CN104806249A CN201510156732.4A CN201510156732A CN104806249A CN 104806249 A CN104806249 A CN 104806249A CN 201510156732 A CN201510156732 A CN 201510156732A CN 104806249 A CN104806249 A CN 104806249A
Authority
CN
China
Prior art keywords
hole
construction method
gun hole
big gun
tunneling construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510156732.4A
Other languages
Chinese (zh)
Other versions
CN104806249B (en
Inventor
严克伍
艾慧
潘振学
金才正
羊再兴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NUCLEAR SHAFT AND ROADWAY ENGINEERING Group Corp.
Nuclear Industry Jingxiang Construction Group Co Ltd
Original Assignee
Nuclear Industrial Well and Tunnel Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nuclear Industrial Well and Tunnel Construction Co Ltd filed Critical Nuclear Industrial Well and Tunnel Construction Co Ltd
Priority to CN201510156732.4A priority Critical patent/CN104806249B/en
Publication of CN104806249A publication Critical patent/CN104806249A/en
Application granted granted Critical
Publication of CN104806249B publication Critical patent/CN104806249B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D1/00Sinking shafts
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D1/00Sinking shafts
    • E21D1/03Sinking shafts mechanically, e.g. by loading shovels or loading buckets, scraping devices, conveying screws
    • E21D1/06Sinking shafts mechanically, e.g. by loading shovels or loading buckets, scraping devices, conveying screws with shaft-boring cutters
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F42AMMUNITION; BLASTING
    • F42DBLASTING
    • F42D1/00Blasting methods or apparatus, e.g. loading or tamping
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F42AMMUNITION; BLASTING
    • F42DBLASTING
    • F42D1/00Blasting methods or apparatus, e.g. loading or tamping
    • F42D1/08Tamping methods; Methods for loading boreholes with explosives; Apparatus therefor
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F42AMMUNITION; BLASTING
    • F42DBLASTING
    • F42D3/00Particular applications of blasting techniques

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Earth Drilling (AREA)

Abstract

The invention relates to an excavating technology of a short silo, in particular to a guiding and tunneling construction method of a short silo. The guiding and tunneling construction method of the short silo comprises the steps: (1) drilling and blasting a guide courtyard; (2) measuring and setting out, precisely measuring a central point of the short silo by a total station, marking, and measuring the excavating scope and drilling position of the short silo; (3) drilling, drilling a blast hole and a central hole by an impactor and a drill bit, wherein the central hole is a hollow hole formed in the middle of the short silo, a plurality of cutting holes are circularly and uniformly formed in a place which is 30-40cm far away from the central hole, a plurality of blast holes are circularly and uniformly formed in a place which is 80-120cm far away from the central hole, and the spaces between the auxiliary blast holes and the cutting holes are between 0.5m and 0.65m; the cutting holes and the auxiliary blast holes are blast holes; (4) charging for explosion. The guiding and tunneling construction method of the short silo is safer to operate and low in labor intensity.

