CN105024305A - Tension tower drain wire fracture-free construction method - Google Patents
Tension tower drain wire fracture-free construction method Download PDFInfo
- Publication number
- CN105024305A CN105024305A CN201510417061.2A CN201510417061A CN105024305A CN 105024305 A CN105024305 A CN 105024305A CN 201510417061 A CN201510417061 A CN 201510417061A CN 105024305 A CN105024305 A CN 105024305A
- Authority
- CN
- China
- Prior art keywords
- preformed armor
- wire
- drainage thread
- armor rods
- construction method
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Suspension Of Electric Lines Or Cables (AREA)
Abstract
The invention provides a tension tower drain wire fracture-free construction method. With the construction method adopted, hazards caused by dispersion and heat emission of a drain wire of a power transmission line can be prevented. The method include the following steps that: (1) the nominal height, total height and span length of a tension tower in a line are acquired, and a wire back-pull reservation value is calculated according to wire releasing sag and span length, and is marked on the wire; (2) a preformed armor rod tension clamp is installed at a position which is marked with the wire back-pull reservation value, and the preformed armor rod tension clamp is connected with a connecting plate, and the connecting plate is connected with a U-shaped connecting component, and the U-shaped connecting component is connected with an insulator string on the tension tower, and the preformed armor rod tension clamp includes a heart-shaped ring and a preformed armor rod, wherein the preformed armor rod is connected with the drain wire. The construction method of the invention is simple and can assist in reducing dispersion and heat emission of the wire and reducing operation risks. In the construction process of operating personnel, the wire can be marked according to the wire back-pull reservation value, and the wire is provided with the preformed armor rod tension clamp at the position which is marked with the wire back-pull reservation value, and the drain wire can be connected without being fractured; and contact resistance can be reduced as much as possible, and dispersion and heat emission of the drain wire can be prevented.
Description
Technical field
The present invention relates to a kind of ultra-high-tension power transmission line construction field, be specifically related to a kind of strain tower drainage thread and do not break construction method.
Background technology
110--220 KV transmission line strain tower drainage thread adopts hydraulic strain clamp to connect usually, there is the problems such as a large amount of wire broken lot, aluminum tube bending distortion, connecting plate bolt looseness (after running, heating is even blown), platform crimping work high above the ground risk, the balance line risk of falling tower in construction; There is drainage thread broken lot in pre-hinged strain clamp, transition joint place connecting strip generates heat the defect of even blowing in employing.This potential danger mainly wire broken lot, heating causes, and greatly adds the operation risk of electrical network.
Summary of the invention
The object of the invention is for above-mentioned the deficiencies in the prior art, provide a kind of strain tower drainage thread not break construction method, can prevent transmission line drainage thread broken lot to generate heat the harm caused.
Technical scheme of the present invention is achieved in that a kind of strain tower drainage thread does not break construction method, carries out in the following manner:
(1) collect exhaling of strain tower in circuit and claim high, overall height and span, calculate wire according to unwrapping wire sag and span and return and lead reserved value, row labels of going forward side by side;
(2) in mark, preformed armor rods strain clamp is installed, preformed armor rods strain clamp is connected with connecting plate, and connecting plate is connected with U-shaped connector, and U-shaped connector is connected on the insulator string of strain tower, wherein preformed armor rods strain clamp comprises thimble and preformed armor rods, and preformed armor rods is connected with drainage thread.
Between preformed armor rods and drainage thread, be also provided with internal layer protection preformed armor rods, internal layer protection preformed armor rods is wrapped on drainage thread, and preformed armor rods is wrapped on internal layer protection preformed armor rods.
The transducer detecting drainage thread temperature and tension force is provided with in the junction of preformed armor rods and drainage thread.
The inside and outside corner of strain tower, is provided with and hangs insulator string, and hang insulator string and be connected with the wire jumper section of drainage thread by suspension clamp, wire jumper section is also connected with weight.
Drainage thread and preformed armor rods contact site are coated with and conduct electricity sand or conductive grease.
Described thimble is the thimble of carbon steel.
Form of construction work of the present invention is fairly simple, can reduce the heating of wire broken lot, reduce operating risk.Operating personnel, in work progress, returns according to wire and leads reserved value and mark, then directly install preformed armor rods strain clamp in mark, drainage thread not disconnecting.Decrease contact resistance as much as possible, prevent drainage thread broken lot, heating.
