CN104790424B - 风力发电塔基础环基础的加固系统及其加固方法 - Google Patents
风力发电塔基础环基础的加固系统及其加固方法 Download PDFInfo
- Publication number
- CN104790424B CN104790424B CN201510183824.1A CN201510183824A CN104790424B CN 104790424 B CN104790424 B CN 104790424B CN 201510183824 A CN201510183824 A CN 201510183824A CN 104790424 B CN104790424 B CN 104790424B
- Authority
- CN
- China
- Prior art keywords
- foundation
- foundation ring
- anchor pole
- ring
- girder steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Wind Motors (AREA)
Abstract
本发明涉及一种风力发电塔基础环基础的加固系统及其加固方法,该系统包括:基础环基础(1)和风机塔筒(2),基础环基础(1)包括基础底板(10),混凝土柱墩(9),基础环(8),基础环(8)与风机塔筒(2)连接;基础环(8)外侧及混凝土柱墩(9)顶部对称地布置有钢梁(5),钢梁(5)围绕基础环(8)形成正六边形区域,在正六边形钢梁(5)周围及基础环(8)外侧浇筑有钢骨混凝土梁(6);钢梁(5)的两端与预应力锚杆组合件(7)连接;预应力锚杆组合件(7)下端锚固在基础底板(10)内。本发明通过对预应力锚杆施加预拉力,使基础环周边混凝土产生预压应力,可以从根本上解决基础环基础因疲劳而产生开裂的问题。
Description
技术领域
本发明属于风力发电塔基础加固技术领域,具体涉及一种风力发电塔基础环基础的加固系统及其加固方法。
背景技术
目前埋入式塔筒基础在国内风电市场具有一定的占有率。然而,该塔筒基础受到基础深度的限制,导致埋入段埋入基础过浅,大约只有0.3~0.4倍的风机塔筒直径。而根据《钢结构设计规范》(GB50017-2003)第8.4.15条,插入式柱脚插入最小深度为1.5d(d为圆管柱的外径),而实际基础环埋入深度仅为0.3d~0.4d远不足1.5d。由于塔筒埋深浅,塔筒侧向力提供的抗弯能力比较有限。埋入式塔筒这种过浅的埋入深度时而会导致基础因疲劳荷载而产生的破坏,在钢筒埋入部分处造成影响结构安全的裂缝。作为一种特殊的型钢混凝土结构,塔筒和混凝土在承载的过程中由于两种材料性能不同,变形不能协调一致。在高周反复疲劳荷载作用下,塔筒和混凝土之间的握裹力随着振动而消失,塔筒壁和基础之间脱开;背风侧基础表面混凝土在塔筒受压冲击作用下发生局部破坏。
这种裂缝直接导致了风机摇摆过大而停机。目前现有的修复技术是直接对塔筒裂缝处灌浆,这种处理方法仅仅能在短时间解决裂缝的问题,然而在疲劳荷载下,集中的应力区依旧会在短期内生成裂缝。
因此,很有必要在现有技术的基础之上,设计研发一种结构设计合理,牢固稳定,可有效解决基础环基础疲劳破坏的加固系统及其加固的方法。
发明内容
发明目的:本发明的目的在于提供一种结构设计合理,牢固稳定,易于实施,可有效解决基础环基础疲劳破坏的风力发电塔基础环基础的加固系统。本发明另一个目的是提供风力发电塔基础环基础的加固方法。该方法可从根本上解决基础环基础因疲劳而产生开裂破坏的问题。
技术方案:一种风力发电塔基础环基础的加固系统,该系统包括:
基础环基础和风机塔筒,所述的基础环基础包括基础底板,连接在基础底板上的混凝土柱墩,下端埋入在混凝土柱墩内的基础环,所述的基础环上端通过法兰与风机塔筒连接;
所述的基础环外侧及混凝土柱墩顶部对称地布置有6根钢梁,相邻两根钢梁交叉处焊接,钢梁中间采用螺栓拼接;6根钢梁围绕基础环形成正六边形区域,在正六边形钢梁周围及基础环外侧浇筑有钢骨混凝土梁;
所述的钢梁的两端与预应力锚杆组合件连接;预应力锚杆组合件下端锚固在基础底板内。
作为优选方案,以上所述的风力发电塔基础环基础的加固系统,所述的预应力锚杆组合件为2个。
作为优选方案,以上所述的风力发电塔基础环基础的加固系统,所述的预应力锚杆组合件包括上锚杆、转接梁和下锚杆,上锚杆上端穿过钢梁锚固在钢梁顶面,上锚杆下端穿过转接梁锚固在转接梁底面;下锚杆上端穿过转接梁锚固在转接梁顶面,下锚杆下端锚固在基础底板内。