Description

A kind of short vertical shaft pilot shaft tunneling construction method
Technical field
The present invention relates to vertical shaft digging technology, particularly one short vertical shaft pilot shaft tunneling construction method.
Background technology
Building in Hydraulic and Hydro-Power Engineering, generally building gate shaft at diversion tunnel water inlet, delivery port builds surge shaft, gate shaft, surge shaft can be referred to as vertical shaft, and shaft sinking Blasting Excavation is a technology, the safe difficult point of the construction of hydraulic tunnel open excavation; In traditional construction technology, generally drill through an emptying aperture in the middle of adopting to install cage method artificial jewel hole, powder charge blasting in groups excavation from the bottom up, or the mode adopting artificial jewel hole from top to bottom, blasting in groups, hoist engine to promote artificial muck removal is constructed, these methods construction labour intensity is large, progress slow, operating personnel is difficult to safely ensure, particularly when vertical shaft Rock Mass cranny development, safety problem is more outstanding.
Summary of the invention
The object of this invention is to provide a kind of short vertical shaft pilot shaft tunneling construction method, its construction is safer, and labour intensity is low.
Above-mentioned technical purpose of the present invention is achieved by the following technical programs: a kind of short vertical shaft pilot shaft tunneling construction method, comprises
(1) courtyard that leads bores quick-fried;
(2) surveying and locating, uses total powerstation accurately to measure the central point of vertical shaft, and carries out mark, measures pilot shaft excavation scope bore position simultaneously;
(3) hole, impactor and drill bit is used to creep into big gun hole and mesopore, described mesopore is 1 emptying aperture being arranged at middle part, round shape is become to be evenly arranged some easers apart from mesopore 30-40cm distance, distance apart from mesopore 80-120cm becomes round shape to be evenly arranged several auxiliary gun holes, and the spacing of auxiliary gun hole and easer is between 0.5m to 0.65m; Described easer and Dou Weibao hole, auxiliary gun hole;
(4) charge explosion, comprising:
A, plug-hole, transfer to rectangular sand hill bottom big gun hole behind 8-12cm position from well head top, big gun hole by each big gun hole gaging hole degree of depth, then abandon appropriate stemming from top and puddling is real in each big gun hole of shutoff; Top, big gun hole thin sand and soil shutoff after powder charge;
B, powder charge, make bamboo plate according to each hole loaded length, is fixed on bamboo plate, adds explosive binding adhesive tape and pinion bamboo plate and slowly put down to carry out blast hole projectile filling from top along hole wall, and connect detonating fuse with rope between powder stick;
C, explosion, adopt high energy detonator detonates, to complete and on-the-spot and periphery all personnel evacuates to beyond blast warning safe distance, detonate after confirming safety at powder charge line.
As preferably of the present invention, described median pore diameter elects φ 120mm as, blasthole diameter elects φ 90mm as, and described easer is four, and described auxiliary gun hole is six.
As preferably of the present invention, adopt two total powerstation an angle of 90 degrees mutually vertically to control the verticality of drilling rod during boring, the front 1.2-1.8m that often creeps into adjusts once, after creeping into two drilling rods, often tunnels 2.5-3.5 rice and measures adjustment once; Penetration rate is 4.5-5.5min/m, and adds fairlead, to ensure vertical precision of holing.
As preferably of the present invention, after powder charge, big gun hole top shutoff length is 1.2-1.8m.
As preferably of the present invention, described guiding courtyard bores quick-fried being specially, and excavates after bottom vertical shaft well seat, adopt the artificial conventional drilling and blasting method of manual rock drilling machine first to excavate the guiding courtyard of 2 meters of length at adit.
In sum, the present invention has following beneficial effect: present invention process is simple, easy to implement, has than conventional drilling and blasting method the advantage that safety is high, construction cost is low, progress is fast, quality assurance ability is strong; The fixed rig of major diameter, configuration 3 operating personnel such as an employing hidden hole drilling once can complete drilling construction on earth's surface, do mechanization operation reduces labor operation intensity, and operating personnel's personal safety significantly improves; Bore quick-fried operation to operate outward at well, eliminate work high above the ground, without the need to considering that blasting fume impact and roof fall wall caving threaten, construction safety, operating condition are good; Pilot shaft cross dimensions can require select arbitrarily adjustment with excavation according to shaft section area size, shape, in conjunction with vertical shaft wall rock geology exploration data, can conservative control adjust secondary and dig area, thus reduce explosive specific charge and construction cost; Secondary digs the shaping control being more conducive to the shaping bursting quality of vertical shaft; Plant equipment uses less, and boring aperture is large, precision is high, and speed is fast, layering explosion from the bottom up, and general every secondary clearing explosion drilling depth is at 2.0 meters to 3.0 meters, and daily footage can reach more than 5 meters, and construction speed is fast, and the duration shortens greatly.
