766631U (en) * 2013-03-21 2014-08-13 爱信精机株式会社 Pedal device for vehicle
CN204472694U (en) * 2014-01-17 2015-07-15 爱信精机株式会社 Pedal device for vehicle
CN205059155U (en) * 2015-10-15 2016-03-02 安徽江淮汽车股份有限公司 Interior concealed sliding door lower guideway mounting structure

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS59230841A (en) * 1983-06-14 1984-12-25 Nissan Motor Co Ltd Side step construction for automobile

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7354100B2 (en) * 2004-03-31 2008-04-08 Mitsui Mining & Smelting Co., Ltd. Power slide device for vehicle sliding door
CN1963133A (en) * 2005-11-11 2007-05-16 爱信精机株式会社 Slide door opening and closing apparatus for vehicle
EP1975002A2 (en) * 2007-03-27 2008-10-01 Aisin Seiki Kabushiki Kaisha Step apparatus for vehicle and structure arrangement of step apparatus for vehicle
CN203766631U (en) * 2013-03-21 2014-08-13 爱信精机株式会社 Pedal device for vehicle
CN204472694U (en) * 2014-01-17 2015-07-15 爱信精机株式会社 Pedal device for vehicle
CN205059155U (en) * 2015-10-15 2016-03-02 安徽江淮汽车股份有限公司 Interior concealed sliding door lower guideway mounting structure

Also Published As

Publication number Publication date
CN105150810A (en) 2015-12-16

Similar Documents

Publication Publication Date Title
CN105150810B (en) A kind of built-in slide lower guide rail installing structure
CN205059155U (en) Interior concealed sliding door lower guideway mounting structure
CN206539176U (en) A kind of integral type guide rail of automobile door glass
CN103786794A (en) Front pillar of vehicle
CN203806014U (en) Side beam structure shared by front floor assemblies of old and new vehicle models
CN205736855U (en) Door sash assembly and the fit structure of Buddhist nun's groove
CN106800024A (en) A kind of big aperture egress door of rail vehicle and drivers' cab
CN204197057U (en) Floor assembly before a kind of
CN207241375U (en) Door sash strengthening structure and automobile
CN202703209U (en) Aluminum alloy automobile door sealing device
CN204488963U (en) Fender mounting bracket and body structure
CN204775496U (en) Additional strengthening of car A post
CN201432679Y (en) Non-corrodible steel vehicle running on urban rail
CN205395970U (en) Decorative board I -shaped layering mounting structure
CN203888807U (en) Vehicle door footboard of railway vehicle
CN104443064B (en) The double-deck open bus assembly method on detachable top
CN205417109U (en) Door sash welds assembly
CN204511164U (en) A kind of double-layer door mount structure
CN108859971B (en) Sealing support structure for front door and rear view mirror
CN205100709U (en) To hinge reinforcing plate structure of opening door
CN204978857U (en) Car qianmen frame assembly
CN209274722U (en) A kind of car door upper hinge installation stiffening plate structure
CN205769617U (en) A kind of inner plate of automobile rear wheel cover assembly structure
CN201362303Y (en) Rear skirtboard shell plate used for cars
CN206217619U (en) Back suspension device of engine mounting assembly and automobile

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 230601 Anhui Province, Hefei City Industrial Park, the Peach Blossom Road No. 669

Applicant after: Anhui Jianghuai Automobile Group Limited by Share Ltd

Address before: 230601 Anhui Province, Hefei City Industrial Park, the Peach Blossom Road No. 669

Applicant before: Anhui Jianghuai Automotive Co., Ltd.

CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Zhang Yu

Inventor after: Xu Zhihai

Inventor after: Zhao Fei

Inventor after: Lu Houguo

Inventor after: Ouyang Junheng

Inventor before: Tao Longlong

Inventor before: Zhang Yanyang

Inventor before: Zhao Fei

GR01 Patent grant
GR01 Patent grant