作为优选方案,以上所述的风力发电塔基础环基础的加固系统,所述的下锚杆在基础底板内的锚固分为上下两部分:下部为锚固段,锚杆与混凝土之间注入有环氧树脂;上部为自由段,外套有PVC套管,所述的转接梁与基础底板之间为现浇高强砂浆垫块。
本发明提供的风力发电塔基础环基础的加固方法,其包括以下步骤:
a、将高强灌浆料注入基础环底法兰上部的损伤空洞,形成高强灌浆料填缝;
b、将环氧树脂注入基础环与柱墩之间的裂缝,形成环氧树脂填缝;
c、在基础底板上钻孔,插入下锚杆,并在下锚杆下部外周注入环氧树脂,在下锚杆上部套上PVC套管,然后在基础底板顶面浇筑高强砂浆垫块,然后在高强砂浆垫块上放置转接梁,张拉下锚杆并将其锚固在转接梁顶面;
d、在基础环外侧及混凝土柱墩顶部对称地布置6根钢梁,相邻两根钢梁交叉处焊接,钢梁中间用螺栓拼接;6根钢梁围绕基础环形成正六边形区域,然后在钢梁周围绑扎构造钢筋,就位后用螺栓连接成一体,然后在6根钢梁形成的正六边形区域外侧支撑模板,浇筑混凝土,形成钢骨混凝土梁;并且基础环与内接圆与六边形的空隙也浇筑混泥土,以提高梁与塔筒的整体性;
e、然后将上锚杆下端穿过转接梁并锚固在转接梁底面,使上锚杆上端穿过钢梁,对上锚杆进行张拉,张拉完毕后将锚杆锚固在钢梁顶面,完成对基础环周边易疲劳开裂的部位施加预压力,实现风力发电塔基础环基础的加固。
本发明和现有技术相比具有以下有益效果:
1.本发明提供的风力发电塔基础环基础的加固系统,结构设计合理,牢固稳定,易于实施,可有效解决基础环基础疲劳破坏。
2.本发明提供的风力发电塔基础环基础的加固方法,可操作性强,除对基础环基础混凝土中的裂缝进行处理外,还对基础环周边易疲劳开裂的部位施加预压力,减少这些部位在风机疲劳荷载作用下产生的拉应力,使之不会再开裂。另外,预应力使混凝土多向受压,强度提高。
3.本发明预应力以正六边形平面分布的组合钢骨混凝土梁压紧在混凝土柱墩上表面实现;钢骨混凝土梁还可以增加基础环埋深,产生侧向压力,使作用在基础环底法兰的锚固力减小。
4.本发明钢梁端部用预应力锚杆组合件锚入基础底板;预应力锚杆组合件的上锚杆和下锚杆之间连接转接梁,使上锚杆和下锚杆有双重预应力作用,进一步减少锚杆受拉的疲劳应力幅,使锚杆的锚固作用更稳定。
本发明施工方便,可从根本上解决基础环基础因疲劳而产生开裂的问题。
附图说明
图1为本发明一种风力发电塔基础环基础的加固系统的平面结构示意图。
图2为待加固基础环基础剖面结构示意图。
图3为图1的A-A剖面图。
图4为图1的B-B剖面图。
图5为图4的C-C剖面图,即预应力锚杆组合件结构示意图。
其中:1为基础环基础;2为风机塔筒;3为环氧树脂填缝物;4为高强灌浆料填缝物;5为钢梁;6为钢骨混凝土梁;7为预应力锚杆组合件;8为基础环;9为混凝土柱墩;10为基础底板;11为裂缝;12为损伤空洞;13为上锚杆;14为转接梁;15为下锚杆;16为环氧树脂;17为PVC套管;18为高强砂浆垫块。
具体实施方式
下面结合具体实施例,进一步阐述本发明。应理解,这些实施例仅用于说明本发明而不用于限制本发明的范围。此外应理解,在阅读了本发明讲授的内容之后,本领域技术人员可以对本发明作各种改动或修改,这些等价形式同样落于本申请所附权利要求书所限定的范围。
实施例1
如图1至图5所示,一种风力发电塔基础环基础的加固系统,其该系统包括:
基础环基础(1)和风机塔筒(2),所述的基础环基础(1)包括基础底板(10),连接在基础底板(10)上的混凝土柱墩(9),下端埋入在混凝土柱墩(9)内的基础环(8),所述的基础环(8)上端通过法兰与风机塔筒(2)连接;
所述的基础环(8)外侧及混凝土柱墩(9)顶部对称地布置有6根钢梁(5),相邻两根钢梁(5)交叉处焊接,钢梁(5)中间采用螺栓拼接;6根钢梁(5)围绕基础环(8)形成正六边形区域,在正六边形钢梁(5)周围及基础环(8)外侧浇筑有钢骨混凝土梁(6);
所述的钢梁(5)的两端与预应力锚杆组合件(7)连接;预应力锚杆组合件(7)下端锚固在基础底板(10)内。
以上所述的风力发电塔基础环基础的加固系统,所述的预应力锚杆组合件(7)包括上锚杆(13)、转接梁(14)和下锚杆(15),上锚杆(13)上端穿过钢梁(5)锚固在钢梁(5)顶面,上锚杆(13)下端穿过转接梁(14)锚固在转接梁(14)底面;下锚杆(15)上端穿过转接梁(14)锚固在转接梁(14)顶面,下锚杆(15)下端锚固在基础底板(10)内。
以上所述的风力发电塔基础环基础的加固系统,所述的下锚杆(15)在基础底板(10)内的锚固分为上下两部分:下部为锚固段,锚杆与混凝土之间注入有环氧树脂(16);上部为自由段,外套有PVC套管(17),所述的转接梁(14)与基础底板(10)之间为现浇高强砂浆垫块(18)。