Detailed description of the invention
This specific embodiment is only explanation of the invention; it is not limitation of the present invention; those skilled in the art can make to the present embodiment the amendment not having creative contribution as required after reading this manual, as long as but be all subject to the protection of Patent Law in right of the present invention.
Embodiment: a kind of short vertical shaft pilot shaft tunneling construction method, comprises,
(1) courtyard that leads bores quick-fried, for ensureing that VCR method bores quick-fried effect, ensure shaft section area Forming Quality, first excavate after bottom vertical shaft well seat at adit, adopt manual rock drilling machine (as YT28 type) artificial conventional drilling and blasting method first to excavate the guiding courtyard of 2 meters of high left and right.
(2) surveying and locating, uses total powerstation accurately to measure the central point of vertical shaft, and carries out mark, measures pilot shaft excavation scope bore position simultaneously.
(3) hole, CL-120Y height blast outdoor Down-hole rolling rig φ 90mm impactor and drill bit is used to creep into mesopore and big gun hole, two total powerstation an angle of 90 degrees are adopted mutually vertically to control the verticality of drilling rod, before often creep into about 1.5m and adjust once, after creeping into two drilling rods, often tunnel 3 meters and measure adjustment once; Keyhole speed is at about 5min/m, and add fairlead, to ensure vertical precision of holing, described mesopore is 1 emptying aperture being arranged at middle part, round shape is become to be evenly arranged some easers apart from mesopore 35cm distance, distance apart from mesopore 100cm becomes round shape to be evenly arranged several auxiliary gun holes, and the spacing of auxiliary gun hole and easer is between 0.5m to 0.65m; Described easer and Dou Weibao hole, auxiliary gun hole.
(4) charge explosion, comprises
A, gaging hole, for layering explosion design provides hole depth, the shape of bottom compensation space height and top board line, lining rope lower part series is adopted to hang 0.5 meter of long Metallic rod, a mooring points is respectively established in the middle part of bar and one end, to the lining rope of Metallic rod be fastened after big gun hole is put into bottom, even up Metallic rod again and slowly up mention top board after gate shaft explosion, measure lining rope record reading, measure each big gun hole hole depth and roof condition, break tether after survey and propose Metallic rod, the quick-fried rear parameter continuing next big gun hole measures, so measure the hole depth in all big gun holes and grasp roof condition, the loaded length in each hole is adjusted according to top board distribution shape, substantially smooth to adjust quick-fried rear top board,
B, plug-hole, the rectangular sand hill of a diameter phi 115mm, length 40cm is tied at gate shaft wellhead platform rope, transfer to bottom big gun hole behind about 10cm position from well head top, big gun hole by each big gun hole gaging hole degree of depth, then abandon appropriate stemming from top and the method for puddling reality to carry out lower stifled big gun hole; Top, big gun hole thin sand and soil shutoff after powder charge, length is 1.5m;
C, powder charge, for controlling powder charge and meet charge constitution requirement well, make bamboo plate according to each hole loaded length, is fixed on bamboo plate by explosive binding, adds adhesive tape pinion the method that bamboo plate slowly puts down along hole wall from top and carry out blast hole projectile filling with rope; For very ensureing propagation of explosion between powder stick, between powder stick, add a detonating fuse connecting line;
D, explosion, adopt high energy detonator detonates, to complete and on-the-spot and periphery all personnel evacuates to beyond 200m blast warning safe distance, detonate after confirming safety at powder charge line;
Check after e, explosion, after explosion, first determined whether blind big gun, through confirming that safety is checked without entering scene after hidden danger, waiting after blasting fume drains in hole, entering in hole and check demolition effect, then measure hole depth, checked whether plug-hole phenomenon; If have, adopt down-the-hole drill hole flushing process, otherwise enter next charge explosion circulation construction.

