CN104963289B - A kind of abnormity pier stud mass concrete overall time pouring construction method - Google Patents

A kind of abnormity pier stud mass concrete overall time pouring construction method Download PDF

Info

Publication number
CN104963289B
CN104963289B CN201510310497.1A CN201510310497A CN104963289B CN 104963289 B CN104963289 B CN 104963289B CN 201510310497 A CN201510310497 A CN 201510310497A CN 104963289 B CN104963289 B CN 104963289B
Authority
CN
China
Prior art keywords
concrete
pier stud
template
pier
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201510310497.1A
Other languages
Chinese (zh)
Other versions
CN104963289A (en
Inventor
高辉
刘鹏飞
李硕
黄海
孙亮
石旭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenyang Municipal Group Co Ltd
Original Assignee
Shenyang Municipal Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenyang Municipal Group Co Ltd filed Critical Shenyang Municipal Group Co Ltd
Priority to CN201510310497.1A priority Critical patent/CN104963289B/en
Publication of CN104963289A publication Critical patent/CN104963289A/en
Application granted granted Critical
Publication of CN104963289B publication Critical patent/CN104963289B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

A kind of abnormity pier stud mass concrete overall time pouring construction method, including front preparation of constructing, pier stud reinforcement fabrication and installation, template loft, the Design and Machining of template, installation, concreting, maintenance, form removal, the operation such as crossbeam stretch-draw, mud jacking construction.The present invention uses large area set shaped steel formwork, assembled by pier body formwork overall time, template periphery purlin system integral reinforcing pier body formwork form, it is achieved that finished product pier shaft is without tie rod hole;It is main for using vibrator as a plug in concrete vibrating is constructed, and attached vibrator is auxiliary vibrating method, substantially increases pier stud finished product overall appearance quality and geometric accuracy, has ensured construction safety simultaneously, saved construction cost.