实施例2
如图1至图5所示,一种风力发电塔基础环基础的加固方法,其特征在于,包括以下步骤:
a、将高强灌浆料注入基础环(8)底法兰上部的损伤空洞(12),形成高强灌浆料填缝物(4);
b、将环氧树脂注入基础环(8)与柱墩(9)之间的裂缝(11),形成环氧树脂填缝物(3);
c、在基础底板(10)上钻孔,插入下锚杆(15),并在下锚杆(15)下部外周注入环氧树脂(16),在下锚杆(15)上部套上PVC套管(17),然后在基础底板(10)顶面浇筑高强砂浆垫块(18),然后在高强砂浆垫块(18)上放置转接梁(14),张拉下锚杆(15)并将其锚固在转接梁(14)顶面;
d、在基础环(8)外侧及混凝土柱墩(9)顶部对称地布置6根钢梁(5),相邻两根钢梁(5)交叉处焊接,钢梁(5)中间用螺栓拼接;6根钢梁(5)围绕基础环(8)形成正六边形区域,然后在钢梁(5)周围绑扎构造钢筋,就位后用螺栓连接成一体,然后在6根钢梁(5)形成的正六边形区域外侧支撑模板,浇筑混凝土,形成钢骨混凝土梁(6);
e、然后将上锚杆(13)下端穿过转接梁(14)并锚固在转接梁(14)底面,使上锚杆(13)上端穿过钢梁(5),对上锚杆(13)进行张拉,张拉完毕后将锚杆(13)锚固在钢梁(5)顶面,完成对基础环(8)周边易疲劳开裂的部位施加预压力,实现风力发电塔基础环基础的加固。
以上实施方式只为说明本发明的技术构思及特点,其目的在于让熟悉此项技术的人了解本发明内容并加以实施,并不能以此限制本发明的保护范围,凡根据本发明精神实质所做的等效变化或修饰,都应涵盖在本发明的保护范围内。
Claims (1)
1.一种风力发电塔基础环基础的加固方法,其特征在于,包括以下步骤:
a、将高强灌浆料注入基础环(8)底法兰上部的损伤空洞(12),形成高强灌浆料填缝物(4);
b、将环氧树脂注入基础环(8)与柱墩(9)之间的裂缝(11),形成环氧树脂填缝物(3);
c、在基础底板(10)上钻孔,插入下锚杆(15),并在下锚杆(15)下部外周注入环氧树脂(16),在下锚杆(15)上部套上PVC套管(17),然后在基础底板(10)顶面浇筑高强砂浆垫块(18),然后在高强砂浆垫块(18)上放置转接梁(14),张拉下锚杆(15)并将其锚固在转接梁(14)顶面;
d、在基础环(8)外侧及混凝土柱墩(9)顶部对称地布置6根钢梁(5),相邻两根钢梁(5)交叉处焊接,钢梁(5)中间用螺栓拼接;6根钢梁(5)围绕基础环(8)形成正六边形区域,然后在钢梁(5)周围绑扎构造钢筋,就位后用螺栓连接成一体,然后在6根钢梁(5)形成的正六边形区域外侧支撑模板,浇筑混凝土,形成钢骨混凝土梁(6);
e、然后将上锚杆(13)下端穿过转接梁(14)并锚固在转接梁(14)底面,使上锚杆(13)上端穿过钢梁(5),对上锚杆(13)进行张拉,张拉完毕后将锚杆(13)锚固在钢梁(5)顶面,完成对基础环(8)周边易疲劳开裂的部位施加预压力,实现风力发电塔基础环基础的加固。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510183824.1A CN104790424B (zh) | 2015-04-17 | 2015-04-17 | 风力发电塔基础环基础的加固系统及其加固方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510183824.1A CN104790424B (zh) | 2015-04-17 | 2015-04-17 | 风力发电塔基础环基础的加固系统及其加固方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104790424A CN104790424A (zh) | 2015-07-22 |
CN104790424B true CN104790424B (zh) | 2016-07-20 |
Family
ID=53555578