Claims (5)

1. a short vertical shaft pilot shaft tunneling construction method, is characterized in that, comprise
(1) courtyard that leads bores quick-fried;
(2) surveying and locating, uses total powerstation accurately to measure the central point of vertical shaft, and carries out mark, measures pilot shaft excavation scope bore position simultaneously;
(3) hole, impactor and drill bit is used to creep into big gun hole and mesopore, described mesopore is 1 emptying aperture being arranged at middle part, round shape is become to be evenly arranged some easers apart from mesopore 30-40cm distance, distance apart from mesopore 80-120cm becomes round shape to be evenly arranged several auxiliary gun holes, and the spacing of auxiliary gun hole and easer is between 0.5m to 0.65m; Described easer and Dou Weibao hole, auxiliary gun hole;
(4) charge explosion, comprising:
A, plug-hole, transfer to rectangular sand hill bottom big gun hole behind 8-12cm position from well head top, big gun hole by each big gun hole gaging hole degree of depth, then abandon appropriate stemming from top and puddling is real in each big gun hole of shutoff; Top, big gun hole thin sand and soil shutoff after powder charge;
B, powder charge, make bamboo plate according to each hole loaded length, is fixed on bamboo plate, adds explosive binding adhesive tape and pinion bamboo plate and slowly put down to carry out blast hole projectile filling from top along hole wall, and connect detonating fuse with rope between powder stick;
C, explosion, adopt high energy detonator detonates, to complete and on-the-spot and periphery all personnel evacuates to beyond blast warning safe distance, detonate after confirming safety at powder charge line.
2. one according to claim 1 short vertical shaft pilot shaft tunneling construction method, is characterized in that, described median pore diameter elects φ 120mm as, blasthole diameter elects φ 90mm as, and described easer is four, and described auxiliary gun hole is six.
3. one according to claim 1 short vertical shaft pilot shaft tunneling construction method, it is characterized in that, two total powerstation an angle of 90 degrees are adopted mutually vertically to control the verticality of drilling rod during boring, before often creep into 1.2-1.8m adjust once, after creeping into two drilling rods, often tunnel 2.5-3.5 rice and measure adjustment once; Penetration rate is 4.5-5.5min/m, and adds fairlead, to ensure vertical precision of holing.
4. one according to claim 1 short vertical shaft pilot shaft tunneling construction method, is characterized in that, after powder charge, big gun hole top shutoff length is 1.2-1.8m.
5. one according to claim 1 short vertical shaft pilot shaft tunneling construction method, it is characterized in that, described guiding courtyard bores quick-fried being specially, and excavates after bottom vertical shaft well seat, adopt the artificial conventional drilling and blasting method of manual rock drilling machine first to excavate the guiding courtyard of 2 meters of length at adit.
CN201510156732.4A 2015-04-03 2015-04-03 A kind of short vertical shaft pilot shaft tunneling construction method Active CN104806249B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510156732.4A CN104806249B (en) 2015-04-03 2015-04-03 A kind of short vertical shaft pilot shaft tunneling construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510156732.4A CN104806249B (en) 2015-04-03 2015-04-03 A kind of short vertical shaft pilot shaft tunneling construction method

Publications (2)

Publication Number Publication Date
CN104806249A true CN104806249A (en) 2015-07-29
CN104806249B CN104806249B (en) 2016-05-04

Family

ID=53691401

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510156732.4A Active CN104806249B (en) 2015-04-03 2015-04-03 A kind of short vertical shaft pilot shaft tunneling construction method

Country Status (1)