Accompanying drawing explanation
In order to be illustrated more clearly in the embodiment of the present invention or technical scheme of the prior art, be briefly described to the accompanying drawing used required in embodiment or description of the prior art below, apparently, accompanying drawing in the following describes is only some embodiments of the present invention, for those of ordinary skill in the art, under the prerequisite not paying creative work, other accompanying drawing can also be obtained according to these accompanying drawings.
Fig. 1 is preformed armor rods and drainage thread connection status schematic diagram in the present invention.
Fig. 2 is the schematic top plan view of Fig. 1.
Fig. 3 is drainage thread, strain tower distribution schematic diagram.
Fig. 4 is insulator string, preformed armor rods, connecting plate and U-shaped plate connection status schematic diagram.
Wherein: 1. connecting plate, 2.U type connector, 3. insulator string, 4. thimble, 5. preformed armor rods, 6. drainage thread, 7. weight, 8. hang insulator string, 9. strain tower.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, be clearly and completely described the technical scheme in the embodiment of the present invention, obviously, described embodiment is only the present invention's part embodiment, instead of whole embodiments.Based on the embodiment in the present invention, those of ordinary skill in the art, not paying the every other embodiment obtained under creative work prerequisite, belong to the scope of protection of the invention.
As shown in figures 1-4, a kind of strain tower drainage thread does not break construction method, carries out in the following manner:
(1) collect exhaling of strain tower in circuit and claim high, overall height and span, calculate wire according to unwrapping wire sag and span and return and lead reserved value, row labels of going forward side by side; Return and lead reserved value and calculate according to power industry safety work code requirement.
(2) in mark, preformed armor rods strain clamp is installed, preformed armor rods strain clamp is connected with connecting plate 1, connecting plate 1 is connected with U-shaped connector 2, U-shaped connector 2 is connected on the insulator string 3 of strain tower, wherein preformed armor rods strain clamp comprises thimble 4 and preformed armor rods 5, and preformed armor rods is connected with drainage thread 6.In thimble and preformed armor rods junction, note making wire freely sagging under gravity, form turning round of wire and wire jumper, can not torsion guidewire by force, otherwise easily occur that broken lot, wire can be dawdled thimble.
Described thimble 4 is the thimble of carbon steel.The percentage elongation of carbon element steel is good, is about 18%, can prevent thimble from rupturing and cause wire dropping.After adopting preformed armor rods strain clamp of the present invention, when coaster crossed by wire, do not need water pipe precaution; During stringing, wire jumper carries out back leading reserved according to precalculated numerical value, directly carries out installation exercise, do not need marcottage job platform, be convenient to balance line after drawing print, promotes transmission line construction overall process Mechanization Level.
In the present invention, thimble is avoided directly to be connected with the triangle yoke plate on shaft tower, because in this connected mode drainage thread can only in the plane at set square place flexible rotating, when wire occurs that torsion or workman's operation maintenance scrunch wire, thimble will be subject to bending stress, may cause the damage of thimble time serious.Therefore, the present invention utilizes U-shaped connector 2 to be connected with shaft tower by thimble with connecting plate 1, and connecting wire like this at horizontal and vertical directions flexible rotating, can prevent the fracture of thimble.The length of U-shaped connector is wanted suitably, can draw smoothly provide sufficient space, outgoing direction and thimble place plane orthogonal under the drawing of wire for wire from wire clamp outlet.
As preferably, be also provided with internal layer protection preformed armor rods between preformed armor rods 5 and drainage thread 6, internal layer protection preformed armor rods is wrapped on drainage thread 6, and preformed armor rods 5 is wrapped on internal layer protection preformed armor rods.Increase internal layer protection preformed armor rods as ceiling, drainage thread skin not only can be protected not to be worn, and improve the rigidity of drainage thread, avoid producing wire external layer broken lot when preformed armor rods skin bar is installed.
Preferably, be provided with in the junction of preformed armor rods 5 and drainage thread 6 transducer detecting drainage thread temperature and tension force.This kind of intelligent transducer can detect wire temperature rise, wave, ice coating and running tension, power transmission line intelligent level can be promoted.