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510183824.1A Active CN104790424B (zh) | 2015-04-17 | 2015-04-17 | 风力发电塔基础环基础的加固系统及其加固方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104790424B (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2019093514A1 (en) * | 2017-11-13 | 2019-05-16 | Tokyo Institute Of Technology | Joining structure for a steel member having an end part embedded in a concrete member |
Families Citing this family (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105040726B (zh) * | 2015-08-04 | 2017-03-08 | 上海风畅土木工程技术有限公司 | 一种用于对风机基础环连接施加环向预应力的方法 |
CN105133677B (zh) * | 2015-08-19 | 2016-12-07 | 黑龙江省林禾风电测控科技有限公司 | 风力发电机组基础加固系统及加固方法 |
CN105756081B (zh) * | 2016-05-05 | 2017-11-24 | 江苏金海新能源科技有限公司 | 自锁头预应力钢绞线圆台砼筒海上风机基础及其施工方法 |
US10544559B2 (en) | 2016-11-02 | 2020-01-28 | Inventus Holdings, Llc | Pier and mat foundation fortification and monitoring system |
US10815969B2 (en) | 2016-11-10 | 2020-10-27 | General Electric Company | Methods and apparatus for refurbishing wind turbine foundations |
CN106592660A (zh) * | 2016-12-21 | 2017-04-26 | 神华集团有限责任公司 | 风机基础的修复方法 |
CN108755740B (zh) * | 2018-08-28 | 2023-08-04 | 同济大学建筑设计研究院(集团)有限公司 | 一种自应力式风力发电塔基础环基础加固系统及加固方法 |
CN111155571A (zh) * | 2019-12-25 | 2020-05-15 | 湖北瑞宏新能源设备有限公司 | 一种风力发电机基础锚栓加固结构及基础锚栓断裂加固方法 |
CN111379669A (zh) * | 2020-03-24 | 2020-07-07 | 国电联合动力技术有限公司 | 一种风机基础混凝土台柱的加固装置及加固方法 |
CN113684873A (zh) * | 2020-05-19 | 2021-11-23 | 北京金风科创风电设备有限公司 | 风力发电机组的基础的加固系统、塔架系统及加固方法 |
CN111810364B (zh) * | 2020-06-15 | 2021-11-19 | 中国电建集团华东勘测设计研究院有限公司 | 用于风力发电机组塔筒的齿轮加强型中空风机基础结构 |
CN113092290B (zh) * | 2021-03-26 | 2022-05-20 | 太原理工大学 | 一种体外预应力加固混凝土梁疲劳试验装置及方法 |
CN115573376B (zh) * | 2022-08-12 | 2024-05-24 | 中国电力工程顾问集团西南电力设计院有限公司 | 一种圆形输电杆塔基础开裂的治理方法 |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202152463U (zh) * | 2011-07-03 | 2012-02-29 | 江苏金海风电科技有限公司 | 基础承压梁板式风力发电塔基础 |
US8443557B2 (en) * | 2011-09-16 | 2013-05-21 | General Electric Company | Tower base section of a wind turbine, a wind turbine and a system for mounting a tower |
US8720139B2 (en) * | 2012-03-30 | 2014-05-13 | Allan P. Henderson | Cementitious foundation cap with post-tensioned helical anchors |