Description

A kind of abnormity pier stud mass concrete overall time pouring construction method
Technical field
The present invention relates to the technical field of construction of the polymorphic structure thing of armored concrete in urban house, bridge and bridge on highway, be specifically related to a kind of abnormity pier stud mass concrete overall time pouring construction method.
Background technology
Along with in modern urban construction, owing to abnormity pier structure is attractive in appearance, strong adaptability, and save material compared with the solid pier stud of concrete and be extensively designed so that use.The complexity constructed due to it so that the installation of reinforcing bar, template to install difficulty relatively big, particularly abnormity pier pier stud outer dip angle is big, and in mould, working place is little, reinforcing bar is dense more increases concrete construction difficulty.Traditional construction method is that the main muscle of pier shaft is on-the-spot by root spreading, horizontal hoop successively colligation, and pier body formwork is installed by several times, and concrete pours by several times, the most not only long construction period, is easily generated faulting of slab ends, aberration, Appearance quality defect at pier stud body segmentation construction by several times.
Summary of the invention
The purpose of the present invention, is to provide a kind of safe and reliable, and speed of application is fast, saves the special-shaped pier stud mass concrete overall time pouring construction method of resource.
The technical scheme is that
A kind of abnormity pier stud mass concrete primary concreting construction method, use large area set shaped steel formwork, template periphery purlin system integral reinforcing pier body formwork form, the reinforcing mode of " wall-penetrating type is to drawing rod-pulling type " is used in changing conventional template, stability is high, achieve finished product pier shaft without tie rod hole, the assembly of pier body formwork overall time.And it is main for using vibrator as a plug in concrete vibrating is constructed, the vibrating method that attached vibrator is auxiliary avoids the long construction period that conventional construction method causes, the diseases such as faulting of slab ends, aberration, Appearance quality defect it are easily generated, it is characterised in that comprise the steps: at construction
1, the pre-buried location of pier stud reinforcing bar
Before cushion cap roof steel bar installs concrete construction, pier stud is measured unwrapping wire, total powerstation is used to release the vertically and horizontally axis of pier stud, determine the pre-buried position of pier stud reinforcing bar, site operation personnel are foundation according to measurement group unwrapping wire, use interim reinforcing bar anchor block post position, prepare for integral hoisting pier stud reinforcing bar.Disposably lift into position with loop wheel machine, and add temporary support, it is ensured that reinforcing bar not flexural deformation.
2, dabbing, setting-out
After 1 cushion cap pours end; after concrete reaches the intensity that design requires; the concrete of pier stud root (cushion cap top) is carried out dabbing process; it should be noted that protection to reinforcing bar during dabbing; reinforcing bar must not be damaged; cut the laitance on surface to fresh concrete surface, and clean out scum silica frost and chip.
2 surveying setting-out: using total powerstation to release Planar Contours inside and outside the longitudinal and transverse axis of pier stud and post mould at cushion cap end face, ink fountain ejects line, measures surrounding absolute altitude at the bottom of pier, installs and formwork erection benchmark.
The Design and Machining of 3 templates, installation:
1) before template construct, carry out stencil design according to pier stud design drawing, change conventional stencil design pattern, take overall peripheral purlin body to replace traditional " wall-penetrating type " pull bar, it is ensured that Surface Quality of Concrete.Template is by specialty steel construction processing and fabricating, and after processing, on-the-spot examination is spelled, and checks its rigidity, intensity, the stability vertically and horizontally connected and formwork structure size, after meeting design specification requirement, can come into operation.
2) model sheetinstallat.Template construct height considers that the height of column, hoisting transportation are convenient, construction and installation are convenient and formulate, to be suitable for the combination of all kinds of stem height.With contact position, cushion cap surface bottom template, fill and lead up embedding reality with after-pouring column concrete with mortar or other soft matters.Pier stud bottom straight-line segment template uses the mode that four sides is assembled, and vertical formwork inner support, with No. 8 elongated settings of channel-section steel, is laterally enclosed purlin and used 2 No. 16 channel-section steel assembly, and spacing 350mm, adjacent forms is enclosed purlin and fixed with oblique 20mm bolt.Pier stud Y type part first spreads the template outside batter post, then inside back cover side template, adds steel pipe Crossing brace same, and set cable wind rope between two batter posts, the stability of rigidity and template to ensure framed bent.After model sheetinstallat terminates, measurement group is to its repetition measurement, and plan-position, elevation and perpendicularity can carry out next step construction after meeting requirement.
4 concretings: owing to abnormity pier gradient is big, reinforcing bar is dense, and inner space is little, causes concrete vibrating operation to produce bigger difficulty.Using vibrator as a plug for this is main, and the mode that attached vibrator is auxiliary is vibrated.Pier stud concrete uses pumping method to enter mould.Often group column concrete material, selects the sand material with the place of production and the cement of same specification, to ensure the solid colour of each group of column.When pouring needs multilamellar, its off time is the longest must not exceed the concrete presetting period.The slump of concrete controls in the range of code requirement, concrete vibrator uses high frequency poker vibrator, fast inserting is pulled out slowly, when pouring upper strata, poker vibrator extend into lower floor 5-10cm, to ensure comprehensive vibration compacting, should prevent the impact of template vibrated device from deforming or collision slab, reinforcing bar, built-in fitting etc., find when reinforcing bar is trampled or support member shifts, revise in time, forbid operating personnel arbitrarily to walk about on reinforcing bar. Considering to install the adhesion type equipment that vibrates outside privileged sites template to strengthen vibrating, vibrating time determines with conventional experience and test simultaneously.Forbid super shake or leak shake.
5, maintenance, form removal.(with gunnysack or Polypropylence Sheet) and watering maintenance should be covered as early as possible, to keep the wetting state of concrete continuous surface after concrete placings completes to receive slurry.The concrete water seasoning date is not less than 7 days, and it is responsible to set special messenger.Template is removed when concrete compressive strength reaches 2.5MPa, notes protecting concrete surface and corner angle during form removal.Should be clean by template surface mortar dirt removal after form removable, it is deposited into appointment position, concrete surface defect should use the method agreed to through engineer to repair, and forbids to use cement wash and cement plaster.
6, crossbeam stretch-draw, mud jacking construction.After the concrete strength of pier stud reaches design requirement, crossbeam is carried out stretch-draw, mud jacking operation.
Advantages of the present invention
The present invention is by using large area set shaped steel formwork, template periphery purlin system integral reinforcing pier body formwork form, it is achieved that finished product pier shaft is without tie rod hole, and pier body formwork overall time is assembled;It is main for using vibrator as a plug in concrete vibrating is constructed, and attached vibrator is auxiliary vibrating method, substantially increases pier stud finished product overall appearance quality and geometric accuracy, has ensured construction safety simultaneously, saved construction cost.
Accompanying drawing illustrates:
Fig. 1 is construction technology process schematic diagram.
Detailed description of the invention
A kind of abnormity pier stud mass concrete overall time pouring construction method, specifically includes following step:
1, the pre-buried location of pier stud reinforcing bar
Before cushion cap roof steel bar installs concrete construction, measurement group measures unwrapping wire to pier stud, with reference to cap design of pile size: long 1050cm, wide 650cm, using total powerstation to release the vertically and horizontally axis of pier stud, determine the pre-buried position of pier stud reinforcing bar, site operation personnel are foundation according to measurement group unwrapping wire, use interim reinforcing bar anchor block post position, prepare for integral hoisting pier stud reinforcing bar.Disposably lift into position with loop wheel machine, and add temporary support, it is ensured that reinforcing bar not flexural deformation.
2, dabbing, setting-out
1) after cushion cap pours end; after concrete reaches the intensity that design requires; the concrete of pier stud root (cushion cap top) is carried out dabbing process; it should be noted that protection to reinforcing bar during dabbing; damage reinforcing bar not; cut the laitance on surface to fresh concrete surface, and clean out scum silica frost and chip.
2) surveying setting-out: use total powerstation, with reference to pier stud bottom design size: long 2 × 190+a(design is given);Wide by 160, unit: cm, release Planar Contours inside and outside the longitudinal and transverse axis of pier stud and post mould at cushion cap end face, ink fountain ejects line, measures surrounding absolute altitude at the bottom of pier, installs and formwork erection benchmark.
The Design and Machining of 3 templates, installation
1) before template construct, according to pier stud design drawing, overall peripheral purlin body mode is taked to carry out stencil design.
Template is by specialty steel construction processing and fabricating, and after processing, on-the-spot examination is spelled, and checks its rigidity, intensity, the stability vertically and horizontally connected and formwork structure size, after meeting design specification requirement, standby.
2) model sheetinstallat: template construct height considers that the height of column, hoisting transportation are convenient, construction and installation are convenient and formulate, to be suitable for the combination of all kinds of stem height.With contact position, cushion cap surface bottom template, fill and lead up embedding reality with after-pouring column concrete with mortar or other soft matters.Pier stud bottom straight-line segment template uses the mode that four sides is assembled, and vertical formwork inner support, with No. 8 elongated settings of channel-section steel, is laterally enclosed purlin and used 2 No. 16 channel-section steel assembly, and spacing 350mm, adjacent forms is enclosed purlin and fixed with oblique 20mm bolt.Pier stud Y type part first spreads the template outside batter post, then inside back cover side template, adds steel pipe Crossing brace same, and set cable wind rope between two batter posts, the stability of rigidity and template to ensure framed bent.After model sheetinstallat terminates, measurement group is to its repetition measurement, and plan-position, elevation and perpendicularity can carry out next step construction after meeting requirement.
4 concretings
It is main for using vibrator as a plug, and the mode that attached vibrator is auxiliary is vibrated.Pier stud concrete uses pumping method to enter mould.Often group column concrete material, selects the sand material with the place of production and the cement of same specification.When pouring needs multilamellar, its off time is the longest must not exceed the concrete presetting period.The slump of concrete controls in the range of code requirement, concrete vibrator uses high frequency poker vibrator, fast inserting is pulled out slowly, when pouring upper strata, poker vibrator extend into lower floor 5-10cm, should prevent the impact of template vibrated device from deforming or collision slab, reinforcing bar, built-in fitting etc., find, when reinforcing bar is trampled or support member shifts, to revise in time, forbid operating personnel arbitrarily to walk about on reinforcing bar. Considering to install the adhesion type equipment that vibrates outside privileged sites template to strengthen vibrating, vibrating time determines with conventional experience and test simultaneously.Forbid super shake or leak shake.
5, maintenance, form removal
(with gunnysack or Polypropylence Sheet) and watering maintenance should be covered as early as possible, to keep the wetting state of concrete continuous surface after concrete placings completes to receive slurry.The concrete water seasoning date is not less than 7 days, and it is responsible to set special messenger.Template is removed when concrete compressive strength reaches 2.5MPa, notes protecting concrete surface and corner angle during form removal.Should be clean by template surface mortar dirt removal after form removable, it is deposited into appointment position, concrete surface defect should use the method agreed to through engineer to repair, and forbids to use cement wash and cement plaster.
6, crossbeam stretch-draw, mud jacking construction
After the concrete strength of pier stud reaches design requirement, crossbeam is carried out stretch-draw, mud jacking operation.

