CN104948208B - It is a kind of that big constructing structure and method across cavern is laterally extended based on narrow and small underpass - Google Patents
It is a kind of that big constructing structure and method across cavern is laterally extended based on narrow and small underpass Download PDFInfo
- Publication number
- CN104948208B CN104948208B CN201510370457.6A CN201510370457A CN104948208B CN 104948208 B CN104948208 B CN 104948208B CN 201510370457 A CN201510370457 A CN 201510370457A CN 104948208 B CN104948208 B CN 104948208B
- Authority
- CN
- China
- Prior art keywords
- soil body
- cavern
- base tunnel
- excavation
- communication passage
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000000034 method Methods 0.000 title claims abstract description 32
- 239000002689 soil Substances 0.000 claims abstract description 100
- 238000009412 basement excavation Methods 0.000 claims abstract description 46
- 238000010276 construction Methods 0.000 claims abstract description 43
- 238000004891 communication Methods 0.000 claims abstract description 33
- 210000005239 tubule Anatomy 0.000 claims abstract description 22
- 230000002146 bilateral effect Effects 0.000 claims abstract description 7
- 239000011083 cement mortar Substances 0.000 claims abstract description 7
- 238000002347 injection Methods 0.000 claims abstract description 7
- 239000007924 injection Substances 0.000 claims abstract description 7
- 239000011435 rock Substances 0.000 claims abstract description 7
- 230000002457 bidirectional effect Effects 0.000 claims description 10
- 238000005065 mining Methods 0.000 claims description 10
- 229910000831 Steel Inorganic materials 0.000 claims description 9
- 239000010959 steel Substances 0.000 claims description 9
- 230000000903 blocking effect Effects 0.000 claims description 6
- 230000032258 transport Effects 0.000 claims description 6
- 230000015572 biosynthetic process Effects 0.000 claims description 5
- 230000003014 reinforcing effect Effects 0.000 claims description 5
- 230000007704 transition Effects 0.000 claims 1
- 230000008520 organization Effects 0.000 abstract description 5
- 239000007921 spray Substances 0.000 description 4
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
Landscapes
- Lining And Supports For Tunnels (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
Big constructing structure and method across cavern is laterally extended based on narrow and small underpass the present invention relates to a kind of, belongs to hypogee construction applications.Advanced tubule front end of the present invention is provided with extravasating hole, injection cement mortar before excavating, and is distributed in excavation cavern's vault, direction is consistent with cavern excavation direction;Anchor pole is inserted radially into surrounding rock body along cavern, and supporting steelframe is built in base tunnel both sides when excavating bilateral base tunnel, changeover portion is the bench excavation soil body in the base tunnel of both sides;The triangle soil body is located above the bench excavation construction soil body, the top soil body wide with horizontal communication passage at interconnection position;Horizontal communication passage is located between the base tunnel of both sides;The remaining soil body is located above base tunnel section porch.The present invention is conducive to process while carrying out and reasonable link, it is to avoid the interference between each operation;Be conducive to accelerating construction progress, shorten the duration;Be conducive to improving the flexibility of traffic organization.
Description
Technical field
Big constructing structure and method across cavern is laterally extended based on narrow and small underpass the present invention relates to a kind of, belongs to ground
Lower building structure field.
Background technology
Two side-wall pilot tunnel is that Large span cavern excavates a kind of construction method mainly used, but common double -side approach
There is problems with method:One-way construction, construction speed is slower;Traffic organization is limited in hole, particularly logical in existing narrow and small underground
When road laterally extends big across cavern, Large Construction, transporting equipment can not be entered by existing passage, need to depend on small-sized excavating equipment people
Work is excavated and hand haulage's dregs, and traffic organization problem is more notable in construction speed and hole, and construction excavation progress is faster, right
The patency of dregs transportation requires higher.Such as bomb shelter catwalk laterally excavates the antiaircraft cavern of large span, and double -side approach is adopted
Laterally excavated with benching tunnelling method from catwalk after entrance, the excavation of the step top soil body enters blocking channel near feeder connection
Mouthful.