EP2738322B1 (en) * | 2012-11-29 | 2016-01-20 | Siemens Aktiengesellschaft | Tower structure |
CN203583511U (zh) * | 2013-12-04 | 2014-05-07 | 湘电风能有限公司 | 一种基础环防松固定装置 |
CN204728356U (zh) * | 2015-04-17 | 2015-10-28 | 同济大学建筑设计研究院(集团)有限公司 | 风力发电塔基础环基础的加固系统 |
-
2015
- 2015-04-17 CN CN201510183824.1A patent/CN104790424B/zh active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2019093514A1 (en) * | 2017-11-13 | 2019-05-16 | Tokyo Institute Of Technology | Joining structure for a steel member having an end part embedded in a concrete member |
Also Published As
Publication number | Publication date |
---|---|
CN104790424A (zh) | 2015-07-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104790424B (zh) | 风力发电塔基础环基础的加固系统及其加固方法 | |
KR102055436B1 (ko) | 조립식 강합성 구조 교각 기둥 부재 | |
CN101298770B (zh) | 一种扩底预应力锥形管桩及其施工方法 | |
CN104153287B (zh) | 具有自复位能力的节段拼装混凝土框架桥墩系统及方法 | |
CN107165272A (zh) | 预应力装配式混凝土框架节点连接结构及其施工方法 | |
WO2019149270A1 (zh) | 一种普通钢筋与精轧螺纹钢筋混合配筋的拼装墩 | |
CN107905092A (zh) | 一种预制装配式桥墩及其拼装施工方法 | |
CN207194146U (zh) | 预应力装配式混凝土框架节点连接结构 | |
CN106758786A (zh) | 一种预制装配式中空夹层钢管混凝土格构式桥墩 | |
CN203222809U (zh) | 一种输电线路杆塔预应力混凝土管桩基础 | |
CN103015414A (zh) | 一种预制混凝土后注浆桩及注浆工艺 | |
CN208533868U (zh) | 一种新型的配筋空心钢管高强混凝土柱 | |
CN107338864A (zh) | 一种预制钢筋砼框架结构节点 | |
CN102345292B (zh) | 一种带有扩大头的复合预应力抗拔桩 | |
CN109578011B (zh) | 一种市政隧道内的支护结构及其施工方法 | |
CN105970803A (zh) | 装配式桥墩的抗剪耗能装置及施工方法 | |
CN205742249U (zh) | 一种预应力混凝土封底型承台模板 | |
CN208717720U (zh) | 一种采用超韧性纤维混凝土的桥梁下部结构 | |
CN104652430A (zh) | 复合配筋部分预应力混凝土实心方桩及其制作方法 | |
CN110424548A (zh) | 一种钢管混凝土柱-无梁楼盖连接节点及其施工方法 | |
CN203403402U (zh) | 立柱桩 | |
CN109208463A (zh) | 底部节段采用构件组合形式的预制节段拼装桥墩 | |
CN204728356U (zh) | 风力发电塔基础环基础的加固系统 | |
CN202194130U (zh) | 一种带有扩大头的复合预应力抗拔桩 | |
CN104631850A (zh) | 预压应力钢护筒并植筋扩大断面的混凝土柱加固方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
EXSB | Decision made by sipo to initiate substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |