Nothing Special   »   [go: up one dir, main page]

CN104972666A - Krah pipe continuous production process - Google Patents

Krah pipe continuous production process Download PDF

Info

Publication number
CN104972666A
CN104972666A CN201510261881.7A CN201510261881A CN104972666A CN 104972666 A CN104972666 A CN 104972666A CN 201510261881 A CN201510261881 A CN 201510261881A CN 104972666 A CN104972666 A CN 104972666A
Authority
CN
China
Prior art keywords
materials
pipes
plate
krah
carat pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510261881.7A
Other languages
Chinese (zh)
Inventor
王海燕
胡政
李汉生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ANHUI WANAN ENVIRONMENT TECHNOLOGY Co Ltd
Original Assignee
ANHUI WANAN ENVIRONMENT TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ANHUI WANAN ENVIRONMENT TECHNOLOGY Co Ltd filed Critical ANHUI WANAN ENVIRONMENT TECHNOLOGY Co Ltd
Priority to CN201510261881.7A priority Critical patent/CN104972666A/en
Publication of CN104972666A publication Critical patent/CN104972666A/en
Pending legal-status Critical Current

Links

Landscapes

  • Extrusion Moulding Of Plastics Or The Like (AREA)

Abstract

The invention discloses a krah pipe continuous production process. The process comprises the following production steps that 1, materials are mixed and dried, and the raw materials required for producing krah pipes are added into a mixing unit according to a specified ratio, mixed evenly and dried, wherein the raw materials comprise, by mass, 85-96% of HDPE, 0-7% LDPE and 4-8% of color masterbatches, and the drying time of the raw materials ranges from 60 min to 120 min; 2, PE materials are extruded, the mixed and dried materials are conveyed to an extruder hopper, pass through an extruder charging barrel, are subjected to screw heating, shearing and plasticizing and enter a plate die and a pipe die respectively, and then plates and pipes are extruded, wherein the temperature of a machine body ranges from 18 DEG C to 210 DEG C, and the temperatures of the dies range from 190 DEG C to 220 DEG C. The krah pipes are formed through continuous production equipment according to the steel belt pipe winding principle, the polyethylene raw materials are heated and molten through a main machine and then extruded into flat belts and the round pipes (including PP pipes), the krah pipes are formed by continuously winding the flat belts around the round pipes and cooled in a water cooling or air cooling mode.

Description

A kind of carat pipe continuous production processes
Technical field
The present invention relates to a carat pipe production field, specifically belong to a kind of carat pipe continuous production processes.
Background technology
Type B HDPE winding structure pipe, be called for short carat pipe, be be main raw material(s) with high-density polyethylene resin, adopting hot winding shaping process, is that supporting construction makes the special construction wall tube material with higher critical external compressive resistance ability with polypropylene (PP) single-wall corrugated pipe.It is compared with traditional steel pipe or pipe of cement, performance characteristics mainly contains: 1, hot Wrapping formed welded seam quality is high, from the flat material strip being in molten condition and the O moulding mixture band of extruding machine die extrusion, be wrapped in uniformly on the drum die of heating by preposition, ensure that structured wall popes welded side seam quality; 2, installation capability is excellent, and pipeline connects employing at the pre-buried electric fuse of bellmouth with material socket joint electric smelting interconnection technique, and quality of connection is high; 3, good pliability, high density polyethylene (HDPE) winding structure wall pipe macroscopically has good pliability, and local pipeline section has very strong rigidity and overall critical external compressive resistance ability, have use under overweight load road surface time, current safety can be ensured; 4, HDPE recovery capable of circulation uses, and belongs to environmental type product, the main raw material(s) high density poly propylene of winding structure pipe, without any toxicity, also raw without any dye produce in process of production, and useless pipeline can 100% recycling; 5, guarantee 50 years anticorrosive, ageing-resistant, service life, high density polyethylene (HDPE) has extremely strong chemical resistance corrosion and the ability of erosion; 6, low, the carrying capacity of inside pipe wall roughness is large, is about 0.010 around structured wall popes product inwall roughness N, and when therefore carrying fluid, specific frictional resistance is little, relatively with the pipe of cement of internal diameter, under equal service condition carrying capacity comparatively pipe of cement can increase substantially.
The technique of this carat pipe of current production, technical process poor continuity, yields poorly, and processing cost is high.
Summary of the invention
The object of this invention is to provide a kind of carat pipe continuous production processes, thus solve Problems existing in background technology.
Technical scheme of the present invention is as follows:
A kind of carat pipe continuous production processes, includes following production stage:
A, batch mixing, drying: the raw material produced needed for carat pipe is added batch mixing unit by regulation proportioning, mix and drying, wherein each material quality percentage is 85-96%HDPE, 0-7%LDPE, 4-8% Masterbatch, the raw material drying time: 60-120min;
B, PE material is extruded: the mixed ingredients through combination drying is transported to extruder hopper, enters plate, materials in the tube mould respectively, extrude plate, materials in the tube, wherein body temperature: 180-210 DEG C after extruder barrel, screw rod heating, shearing plasticizing; Mold temperature: 190-220 DEG C;
C, coated: bellows passes from materials in the tube mold center, is coated on bellows outside with materials in the tube in molten condition, form ribs, wherein molten temperature: 19-220 DEG C, fusion pressure: about 50MPa;
D, once winding: plate is spiral winding on roll shaft, and form tubular base plate in the molten state;
E, secondary are wound around: ribs is wrapped in two plate binding sites of base plate, with bottom plate combined bonding, form carat pipe body;
F, roll shaft draw: carat pipe body moves forward under the draw of the roll shaft circumferentially rotated;
G, cooling: Wrapping formed carat pipe, in distraction procedure, carries out air-cooled or water-cooled, also can naturally cool under guarantee cooling effect prerequisite;
H, cutting: fixed length cutting.
The present invention has following beneficial effect:
It is shaping that the present invention uses continuous production device to adopt steel-belt-pipe to be wound around principle, polyethylene raw material are extruded flat rubber belting, pipe (inside having PP to manage) by main frame heating melting, continuous-winding forming on Wound Dies, its cooling adopts water-cooled or air-cooledly to combine, the product produced does not need gas-firing, reduces cost, can continuous seepage operation, output is high, reliable product quality.
Detailed description of the invention
A kind of carat pipe continuous production processes, includes following production stage:
A, batch mixing, drying: the raw material produced needed for carat pipe is added batch mixing unit by regulation proportioning, mix and drying, wherein each material quality percentage is 85-96%HDPE, 0-7%LDPE, 4-8% Masterbatch, the raw material drying time: 60-120min;
B, PE material is extruded: the mixed ingredients through combination drying is transported to extruder hopper, enters plate, materials in the tube mould respectively, extrude plate, materials in the tube, wherein body temperature: 180-210 DEG C after extruder barrel, screw rod heating, shearing plasticizing; Mold temperature: 190-220 DEG C;
C, coated: bellows passes from materials in the tube mold center, is coated on bellows outside with materials in the tube in molten condition, form ribs, wherein molten temperature: 19-220 DEG C, fusion pressure: about 50MPa;
D, once winding: plate is spiral winding on roll shaft, and form tubular base plate in the molten state;
E, secondary are wound around: ribs is wrapped in two plate binding sites of base plate, with bottom plate combined bonding, form carat pipe body;
F, roll shaft draw: carat pipe body moves forward under the draw of the roll shaft circumferentially rotated;
G, cooling: Wrapping formed carat pipe, in distraction procedure, carries out air-cooled or water-cooled, also can naturally cool under guarantee cooling effect prerequisite;
H, cutting: fixed length cutting.

Claims (1)

1. a carat pipe continuous production processes, is characterized in that, includes following production stage:
A, batch mixing, drying: the raw material produced needed for carat pipe is added batch mixing unit by regulation proportioning, mix and drying, wherein each material quality percentage is 85-96%HDPE, 0-7%LDPE, 4-8% Masterbatch, the raw material drying time: 60-120min;
B, PE material is extruded: the mixed ingredients through combination drying is transported to extruder hopper, enters plate, materials in the tube mould respectively, extrude plate, materials in the tube, wherein body temperature: 180-210 DEG C after extruder barrel, screw rod heating, shearing plasticizing; Mold temperature: 190-220 DEG C;
C, coated: bellows passes from materials in the tube mold center, is coated on bellows outside with materials in the tube in molten condition, form ribs, wherein molten temperature: 19-220 DEG C, fusion pressure: about 50MPa;
D, once winding: plate is spiral winding on roll shaft, and form tubular base plate in the molten state;
E, secondary are wound around: ribs is wrapped in two plate binding sites of base plate, with bottom plate combined bonding, form carat pipe body;
F, roll shaft draw: carat pipe body moves forward under the draw of the roll shaft circumferentially rotated;
G, cooling: Wrapping formed carat pipe, in distraction procedure, carries out air-cooled or water-cooled, also can naturally cool under guarantee cooling effect prerequisite;
H, cutting: fixed length cutting.
CN201510261881.7A 2015-05-21 2015-05-21 Krah pipe continuous production process Pending CN104972666A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510261881.7A CN104972666A (en) 2015-05-21 2015-05-21 Krah pipe continuous production process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510261881.7A CN104972666A (en) 2015-05-21 2015-05-21 Krah pipe continuous production process

Publications (1)