The content of the invention
Slow to solve the construction speed when narrow and small underpass laterally extends Large span cavern, traffic and transport organization is limited
The problem of, big constructing structure and method across cavern is laterally extended based on narrow and small underpass the invention provides a kind of.
The technical scheme is that:It is a kind of that based on narrow and small underpass, laterally enlarging, greatly across the constructing structure of cavern, is wrapped
Include advanced tubule 1, anchor pole 2, supporting steelframe 3, changeover portion 4, the triangle soil body 5, horizontal communication passage 6, the remaining soil body 7;
The front end of advanced tubule 1 is provided with extravasating hole, injection cement mortar before excavating(Reinforcing is played to ravelly ground to make
With the cavern top soil body collapses when preventing from excavating), excavation cavern's vault is distributed in, direction is consistent with cavern excavation direction;Anchor pole
2 are inserted radially into surrounding rock body along cavern, and supporting steelframe 3 is built in base tunnel both sides when excavating bilateral base tunnel and prevents from collapsing, changeover portion 4
For the bench excavation soil body in the base tunnel of both sides;The triangle soil body 5 is located above the bench excavation construction soil body, at interconnection position
The wide top soil body with horizontal communication passage 6;Horizontal communication passage 6 is located between the base tunnel of both sides;The remaining soil body 7 is located at base tunnel
Above section porch.
The advanced tubule 1 is steel pipe, and the anchor pole 2 is reinforcing bar.
A kind of based on narrow and small underpass, laterally enlarging is greatly across the construction method of cavern, and the construction procedure is as follows:
Step1, the both sides punched in existing passage lay shaped steel temporary support, and set advanced tubule 1;Wherein surpass
The preceding grouting of ductule 1 should be closely knit;
Step2, excavate left and right base tunnel in precalculated position and carry out supporting, preliminary bracing steelframe, the model of gib steelframe 3
Selected according to concrete engineering situation;
Step3, base tunnel start to dig step upwards after being formed, and by step, are excavated to tunnel main tunnel arch position and are formed
Changeover portion 4, and continue to excavate the bigger working face of formation forward;
The remaining triangle soil body 5 in Step4, the top of back cutting changeover portion 4, performs supporting in time;
The vault soil body, the middle part soil body in the range of Step5, excavation changeover portion 4, form horizontal communication passage 6, in cavern con struction
Arch system anchor bolt 2 should be applied in time after middle " three-back-shaped " traffic route for forming many UNICOMs, excavation, in time by arch and abutment wall
Steelframe is connected;
Step6, double -side approach continue to construct forward, at the same time take on the left of bidirectional construction, back cutting around base tunnel section
The remaining soil body 7 to cavern's contour line, in mining process the soil body can blocking channel entrance, using horizontal flexible group of communication passage 6
Traffic is knitted, left side base tunnel dregs is delivered into right side base tunnel entrance by interconnection transports passage, and cavern is uprightly excavated termination
Face is protected using Bolt net and jet;
Step7, double -side approach continue to construct forward, still take bidirectional construction, using interconnection back cutting away from existing logical
The Core Soil vault soil body, the middle part soil body in the range of road abutment wall 6m, if mining process produces dregs, influence traffic can be by step 6 method
Traffic route is designed, protection is performed in time, arch and abutment wall steelframe are connected, the upright excavation face in cavern termination uses anchor net
Spray protection;
Step8, treat to excavate the inverted arch soil body after the completion of related work, form the two side-wall pilot tunnel section of standard.
The beneficial effects of the invention are as follows:
1st, process is conducive to while carrying out and reasonable link, it is to avoid the interference between each operation;
2nd, two-way opened digging is carried out after double side wall UNICOM, is conducive to accelerating construction progress, shortens the duration;
3rd, horizontal communication passage connection double side wall, forms many places interface channel in hole and, there is provided a variety of traffic routes, is conducive to
The flexibility of traffic organization is improved, even if the soil body is excavated during two-way excavation blocks catwalk entrance, can also ensure in-cavity construction
Period traffic is unobstructed.
4th, under catwalk execution conditions, the passage proximate Core Soil soil body presses traditional two side-wall pilot tunnel digging operation face
It is small, construction inconvenience, using the horizontal communication passage back cutting core soil body.
Brief description of the drawings
Fig. 1 is working procedure horizontal cross-section of the present invention schematic diagram;
Fig. 2 is working procedure schematic longitudinal section of the present invention;
Fig. 3 is working procedure schematic cross-sectional view of the present invention;
Each label in figure:1- advanced tubules;2- anchor poles;3- supporting steelframes;4- changeover portions;The 5- triangle soil bodys;6- is horizontal
To communication passage;The remaining soil bodys of 7-.
Embodiment
Embodiment 1:It is as Figure 1-3, a kind of that based on narrow and small underpass, laterally enlarging, greatly across the constructing structure of cavern, is wrapped
Include advanced tubule 1, anchor pole 2, supporting steelframe 3, changeover portion 4, the triangle soil body 5, horizontal communication passage 6, the remaining soil body 7;
The front end of advanced tubule 1 is provided with extravasating hole, injection cement mortar before excavating, and is distributed in excavation cavern's vault, side
To consistent with cavern excavation direction;Anchor pole 2 is inserted radially into surrounding rock body along cavern, and supporting steelframe 3 is set up when excavating bilateral base tunnel
In base tunnel both sides, changeover portion 4 is the bench excavation soil body in the base tunnel of both sides;The triangle soil body 5 is located at the bench excavation construction soil body
The top soil body wide with horizontal communication passage 6 at top, interconnection position;Horizontal communication passage 6 be located at both sides base tunnel it
Between;The remaining soil body 7 is located above base tunnel section porch.
The advanced tubule 1 is steel pipe, and the anchor pole 2 is reinforcing bar.
A kind of based on narrow and small underpass, laterally enlarging is greatly across the construction method of cavern, and the construction procedure is as follows:
Step1, the both sides punched in existing passage lay shaped steel temporary support, and set advanced tubule 1;Wherein surpass
The preceding grouting of ductule 1 should be closely knit;
Step2, excavate left and right base tunnel in precalculated position and carry out supporting, preliminary bracing steelframe, the model of gib steelframe 3
Selected according to concrete engineering situation;
Step3, base tunnel start to dig step upwards after being formed, and by step, are excavated to tunnel main tunnel arch position and are formed
Changeover portion 4, and continue to excavate the bigger working face of formation forward;
The remaining triangle soil body 5 in Step4, the top of back cutting changeover portion 4, performs supporting in time;
The vault soil body, the middle part soil body in the range of Step5, excavation changeover portion 4, form horizontal communication passage 6, in cavern con struction
Arch system anchor bolt 2 should be applied in time after middle " three-back-shaped " traffic route for forming many UNICOMs, excavation, in time by arch and abutment wall
Steelframe is connected;
Step6, double -side approach continue to construct forward, at the same time take on the left of bidirectional construction, back cutting around base tunnel section
The remaining soil body 7 to cavern's contour line, in mining process the soil body can blocking channel entrance, using horizontal flexible group of communication passage 6
Traffic is knitted, left side base tunnel dregs is delivered into right side base tunnel entrance by interconnection transports passage, and cavern is uprightly excavated termination
Face is protected using Bolt net and jet;
Step7, double -side approach continue to construct forward, still take bidirectional construction, using interconnection back cutting away from existing logical
The Core Soil vault soil body, the middle part soil body in the range of road abutment wall 6m, if mining process produces dregs, influence traffic can be by step 6 method
Traffic route is designed, protection is performed in time, arch and abutment wall steelframe are connected, the upright excavation face in cavern termination uses anchor net
Spray protection;
Step8, treat to excavate the inverted arch soil body after the completion of related work, form the two side-wall pilot tunnel section of standard.