Claims (1)

1. a special-shaped pier stud mass concrete overall time pouring construction method, use large area set shaped steel formwork, template periphery purlin system integral reinforcing pier body formwork form, when concreting is vibrated simultaneously, use plug-in type and the concrete vibrating mode of adhesion type combination, it is characterised in that comprise the steps:
1), the pre-buried location of pier stud reinforcing bar:
Before cushion cap roof steel bar installs concrete construction, measurement group measures unwrapping wire to pier stud, total powerstation is used to release the vertically and horizontally axis of pier stud, determine the pre-buried position of pier stud reinforcing bar, site operation personnel are foundation according to measurement group unwrapping wire, use interim reinforcing bar anchor block post position, prepare for integral hoisting pier stud reinforcing bar;Disposably lift into position with loop wheel machine, and add temporary support;
2), dabbing, setting-out:
(1), after cushion cap pours end, after concrete reaches the intensity that design requires, the concrete of pier stud root is carried out dabbing process, cut the laitance on surface to fresh concrete surface, and clean out scum silica frost and chip;
(2), surveying setting-out, use total powerstation to release Planar Contours inside and outside the longitudinal and transverse axis of pier stud and post mould at cushion cap end face, ink fountain ejects line, measures surrounding absolute altitude at the bottom of pier, installs and formwork erection benchmark;
3), the Design and Machining of template, installation:
(1), before template construct, carry out stencil design according to pier stud design drawing, take overall peripheral purlin body formula;Template is by specialty steel construction processing and fabricating, and after processing, on-the-spot examination is spelled, and checks its rigidity, intensity, the stability vertically and horizontally connected and formwork structure size, after meeting design specification requirement, standby;
(2), model sheetinstallat: template construct height considers that the height of column, hoisting transportation are convenient, construction and installation are convenient and formulate, to be suitable for the combination of all kinds of stem height;With contact position, cushion cap surface bottom template, fill and lead up embedding reality with after-pouring column concrete with mortar or other soft matters;Pier stud bottom straight-line segment template uses the mode that four sides is assembled, and vertical formwork inner support, with No. 8 elongated settings of channel-section steel, is laterally enclosed purlin and used 2 No. 16 channel-section steel assembly, and spacing 350mm, adjacent forms is enclosed purlin and fixed with oblique 20mm bolt;Pier stud Y type part first spreads the template outside batter post, then inside back cover side template, adds steel pipe Crossing brace same, and set cable wind rope between two batter posts;After model sheetinstallat terminates, measurement group is to its repetition measurement, and plan-position, elevation and perpendicularity can carry out next step construction after meeting requirement;
4), concreting: it is main for using vibrator as a plug, and the mode that attached vibrator is auxiliary is vibrated, and pier stud concrete uses pumping method to enter mould;Often group column concrete material, selects with the sand material in the place of production and the cement of same specification, and when pouring needs multilamellar, its off time is the longest must not exceed the concrete presetting period;The slump of concrete controls in the range of code requirement, concrete vibrator uses high frequency poker vibrator, fast inserting is pulled out slowly, when pouring upper strata, poker vibrator extend into lower floor 5-10cm, should prevent the impact of template vibrated device from deforming or collision slab, reinforcing bar, built-in fitting, find, when reinforcing bar is trampled or support member shifts, to revise in time, forbid operating personnel arbitrarily to walk about on reinforcing bar;Considering to install the adhesion type equipment that vibrates outside privileged sites template to strengthen vibrating, vibrating time determines with conventional experience and test simultaneously;Forbid super shake or leak shake;
5), maintenance, form removal: should cover with gunnysack or Polypropylence Sheet as early as possible and watering maintenance after concrete placings completes to receive slurry, keep the wetting state of concrete continuous surface;The concrete water seasoning date is not less than 7 days, and it is responsible to set special messenger;Template is removed when concrete compressive strength reaches 2.5MPa, and after form removable, concrete surface defect should be repaired, and forbids to use cement wash and cement plaster;
6), crossbeam stretch-draw, mud jacking construction: after the concrete strength of pier stud reaches design requirement, crossbeam is carried out stretch-draw, mud jacking operation.
CN201510310497.1A 2015-06-09 2015-06-09 A kind of abnormity pier stud mass concrete overall time pouring construction method Expired - Fee Related CN104963289B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510310497.1A CN104963289B (en) 2015-06-09 2015-06-09 A kind of abnormity pier stud mass concrete overall time pouring construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510310497.1A CN104963289B (en) 2015-06-09 2015-06-09 A kind of abnormity pier stud mass concrete overall time pouring construction method

Publications (2)

Publication Number Publication Date
CN104963289A CN104963289A (en) 2015-10-07
CN104963289B true CN104963289B (en) 2016-11-02

Family

ID=54217364

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510310497.1A Expired - Fee Related CN104963289B (en) 2015-06-09 2015-06-09 A kind of abnormity pier stud mass concrete overall time pouring construction method