In addition, the present invention is corner inside and outside strain tower 9, is provided with and hangs insulator string 8, and hang insulator string 8 and be connected with the wire jumper section of drainage thread by suspension clamp, wire jumper section is also connected with weight 7.Can get loose by mode preformed armor rods like this, increase second protection.
Preferably, can also at drainage thread and preformed armor rods contact site coated with conductive sand or conductive grease, to reduce contact resistance.
The foregoing is only preferred embodiment of the present invention, not in order to limit the present invention, within the spirit and principles in the present invention all, any amendment done, equivalent replacement, improvement etc., all should be included within protection scope of the present invention.
Claims (6)
1. strain tower drainage thread does not break a construction method, it is characterized in that carrying out in the following manner:
(1) collect exhaling of strain tower in circuit and claim high, overall height and span, calculate wire according to unwrapping wire sag and span and return and lead reserved value, row labels of going forward side by side;
(2) in mark, preformed armor rods strain clamp is installed, preformed armor rods strain clamp is connected with connecting plate (1), connecting plate (1) is connected with U-shaped connector (2), U-shaped connector (2) is connected on the insulator string (3) of strain tower, wherein preformed armor rods strain clamp comprises thimble (4) and preformed armor rods (5), and preformed armor rods is connected with drainage thread (6).
2. strain tower drainage thread according to claim 1 does not break construction method; it is characterized in that: between preformed armor rods (5) and drainage thread (6), be also provided with internal layer protection preformed armor rods; internal layer protection preformed armor rods is wrapped on drainage thread (6), and preformed armor rods (5) is wrapped on internal layer protection preformed armor rods.
3. strain tower drainage thread according to claim 1 does not break construction method, it is characterized in that: be provided with in the junction of preformed armor rods (5) and drainage thread (6) transducer detecting drainage thread temperature and tension force.
4. strain tower drainage thread according to claim 1 does not break construction method, it is characterized in that: the inside and outside corner of strain tower, be provided with and hang insulator string (8), hang insulator string (8) to be connected with the wire jumper section of drainage thread by suspension clamp, wire jumper section is also connected with weight (7).
5. not break construction method according to the strain tower drainage thread one of Claims 1 to 4 Suo Shu, it is characterized in that: drainage thread and preformed armor rods contact site are coated with and conduct electricity sand or conductive grease.
6. strain tower drainage thread according to claim 5 does not break construction method, it is characterized in that: the thimble that described thimble (4) is carbon steel.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510417061.2A CN105024305A (en) | 2015-07-15 | 2015-07-15 | Tension tower drain wire fracture-free construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510417061.2A CN105024305A (en) | 2015-07-15 | 2015-07-15 | Tension tower drain wire fracture-free construction method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105024305A true CN105024305A (en) | 2015-11-04 |
Family
ID=54414094
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510417061.2A Pending CN105024305A (en) | 2015-07-15 | 2015-07-15 | Tension tower drain wire fracture-free construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105024305A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107737884A (en) * | 2017-11-10 | 2018-02-27 | 扬州市天奇机械有限公司 | A kind of casting method of bowl of head cardioid ring |
CN108336710A (en) * | 2017-01-20 | 2018-07-27 | 深圳带路科技有限公司 | A kind of ground wire connection Double safety device |
CN108802946A (en) * | 2018-08-31 | 2018-11-13 | 邹平县供电公司 | A kind of ADSS optical fiber erecting structures of anti-electrocorrosion |
CN114825167A (en) * | 2022-04-22 | 2022-07-29 | 贵州西电电力股份有限公司黔北发电厂 | Optimization method for diversion wire reconnection |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2702499Y (en) * | 2003-03-21 | 2005-05-25 | 程建国 | Strain clamp for optical cable |