Country Link
CN (1) CN104806249B (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105401946A (en) * 2015-10-27 2016-03-16 中国水利水电第三工程局有限公司 Reverse blasting excavation method of shaft and pilot shaft
CN106403740A (en) * 2016-11-25 2017-02-15 葛洲坝易普力四川爆破工程有限公司 Method for accurately controlling direction of obliquely downward smooth blasting hole in excavating of structural surface
CN107091094A (en) * 2017-06-20 2017-08-25 中国水利水电第五工程局有限公司 Short inclined shaft pilot shaft excavation method in one kind
CN107905792A (en) * 2017-11-27 2018-04-13 新疆北方建设集团有限公司 A kind of embedded shaft excavation construction technology
CN108374661A (en) * 2018-02-06 2018-08-07 浙江省隧道工程公司 A kind of middle pilot shaft shaft formatting by one blasting method
CN109539915A (en) * 2018-12-27 2019-03-29 攀钢集团工程技术有限公司 Slot raise blasting construction method
CN111649634A (en) * 2020-07-03 2020-09-11 中国水利水电第四工程局有限公司 A short shaft expansion blasting construction method
CN111894596A (en) * 2020-07-27 2020-11-06 广西路桥工程集团有限公司 Vertical shaft raise construction method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4701073A (en) * 1984-12-05 1987-10-20 Sainsbury Garrett Michael Shaft sinking method
CN101487376A (en) * 2009-02-14 2009-07-22 中国葛洲坝集团股份有限公司 One-time excavation construction method for large-diameter large-depth pressure regulating well pilot shaft
CN102305075A (en) * 2011-06-28 2012-01-04 中国水利水电第五工程局有限公司 Vertical shaft construction method under unfavorable geological condition
CN102401616A (en) * 2011-10-11 2012-04-04 中国矿业大学(北京) Vertical shaft blasting tunneling method
CN102635359A (en) * 2012-04-13 2012-08-15 中铁十七局集团第三工程有限公司 Energy-saving rapid construction method for ventilating shafts of tunnels
CN103184872A (en) * 2013-03-20 2013-07-03 中国水利水电第十四工程局有限公司 Construction method of one-time excavation for large-section vertical well

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4701073A (en) * 1984-12-05 1987-10-20 Sainsbury Garrett Michael Shaft sinking method
CN101487376A (en) * 2009-02-14 2009-07-22 中国葛洲坝集团股份有限公司 One-time excavation construction method for large-diameter large-depth pressure regulating well pilot shaft
CN102305075A (en) * 2011-06-28 2012-01-04 中国水利水电第五工程局有限公司 Vertical shaft construction method under unfavorable geological condition
CN102401616A (en) * 2011-10-11 2012-04-04 中国矿业大学(北京) Vertical shaft blasting tunneling method
CN102635359A (en) * 2012-04-13 2012-08-15 中铁十七局集团第三工程有限公司 Energy-saving rapid construction method for ventilating shafts of tunnels
CN103184872A (en) * 2013-03-20 2013-07-03 中国水利水电第十四工程局有限公司 Construction method of one-time excavation for large-section vertical well

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105401946A (en) * 2015-10-27 2016-03-16 中国水利水电第三工程局有限公司 Reverse blasting excavation method of shaft and pilot shaft
CN106403740A (en) * 2016-11-25 2017-02-15 葛洲坝易普力四川爆破工程有限公司 Method for accurately controlling direction of obliquely downward smooth blasting hole in excavating of structural surface
CN107091094A (en) * 2017-06-20 2017-08-25 中国水利水电第五工程局有限公司 Short inclined shaft pilot shaft excavation method in one kind
CN107905792A (en) * 2017-11-27 2018-04-13 新疆北方建设集团有限公司 A kind of embedded shaft excavation construction technology
CN108374661A (en) * 2018-02-06 2018-08-07 浙江省隧道工程公司 A kind of middle pilot shaft shaft formatting by one blasting method
CN109539915A (en) * 2018-12-27 2019-03-29 攀钢集团工程技术有限公司 Slot raise blasting construction method
CN111649634A (en) * 2020-07-03 2020-09-11 中国水利水电第四工程局有限公司 A short shaft expansion blasting construction method
CN111894596A (en) * 2020-07-27 2020-11-06 广西路桥工程集团有限公司 Vertical shaft raise construction method