Publication Number Publication Date
CN104972666A true CN104972666A (en) 2015-10-14

Family

ID=54269879

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510261881.7A Pending CN104972666A (en) 2015-05-21 2015-05-21 Krah pipe continuous production process

Country Status (1)

Country Link
CN (1) CN104972666A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107839205A (en) * 2017-09-26 2018-03-27 安徽省中阳管业有限公司 A kind of polyethylene winding structure pipe manufacturing method
CN108016026A (en) * 2017-12-20 2018-05-11 江西金阳管业有限公司 A kind of forming method of HDPE binary wall twisting and pipes
CN108274791A (en) * 2018-02-05 2018-07-13 洪瑞茜 A kind of novel carat pipe preparation process

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5000369A (en) * 1988-11-22 1991-03-19 Allied Tube & Conduit Corporation Method and apparatus for manufacturing plastic-lined pipe
CN1749626A (en) * 2005-08-26 2006-03-22 王利群 Coextruding heat winding structure wall pipe, processing method and method
CN103317729A (en) * 2012-03-23 2013-09-25 青岛福润德塑料挤出技术有限公司 Manufacturing method for online flaring continuously winding thermoforming spiral corrugated pipes
CN103963325A (en) * 2014-04-09 2014-08-06 湖南前元新材料有限公司 Production equipment and production technology for HDPE (high density polyethylene)spirally enwound structure-wall pipe (Krah pipe)

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5000369A (en) * 1988-11-22 1991-03-19 Allied Tube & Conduit Corporation Method and apparatus for manufacturing plastic-lined pipe
CN1749626A (en) * 2005-08-26 2006-03-22 王利群 Coextruding heat winding structure wall pipe, processing method and method
CN103317729A (en) * 2012-03-23 2013-09-25 青岛福润德塑料挤出技术有限公司 Manufacturing method for online flaring continuously winding thermoforming spiral corrugated pipes
CN103963325A (en) * 2014-04-09 2014-08-06 湖南前元新材料有限公司 Production equipment and production technology for HDPE (high density polyethylene)spirally enwound structure-wall pipe (Krah pipe)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107839205A (en) * 2017-09-26 2018-03-27 安徽省中阳管业有限公司 A kind of polyethylene winding structure pipe manufacturing method
CN108016026A (en) * 2017-12-20 2018-05-11 江西金阳管业有限公司 A kind of forming method of HDPE binary wall twisting and pipes
CN108274791A (en) * 2018-02-05 2018-07-13 洪瑞茜 A kind of novel carat pipe preparation process

Similar Documents

Publication Publication Date Title
CN100457420C (en) Extrusion of peroxidic cross-linkable molded plastic parts
CN104017310B (en) A kind of biaxially orienting polyvinyl chloride pipe and preparation method thereof
CN101463158B (en) Not-stretching thermal shrinkage belt base material for pipeline corrosion protection and preparation thereof
CN105086068A (en) Water-absorbing granule for HDPE (high-density polyethylene) tubes, and preparation method and application thereof
CN104893084B (en) A kind of fibre reinforced polyethylene waterproof roll and preparation method
CN103963325B (en) A kind of high density polyethylene (HDPE) winding structure carat pipe production technology
CN102320137B (en) Preparation device of ultra-high molecular weight polyethylene sheets and preparation method thereof
CN103786324A (en) Process for producing double-wall corrugated pipe
CN104972666A (en) Krah pipe continuous production process
CN107216517B (en) Preparation method of ultrahigh molecular weight polyethylene 3D printing supplies
CN108858869A (en) A kind of equipment for producing high dispersive type fluoropolymer master batch
CN108016026B (en) Forming method of HDPE double-wall winding pipe
CN104015370A (en) Preparation process of teflon heat-shrinking tube
KR101815833B1 (en) An extruder for extruding porous plastics
KR101151475B1 (en) The method for recycle cover of the wire
CN104760261A (en) Preparation process of PE (Poly Ethylene) ultra-large-diameter thin-wall pipe material
CN101249719B (en) Extrusion method of super high molecular weight polyethylene nearby melting point
CN107696466A (en) PVC O tubing production methods
CN105500659A (en) Device and process for manufacturing nylon carrier roller tube
CN1986626A (en) No-blocking filtering irrigation rubber-plastic pipe and its production process
KR101570196B1 (en) Prepared by Eco Green Island High rigidity sewers and apparatus and method
CN205148671U (en) Crushing -type waste plastic granulator
CN106084449A (en) HDPE double-wall corrugated pipe and preparation technology thereof
CN101985525B (en) Manufacturing method of polymer modified asphalt
CN209937615U (en) Screw type plastic extrusion device for manufacturing peroxide crosslinked polyethylene pipe

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20151014