Embodiment 2:It is as Figure 1-3, a kind of that based on narrow and small underpass, laterally enlarging, greatly across the constructing structure of cavern, is wrapped
Include advanced tubule 1, anchor pole 2, supporting steelframe 3, changeover portion 4, the triangle soil body 5, horizontal communication passage 6, the remaining soil body 7;
The front end of advanced tubule 1 is provided with extravasating hole, injection cement mortar before excavating, and is distributed in excavation cavern's vault, side
To consistent with cavern excavation direction;Anchor pole 2 is inserted radially into surrounding rock body along cavern, and supporting steelframe 3 is set up when excavating bilateral base tunnel
In base tunnel both sides, changeover portion 4 is the bench excavation soil body in the base tunnel of both sides;The triangle soil body 5 is located at the bench excavation construction soil body
The top soil body wide with horizontal communication passage 6 at top, interconnection position;Horizontal communication passage 6 be located at both sides base tunnel it
Between;The remaining soil body 7 is located above base tunnel section porch.
A kind of based on narrow and small underpass, laterally enlarging is greatly across the construction method of cavern, and the construction procedure is as follows:
Step1, the both sides punched in existing passage lay shaped steel temporary support, and set advanced tubule 1;Wherein surpass
The preceding grouting of ductule 1 should be closely knit;
Step2, excavate left and right base tunnel in precalculated position and carry out supporting, preliminary bracing steelframe, the model of gib steelframe 3
Selected according to concrete engineering situation;
Step3, base tunnel start to dig step upwards after being formed, and by step, are excavated to tunnel main tunnel arch position and are formed
Changeover portion 4, and continue to excavate the bigger working face of formation forward;
The remaining triangle soil body 5 in Step4, the top of back cutting changeover portion 4, performs supporting in time;
The vault soil body, the middle part soil body in the range of Step5, excavation changeover portion 4, form horizontal communication passage 6, in cavern con struction
Arch system anchor bolt 2 should be applied in time after middle " three-back-shaped " traffic route for forming many UNICOMs, excavation, in time by arch and abutment wall
Steelframe is connected;
Step6, double -side approach continue to construct forward, at the same time take on the left of bidirectional construction, back cutting around base tunnel section
The remaining soil body 7 to cavern's contour line, in mining process the soil body can blocking channel entrance, using horizontal flexible group of communication passage 6
Traffic is knitted, left side base tunnel dregs is delivered into right side base tunnel entrance by interconnection transports passage, and cavern is uprightly excavated termination
Face is protected using Bolt net and jet;
Step7, double -side approach continue to construct forward, still take bidirectional construction, using interconnection back cutting away from existing logical
The Core Soil vault soil body, the middle part soil body in the range of road abutment wall 6m, if mining process produces dregs, influence traffic can be by step 6 method
Traffic route is designed, protection is performed in time, arch and abutment wall steelframe are connected, the upright excavation face in cavern termination uses anchor net
Spray protection;
Step8, treat to excavate the inverted arch soil body after the completion of related work, form the two side-wall pilot tunnel section of standard.
Embodiment 3:It is as Figure 1-3, a kind of that based on narrow and small underpass, laterally enlarging, greatly across the constructing structure of cavern, is wrapped
Include advanced tubule 1, anchor pole 2, supporting steelframe 3, changeover portion 4, the triangle soil body 5, horizontal communication passage 6, the remaining soil body 7;
The front end of advanced tubule 1 is provided with extravasating hole, injection cement mortar before excavating, and is distributed in excavation cavern's vault, side
To consistent with cavern excavation direction;Anchor pole 2 is inserted radially into surrounding rock body along cavern, and supporting steelframe 3 is set up when excavating bilateral base tunnel
In base tunnel both sides, changeover portion 4 is the bench excavation soil body in the base tunnel of both sides;The triangle soil body 5 is located at the bench excavation construction soil body
The top soil body wide with horizontal communication passage 6 at top, interconnection position;Horizontal communication passage 6 be located at both sides base tunnel it
Between;The remaining soil body 7 is located above base tunnel section porch.
The advanced tubule 1 is steel pipe, and the anchor pole 2 is reinforcing bar.