Country Status (1)

Country Link
CN (1) CN104963289B (en)

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105350777A (en) * 2015-11-27 2016-02-24 中国一冶集团有限公司 Device and method for one-time pouring molding of ultra-high concrete column
CN106049283A (en) * 2016-06-05 2016-10-26 中交路桥建设有限公司 Bridge rectangular pier hanging die construction method
CN106012811B (en) * 2016-06-14 2017-12-29 江苏燕宁建设工程有限公司 Vase type pier pier shaft steel bar overall binding construction method for hanging
CN106760503A (en) * 2016-11-22 2017-05-31 江苏大学 A kind of constructional column based on standard knot combination is poured uses template
CN106760546B (en) * 2017-02-03 2023-06-20 山东科技大学 Pouring vibration method and vibration device for large-volume concrete structure construction
CN108952171B (en) * 2018-09-05 2020-10-16 韩春静 Method for carrying out concrete pouring construction by civil engineering pouring device
CN110093852A (en) * 2019-05-15 2019-08-06 平煤神马建工集团有限公司 Shaped form bridge pier Construction technology of fair-faced concrete
CN110578300A (en) * 2019-09-26 2019-12-17 常州市市政建设工程有限公司 Large-volume concrete pouring process for special-shaped bridge pier column
CN113981830A (en) * 2021-11-11 2022-01-28 中交一公局集团有限公司 V-shaped pier construction method
CN114016743B (en) * 2021-11-29 2022-12-02 中国水利水电第七工程局有限公司 Concrete pouring method for large-sized steel-clad reinforced concrete protective door

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100832848B1 (en) * 2007-06-01 2008-05-28 원용석 Method for constructing pier and concrete permanent form applied to it
CN101429752B (en) * 2007-11-05 2010-05-12 中交一航局第一工程有限公司 Pier column prefabrication splicing building technology
CN102251481B (en) * 2011-05-06 2013-11-06 中铁七局集团第一工程有限公司 Railway pier layered construction method and construction device
CN102505636B (en) * 2011-10-28 2014-09-10 中铁十六局集团有限公司 Construction method of No.0 block of continuous rigid frame bridge of double-thin-wall pier
CN103255725B (en) * 2013-06-05 2015-03-25 中建七局(上海)有限公司 Construction method for smooth formwork of concrete supporting column

Also Published As

Publication number Publication date
CN104963289A (en) 2015-10-07

Similar Documents

Publication Publication Date Title
CN104963289B (en) A kind of abnormity pier stud mass concrete overall time pouring construction method
CN102877418B (en) Stentless urban bridge anti-collision guardrail construction method and cradle vehicle and gun carrier thereof
CN109706846B (en) High and narrow bridge capping beam through steel bar construction method for slope foundation
CN103590603B (en) Large span multi-curvature shell structure of reinforced concrete method
CN208280003U (en) A kind of bridge pier over-form construction system
CN101845889A (en) Concrete casting and tamping method of steel tube concrete structure column
CN108532466A (en) A kind of bridge pier over-form construction technique
CN103290967A (en) Multi-ribbed hollow composite floor slab and manufacturing method thereof
CN104452591A (en) Cast-in-place box beam construction technology applied to bridge constructions
CN107100083A (en) A kind of T-shaped high pier Cast-in-place Bent Cap formwork erecting structure and construction method
CN203174510U (en) Movable assembly type hanging basket for bridge anti-collision guardrail construction and formwork for construction
CN207110214U (en) A kind of prefabricated interior fill concrete wallboard
CN206917087U (en) A kind of prefabricated assembling type reinforced concrete framework open tubular column and its making mould
CN108005255A (en) Wall construction method
CN105525571A (en) Construction method of anti-collision wall
CN205742249U (en) A kind of prestressed concrete back cover cushion cap template
CN102605988B (en) Synchronous construction method for chimney lining external concrete
CN106567328A (en) Half-prefabricated reinforced concrete wall-type guardrail construction process
CN104153573A (en) Pouring formwork and construction method for V-shaped cylindrical concrete
CN104947853A (en) Built-in stand type cast-in-place reinforced concrete pillar and construction method
CN101748893B (en) Method for manufacturing high-rise building balcony boards
CN104846745A (en) Urban high-pier support-free formwork turnover construction method
CN106567329A (en) Semi-prefabricated reinforced concrete wall type guardrail
CN114277672B (en) Large-span prestressed concrete bent cap structure and construction method thereof
CN106049288B (en) A kind of cast-in-place annular is encorbelmented pier stud gradation pouring construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161102