JP2009296795A (en) * | 2008-06-05 | 2009-12-17 | Nhk Spring Co Ltd | Tension balancer for overhead wire and device for preventing scattering of lubricant oil for the same |
CN202260341U (en) * | 2011-09-28 | 2012-05-30 | 中国电力工程顾问集团西南电力设计院 | 30mm heavy ice area ground wire preformed armor rod type strain insulator-string of +/-800 kV extra-high voltage direct current line |
CN203367922U (en) * | 2013-07-15 | 2013-12-25 | 国家电网公司 | Electric power fitting applied onto overhead line |
CN203734260U (en) * | 2013-12-31 | 2014-07-23 | 浙江中欣动力测控技术有限公司 | Pre-twisted type strain clamp with monitoring function |
-
2015
- 2015-07-15 CN CN201510417061.2A patent/CN105024305A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2702499Y (en) * | 2003-03-21 | 2005-05-25 | 程建国 | Strain clamp for optical cable |
JP2009296795A (en) * | 2008-06-05 | 2009-12-17 | Nhk Spring Co Ltd | Tension balancer for overhead wire and device for preventing scattering of lubricant oil for the same |
CN202260341U (en) * | 2011-09-28 | 2012-05-30 | 中国电力工程顾问集团西南电力设计院 | 30mm heavy ice area ground wire preformed armor rod type strain insulator-string of +/-800 kV extra-high voltage direct current line |
CN203367922U (en) * | 2013-07-15 | 2013-12-25 | 国家电网公司 | Electric power fitting applied onto overhead line |
CN203734260U (en) * | 2013-12-31 | 2014-07-23 | 浙江中欣动力测控技术有限公司 | Pre-twisted type strain clamp with monitoring function |
Non-Patent Citations (1)
Title |
---|
鲁耀,韩培君,徐大鹏: "《220kV耐张塔中相引流线断线故障原因分析及防范措施》", 《内蒙古电力技术》 * |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108336710A (en) * | 2017-01-20 | 2018-07-27 | 深圳带路科技有限公司 | A kind of ground wire connection Double safety device |
CN107737884A (en) * | 2017-11-10 | 2018-02-27 | 扬州市天奇机械有限公司 | A kind of casting method of bowl of head cardioid ring |
CN107737884B (en) * | 2017-11-10 | 2019-05-03 | 扬州市天奇机械有限公司 | A kind of casting method of bowl of head cardioid ring |
CN108802946A (en) * | 2018-08-31 | 2018-11-13 | 邹平县供电公司 | A kind of ADSS optical fiber erecting structures of anti-electrocorrosion |
CN114825167A (en) * | 2022-04-22 | 2022-07-29 | 贵州西电电力股份有限公司黔北发电厂 | Optimization method for diversion wire reconnection |
CN114825167B (en) * | 2022-04-22 | 2023-09-05 | 贵州西电电力股份有限公司黔北发电厂 | Optimization method for drainage wire reconnection |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105024305A (en) | Tension tower drain wire fracture-free construction method | |
CN205544159U (en) | Two safeties of overhead ground wire | |
CN203799586U (en) | Signboard mounting support for power transmission line steel tube tower | |
KR20090006200U (en) | A ladder for inspecting and repairing of polymer insulator | |
CN105322463B (en) | UHV transmission line strain insulator-string insulation outlet stretches flat ladder | |
CN107611868A (en) | Fast demountable type cable protective sleeve | |
CN107196266A (en) | A kind of lightning conducter Double safety device | |
CN102623926A (en) | Distant equipotential tackle and method for realizing charged equipotential access by using same | |
CN100590943C (en) | Air ground line downward link and method for ground line assembly | |
CN204068050U (en) | Electrical lead live line working insulated shielding cover | |
CN107069562A (en) | Replacing insulator under electrified method and load transfer device | |
CN105140863A (en) | Safety backup wire clamp used for cable erection | |
CN205070358U (en) | Set up safe spare fastener that cable used | |
CN104979776A (en) | Method for entering equipotential level for tension support of UHV transmission line | |
CN103701071A (en) | Tool for processing drainage wire clip bolt under hot-line mode and hot-line work method of tool | |
CN203859248U (en) | Short circuit grounding device used for overhead line maintenance | |
CN206148848U (en) | Large -tonnage electrified conducting wire's hoisting device | |
CN104269669B (en) | A kind of earth lead | |
CN104682271A (en) | Construction method of flexible metal sheath insulation cable | |
CN103947638A (en) | Anti-bird cover of power transmission line | |
CN203895925U (en) | Automatic wiring apparatus for ground wire deicing | |
CN203707670U (en) | Tool for lively processing bolt of by-pass jumper clamp | |
CN106469892A (en) | A kind of ice-melt cable hanging device | |
CN205159906U (en) | Insulation of special high tension transmission line strain insulator -string is qualified for next round of competitions flexible flat terracedly | |
CN207039143U (en) | A kind of tension force keeps wire clamp |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20151104 |