Nothing Special   »   [go: up one dir, main page]

CN104746432B - The feasible bridge guidance tape in plate-beam transports installs car - Google Patents

The feasible bridge guidance tape in plate-beam transports installs car Download PDF

Info

Publication number
CN104746432B
CN104746432B CN201310754036.4A CN201310754036A CN104746432B CN 104746432 B CN104746432 B CN 104746432B CN 201310754036 A CN201310754036 A CN 201310754036A CN 104746432 B CN104746432 B CN 104746432B
Authority
CN
China
Prior art keywords
guidance tape
bridge guidance
installing rack
bridge
assembly
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310754036.4A
Other languages
Chinese (zh)
Other versions
CN104746432A (en
Inventor
王中文
周志祥
高燕梅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Jiaotong University
Guangdong Changda Highway Engineering Co Ltd
Original Assignee
Chongqing Jiaotong University
Guangdong Changda Highway Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Jiaotong University, Guangdong Changda Highway Engineering Co Ltd filed Critical Chongqing Jiaotong University
Priority to CN201310754036.4A priority Critical patent/CN104746432B/en
Publication of CN104746432A publication Critical patent/CN104746432A/en
Application granted granted Critical
Publication of CN104746432B publication Critical patent/CN104746432B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a kind of feasible bridge guidance tape in plate-girder to transport and install car, the feasible bridge guidance tape in plate-girder transports installs car, including mounting assembly be equipped with mounting assembly and can be along laying bridge guidance tape and truss winds up the walking assembly of longitudinally walking;Walking assembly not only can be walked on Steel Truss Beam, the cross spacing assembly of axially extended section of setting of front axle and hind axle can ensure that road wheel does not occur lateral run-out along girder truss longitudinal driving, cross spacing assembly can vertically overturn to be lifted to the most flat, make mounting transport vehicle can walk bridge guidance tape from Steel Truss Beam, obstruction will not be formed, bridge guidance tape to be laid can be carried on bridge truss and the bridge guidance tape that lays, all free walker can walk to arrive the designated mounting position of bridge guidance tape so that car is installed in transport, it is not required to outside pontic separately set bridge guidance tape spanning equipment, greatly reduce erection cost.