Embodiment 4:It is as Figure 1-3, a kind of that based on narrow and small underpass, laterally enlarging, greatly across the constructing structure of cavern, is wrapped
Include advanced tubule 1, anchor pole 2, supporting steelframe 3, changeover portion 4, the triangle soil body 5, horizontal communication passage 6, the remaining soil body 7;
The front end of advanced tubule 1 is provided with extravasating hole, injection cement mortar before excavating, and is distributed in excavation cavern's vault, side
To consistent with cavern excavation direction;Anchor pole 2 is inserted radially into surrounding rock body along cavern, and supporting steelframe 3 is set up when excavating bilateral base tunnel
In base tunnel both sides, changeover portion 4 is the bench excavation soil body in the base tunnel of both sides;The triangle soil body 5 is located at the bench excavation construction soil body
The top soil body wide with horizontal communication passage 6 at top, interconnection position;Horizontal communication passage 6 be located at both sides base tunnel it
Between;The remaining soil body 7 is located above base tunnel section porch.
Embodiment 5:As Figure 1-3, it is a kind of that the big construction method across cavern, institute are laterally extended based on narrow and small underpass
State construction procedure as follows:
Step1, the both sides punched in existing passage lay shaped steel temporary support, and set advanced tubule 1;Wherein surpass
The preceding grouting of ductule 1 should be closely knit;
Step2, excavate left and right base tunnel in precalculated position and carry out supporting, preliminary bracing steelframe, the model of gib steelframe 3
Selected according to concrete engineering situation;
Step3, base tunnel start to dig step upwards after being formed, and by step, are excavated to tunnel main tunnel arch position and are formed
Changeover portion 4, and continue to excavate the bigger working face of formation forward;
The remaining triangle soil body 5 in Step4, the top of back cutting changeover portion 4, performs supporting in time;
The vault soil body, the middle part soil body in the range of Step5, excavation changeover portion 4, form horizontal communication passage 6, in cavern con struction
Arch system anchor bolt 2 should be applied in time after middle " three-back-shaped " traffic route for forming many UNICOMs, excavation, in time by arch and abutment wall
Steelframe is connected;
Step6, double -side approach continue to construct forward, at the same time take on the left of bidirectional construction, back cutting around base tunnel section
The remaining soil body 7 to cavern's contour line, in mining process the soil body can blocking channel entrance, using horizontal flexible group of communication passage 6
Traffic is knitted, left side base tunnel dregs is delivered into right side base tunnel entrance by interconnection transports passage, and cavern is uprightly excavated termination
Face is protected using Bolt net and jet;
Step7, double -side approach continue to construct forward, still take bidirectional construction, using interconnection back cutting away from existing logical
The Core Soil vault soil body, the middle part soil body in the range of road abutment wall 6m, if mining process produces dregs, influence traffic can be by step 6 method
Traffic route is designed, protection is performed in time, arch and abutment wall steelframe are connected, the upright excavation face in cavern termination uses anchor net
Spray protection;
Step8, treat to excavate the inverted arch soil body after the completion of related work, form the two side-wall pilot tunnel section of standard.
Above in conjunction with accompanying drawing to the present invention embodiment be explained in detail, but the present invention be not limited to it is above-mentioned
Embodiment, can also be before present inventive concept not be departed from the knowledge that those of ordinary skill in the art possess
Put that various changes can be made.
Claims (3)
1. a kind of laterally extend the big constructing structure across cavern based on narrow and small underpass, it is characterised in that:Led including small in advance
Pipe(1), anchor pole(2), supporting steelframe(3), changeover portion(4), the triangle soil body(5), horizontal communication passage(6), the remaining soil body
(7);
The advanced tubule(1)Front end is provided with extravasating hole, injection cement mortar before excavating, and is distributed in excavation cavern's vault, direction
It is consistent with cavern excavation direction;Anchor pole(2)Surrounding rock body, supporting steelframe are inserted radially into along cavern(3)Set when excavating bilateral base tunnel
Stand on base tunnel both sides, changeover portion(4)For the bench excavation soil body in the base tunnel of both sides;The triangle soil body(5)Applied positioned at bench excavation
Above the work soil body, with horizontal communication passage at interconnection position(6)The wide top soil body;Horizontal communication passage(6)It is located at
Between the base tunnel of both sides;The remaining soil body(7)Above base tunnel section porch.