Also Published As

Publication number Publication date
CN104806249B (en) 2016-05-04

Similar Documents

Publication Publication Date Title
CN104806249B (en) A kind of short vertical shaft pilot shaft tunneling construction method
CN108286920B (en) Implementation method for tunnel blasting and excavation
CN106524844B (en) Boulder reconnoitres the construction method with explosion treatment along a kind of shield tunnel
CN103629980B (en) Near existing line steep massif Loose Control Blasting construction method
CN104790978B (en) The tunnel ring-shaped base tunnel construction method of small interval crossings on different level
CN102493822A (en) Method for performing curtain grouting construction on tunnel by water rich fault influence zone
CN109026039A (en) Subway tunnel shield tunnels boulder deep hole blasting and pre-processes construction method
CN112179227A (en) Coal face ultra-deep hole blasting roof cutting pressure relief control method and blasting charge structure
CN101806066B (en) Method for molding vertical wall of deep foundation pit
CN106677786B (en) A kind of ultra-deep big cross section vertical shaft shaft formatting by one blasting method based on electric detonator
CN104748632A (en) Underwater rock plug blasting construction method
CN104532818A (en) Treatment method for strip mine goaf
CN109252868A (en) Hard-soft heterogeneous ground shield-tunneling construction boulder and basement rock protrusion processing method
CN105401946A (en) Reverse blasting excavation method of shaft and pilot shaft
CN104913696A (en) Side slope excavation smooth-surface blasting-method construction method
CN101793486A (en) High-grade highway rock cutting blasting construction process
CN109000525A (en) A kind of shield driving upper-soft lower-hard ground presplit blasting construction method
CN113404498B (en) VCR mining method
CN112922606A (en) Full-section smooth blasting construction method suitable for all-computer three-arm rock drilling jumbo for III-grade and IV-grade surrounding rock large-section railway tunnels
CN110206547B (en) Method suitable for shaft tunneling and supporting in deep stratum and high-stress area
CN106638693A (en) Dismantling construction method of immersed tunnel steel-pipe pile concrete wall by drilling and blasting
CN107762399A (en) Explosion coordinates rotary drilling rig deep layer one-step pore-creating construction method
CN112031738A (en) Construction method of vertical shaft slag sliding well raise boring machine with diameter of 4-6 m
CN102031782A (en) Layered inclined hole blast construction method for multilayer complex quicksand foundation
CN106285731A (en) The little courtyard radiant type of a kind of high Large chamber and the mixed construction method of step

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 313000 No. 666 Huanzhu Road, Wuxing District, Huzhou City, Zhejiang Province

Patentee after: NUCLEAR INDUSTRY WELL AND ROADWAY CONSTRUCTION GROUP Co.,Ltd.

Address before: 313000 No. 666 Huanzhu Road, Wuxing District, Huzhou City, Zhejiang Province

Patentee before: NUCLEAR SHAFT AND ROADWAY ENGINEERING Group Corp.

Address after: 313000 No. 666 Huanzhu Road, Wuxing District, Huzhou City, Zhejiang Province

Patentee after: NUCLEAR SHAFT AND ROADWAY ENGINEERING Group Corp.

Address before: 313000 No. 666 Huanzhu Road, Wuxing District, Huzhou City, Zhejiang Province

Patentee before: NUCLEAR IND WELL & TUNNEL CONSTRUCTION Co.

CP02 Change in the address of a patent holder
CP02 Change in the address of a patent holder

Address after: No. 581, Fenghuang Road, Huzhou City, Zhejiang Province, 313000

Patentee after: NUCLEAR INDUSTRY WELL AND ROADWAY CONSTRUCTION GROUP Co.,Ltd.

Address before: 313000 No. 666 Huanzhu Road, Wuxing District, Huzhou City, Zhejiang Province

Patentee before: NUCLEAR INDUSTRY WELL AND ROADWAY CONSTRUCTION GROUP Co.,Ltd.