2. according to claim 1, based on narrow and small underpass, laterally enlarging is greatly across the constructing structure of cavern, and its feature exists
In:The advanced tubule(1)For steel pipe, the anchor pole(2)For reinforcing bar.
3. according to claim 1 or 2 laterally extend the big construction method across cavern, its feature based on narrow and small underpass
It is:Construction procedure is as follows:
Step1, the both sides punched in existing passage lay shaped steel temporary support, and set advanced tubule(1);It is wherein advanced
Ductule(1)Grouting should be closely knit;
Step2, excavate left and right base tunnel in precalculated position and carry out supporting, preliminary bracing steelframe, gib steelframe(3)Model root
Selected according to concrete engineering situation;
Step3, base tunnel start to dig step upwards after being formed, by step, are excavated to tunnel main tunnel arch position and form transition
Section(4), and continue to excavate the bigger working face of formation forward;
Step4, back cutting changeover portion(4)The remaining triangle soil body in top(5), supporting is performed in time;
Step5, excavation changeover portion(4)In the range of the vault soil body, the middle part soil body, form horizontal communication passage(6), in cavern con struction
Arch system anchor bolt should be applied in time after middle " three-back-shaped " traffic route for forming many UNICOMs, excavation(2), in time by arch and side
Wall steelframe is connected;
Step6, double -side approach continue to construct forward, at the same time take remaining around base tunnel section on the left of bidirectional construction, back cutting
The soil body(7)To cavern's contour line, the soil body understands blocking channel entrance in mining process, using horizontal communication passage(6)Flexible group
Traffic is knitted, left side base tunnel dregs is delivered into right side base tunnel entrance by interconnection transports passage, and cavern is uprightly excavated termination
Face is protected using Bolt net and jet;
Step7, double -side approach continue to construct forward, bidirectional construction are still taken, using interconnection back cutting away from existing passage side
The Core Soil vault soil body, the middle part soil body in the range of wall 6m, if mining process produces dregs, influence traffic can be by step(6)Method is set
Traffic route is counted, protection is performed in time, arch and abutment wall steelframe are connected, the upright excavation face in cavern termination uses Bolt net and jet
Protection;
Step8, treat to excavate the inverted arch soil body after the completion of related work, form the two side-wall pilot tunnel section of standard.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510370457.6A CN104948208B (en) | 2015-06-30 | 2015-06-30 | It is a kind of that big constructing structure and method across cavern is laterally extended based on narrow and small underpass |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510370457.6A CN104948208B (en) | 2015-06-30 | 2015-06-30 | It is a kind of that big constructing structure and method across cavern is laterally extended based on narrow and small underpass |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104948208A CN104948208A (en) | 2015-09-30 |
CN104948208B true CN104948208B (en) | 2017-07-28 |
Family
ID=54163216
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510370457.6A Expired - Fee Related CN104948208B (en) | 2015-06-30 | 2015-06-30 | It is a kind of that big constructing structure and method across cavern is laterally extended based on narrow and small underpass |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104948208B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109488347B (en) * | 2018-10-25 | 2021-01-15 | 浙江省隧道工程集团有限公司 | Excavation construction method for special stratum chamber |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU1320429A1 (en) * | 1986-01-03 | 1987-06-30 | Донецкий Филиал Института "Гипроуглеавтоматизация" | Overhead mine manipulator |
SU1321824A1 (en) * | 1985-06-18 | 1987-07-07 | Донецкое Отделение Государственного Научно-Исследовательского Проектно-Конструкторского Института "Гипроуглеавтоматизация" | Self-propelled mine manipulator |
CN101737061A (en) * | 2009-12-24 | 2010-06-16 | 中国水电顾问集团华东勘测设计研究院 | Method for constructing double-arch tunnel by rebuilding and expanding existing single-hole tunnel |
CN102128036A (en) * | 2010-12-24 | 2011-07-20 | 西南交通大学 | Construction method of cross section-expanded loop type depressurizing portal for high-speed railway tunnel |
CN103541734A (en) * | 2013-11-01 | 2014-01-29 | 中铁四局集团有限公司 | Comprehensive blasting damping method for tunnel of underpass civil security building |
CN204851296U (en) * | 2015-06-30 | 2015-12-09 | 昆明理工大学 | Construction structures based on hole room is striden greatly in enlargement of narrow and small underpass side direction |
-
2015
- 2015-06-30 CN CN201510370457.6A patent/CN104948208B/en not_active Expired - Fee Related
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU1321824A1 (en) * | 1985-06-18 | 1987-07-07 | Донецкое Отделение Государственного Научно-Исследовательского Проектно-Конструкторского Института "Гипроуглеавтоматизация" | Self-propelled mine manipulator |
SU1320429A1 (en) * | 1986-01-03 | 1987-06-30 | Донецкий Филиал Института "Гипроуглеавтоматизация" | Overhead mine manipulator |
CN101737061A (en) * | 2009-12-24 | 2010-06-16 | 中国水电顾问集团华东勘测设计研究院 | Method for constructing double-arch tunnel by rebuilding and expanding existing single-hole tunnel |
CN102128036A (en) * | 2010-12-24 | 2011-07-20 | 西南交通大学 | Construction method of cross section-expanded loop type depressurizing portal for high-speed railway tunnel |
CN103541734A (en) * | 2013-11-01 | 2014-01-29 | 中铁四局集团有限公司 | Comprehensive blasting damping method for tunnel of underpass civil security building |
CN204851296U (en) * | 2015-06-30 | 2015-12-09 | 昆明理工大学 | Construction structures based on hole room is striden greatly in enlargement of narrow and small underpass side direction |
Also Published As
Publication number | Publication date |
---|---|
CN104948208A (en) | 2015-09-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104047623B (en) | A kind of big across cavern excavation construction method | |
WO2016095629A1 (en) | Advanced support structure for oversized variable-cross-section tunnel | |
CN110017144B (en) | Loess tunnel three-step construction method considering substrate reinforcement treatment | |
CN106223967B (en) | A kind of great burying rectangle or class rectangle tunneling shield constructing device and method | |
CN108442943A (en) | A kind of branch-cut bridge section tunnel and Double side heading method construction method | |
CN103898916B (en) | Mini stake Composite Braced Retaining Structure and construction method | |
CN104533446A (en) | Construction method and structure of two-layer preliminary support for preventing geological disaster of large-section weak surrounding rock tunnel | |
CN104653197A (en) | Method for constructing extra-large variable cross section tunnel | |
CN107060771A (en) | Middle short tunnel is unidirectionally appeared excavation method | |
CN206174963U (en) | Cross shallow undercut tunnel supporting construction of burying of ground fissure crushed zone | |
CN108005660A (en) | A kind of Optimization of Expressway Tunnel Construction method | |
CN107091101A (en) | Mine shield handing-over tunnel folded type joint design and construction method in the middle part of marine site | |
CN106988760A (en) | Facility-sliding strata tunnel portal reinforcing construction and construction method | |
CN110486021B (en) | Construction method for converting large-section tunnel into two small-section tunnels | |
CN104314578A (en) | Construction method for continuous construction by using shield construction machine and matched station thereof | |
CN207033463U (en) | Mine shield handing-over tunnel folded type joint design in the middle part of marine site | |
CN107905814A (en) | Large span loess tunnel top bar CD construction methods | |
CN103867209A (en) | Method of layered and segmental construction, excavation and holing of transverse passages of vertical shaft of metro | |
CN107165641B (en) | High inclination-angle ladder way opposite direction excavating construction method in thin layer breaking up hard rock stratum | |
CN103939115A (en) | Semi-subsurface excavation method construction shed tunnel method and structure | |
CN109209443A (en) | A kind of construction method of breaking surrounding rock tunnel structure | |
CN205077499U (en) | Double row pile supporting construction with transverse connection component | |
CN204851296U (en) | Construction structures based on hole room is striden greatly in enlargement of narrow and small underpass side direction | |
CN104948208B (en) | It is a kind of that big constructing structure and method across cavern is laterally extended based on narrow and small underpass | |
CN108374674B (en) | Six pilot tunnels, 12 step Underground Space Excavation method for protecting support |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170728 |