Description

The feasible bridge guidance tape in plate-beam transports installs car
Technical field
The present invention relates to science of bridge building field, transport particularly to a kind of feasible bridge guidance tape in plate-beam and car is installed.
Background technology
In bridges in highway engineering, due to easy to use, precoated plate has obtained widely as bridge guidance tape Application.In prior art, bridge prefabrication method of plate installation has self-propelled gantry to manage to carry out to install in place, i.e. Precoated plate is lifted into installation site by direct crane, and the method needs large-scale hoisting transportation equipment and construction field , during lifting in the crane arm radius of clean-up and working height range, must not there be transmission line of electricity and other obstacle in ground, Should not use under conditions of by space and plane size limitation, it addition, because of in view of generally there being water under bridge, Hoist engine can be used to coordinate chain guides to manage, set up falsework at pontic two ends, longitudinally lay outside pontic Two-way track, bridge one end hoist engine is fixed on end of the bridge, and other end hoist engine is separately fixed on each pier and can move Dynamic, longitudinally moved beam by hoist engine, and take chain block to move beam with steel pipe transverse, precoated plate is installed successively, The method operation complexity, needs to take a substantial amount of time and manpower and it needs to expend substantial amounts of fund, and lifting During the security and stability in post not enough.Further, for ensureing that bridge entirety stress is put down when bridge prefabrication plate is installed Weighing apparatus needs in the middle of bridge the symmetrical laying successively to two ends, and for this requirement, it is multiple that above-mentioned two methods all exist operation Miscellaneous, the problem of inconvenience movement, and also above-mentioned two methods are required to spanning equipment outside pontic, substantially increase Set up cost.
Therefore, for laying bridge guidance tape on built steel truss, one is needed at girder truss and to lay bridge road The most transitable transport installation equipment on plate, has and is easy to move, convenient use, and the feature of simple in construction can Bearing bridge guidance tape is walked on bridge truss and the bridge guidance tape that lays, and can be convenient and swift safe to bridge road Plate is installed, and greatly reduces the consuming of manpower, time and fund.
Summary of the invention
In view of this, the present invention provides a kind of feasible bridge guidance tape in plate-beam to transport and installs car, has and is easy to move Dynamic, convenient use, the feature of simple in construction, can bearing bridge guidance tape on bridge truss and the bridge guidance tape that lays Walking, and can convenient and swift safe bridge guidance tape is installed, greatly reduce manpower, time and fund Expend.
The feasible bridge guidance tape in plate-beam of the present invention transports installs car, joins including mounting assembly with mounting assembly Close and arrange and can be along laying bridge guidance tape and truss winds up the walking assembly longitudinally walked;
Described mounting assembly includes installing rack, hanging beam and crane assembly, and described installing rack includes crossbeam and column, The column correspondence bridge truss of described installing rack arranges at least one, described hanging beam and the column one of described installing rack One is correspondingly arranged, and each described hanging beam is that cross is fixedly installed and to install with the column of corresponding described installing rack The column of frame is that both sides, boundary form cantilever segment, every side cantilever segment is equipped with described crane assembly and is formed along truss vertical The transport of bridge guidance tape is advanced and installs by both direction forwards, backwards;
Described walking assembly includes the axial of front axle, hind axle and longeron, described front axle and described hind axle Two ends are provided with the axial two ends of road wheel, described front axle and described hind axle and all stretch out corresponding row and walk wheel shape Becoming axially extended section, the column one_to_one corresponding of longeron and installing rack is arranged, longeron two ends corresponding with front axle and after Wheel shaft is fixing to be connected, longeron in the way of can moving longitudinally relative to installing rack when bridge guidance tape is installed corresponding and The column bottom of described installing rack is equipped with;
Described walking assembly also includes the cross spacing assembly for preventing road wheel generation lateral run-out, described horizontal stroke In the way of flat act, described axially extended section it is arranged at so that level can be gone in vertical plane varus to limit assembly End.
Further, the column bottom of described installing rack is provided with adapter sleeve, and being provided with below described adapter sleeve can be by The jacking apparatus of installing rack jack-up, be placed in described longeron in adapter sleeve and can when installing rack jack-up along longitudinal direction to Bridge guidance tape is installed opposite side indentation formation and is stepped down.
Further, described cross spacing assembly includes hinged with axially extended section of end of front axle and hind axle Montant and be vertically installed on montant and along truss wind up lateral wall walking directive wheel, described axially extended section with Described montant hinged place is provided with the hydraulic means that montant can be put down act.
Further, described mounting assembly also includes brace, and described brace correspondence connects the column top of installing rack End and the end of both sides cantilever segment of hanging beam, the corresponding column with described installing rack of described brace and described hanging beam Form triangle cantilever design.
Further, described crane assembly includes mobile dolly, messenger line and and the load along hanging beam longitudinally walking Cable connects and bridge guidance tape is formed the lowering or hoisting gear of suspended fixing.
Further, also include auxiliary balance assembly, described auxiliary balance assembly include preventer guy and for purlin The fastener that frame connects, described preventer guy one end is mounted opposite frame opposite side by fastener and bridge guidance tape installation side On truss, chord node connects, and the other end is connected with the top cross-bar of installing rack.
Further, described installing rack is gantry frame structure, the column of installing rack be two be laterally set up in parallel and Above.
Further, also include that one is arranged on bridge truss and for making road wheel mistake between truss and bridge guidance tape Cross the change slope of two-way conversion of walking to lead the way parts.
Further, described longeron is horizontally arranged with the horizontal bearing beam for carrying bridge guidance tape to be installed.
Beneficial effects of the present invention: the feasible bridge guidance tape in plate-beam of the present invention transports installs car, and road wheel is not only Can walk on Steel Truss Beam, the cross spacing assembly of axially extended section of setting of front axle and hind axle can ensure that There is not lateral run-out along girder truss longitudinal driving in road wheel, cross spacing assembly can vertically overturn to laterally Flat act so that mounting transport vehicle can be walked bridge guidance tape from Steel Truss Beam, will not form obstruction, so that Car is installed in transport can carry bridge guidance tape to be laid in bridge truss and the two kinds of completely different roads of bridge guidance tape laid On the most feasible walk to arrive the designated mounting position of bridge guidance tape to be installed, be not required to outside pontic separately set bridge guidance tape pallet If equipment, greatly reduce pallet and be set as this;And hanging beam is equal for both sides, boundary with the column of installing rack with installing rack Forming cantilever segment, it is good that cantilever design has bearing capacity, the advantage that structural behaviour is stable, not only has preferable work Make stability, can facilitate the suspended fixing to bridge guidance tape, and both sides cantilever design make transport that car be installed can edge Bridge longitudinally former and later two directions transport is advanced and installs prefabricated bridge guidance tape, it is not necessary to transport is installed car and turned on truss To, can be also that bridge guidance tape installs the rational length travel amount of offer, make the simple and reasonable bridge guidance tape that meets pacify The requirement of dress position;
It addition, bridge guidance tape is placed in the mounting surface that longeron is formed in advance is transported to installation site, installing rack is at self It is pressed firmly against on longeron by adapter sleeve under the effect of gravity and realizes stabilized walking, when bridge guidance tape is installed, hang Bridge guidance tape is sling by car assembly, and now installing rack entirety jack-up can be made longeron be in unloaded state by jacking apparatus, Then longeron can along longitudinally moving in adapter sleeve, thus realize stepping down bridge guidance tape installation, can be obviously reduced The installing rack cantilever segment length needed is installed in the transport of bridge guidance tape, is greatly improved the installation safety of bridge guidance tape, makes whole Body structure is compacter;In a word, patent of the present invention can be installed in the convenient and swift safe transport that carries out bridge guidance tape, Greatly reduce the consuming of manpower, time and fund.
Accompanying drawing explanation
The invention will be further described with embodiment below in conjunction with the accompanying drawings.
Fig. 1 is that status architecture schematic diagram when car walks on Steel Truss Beam is installed in the transport of the present invention;
Fig. 2 is that Fig. 1 right side regards generalized section;
Fig. 3 is the status architecture schematic diagram that transport installs when car walks in the bridge guidance tape laid;
Fig. 4 is that Fig. 3 right side regards generalized section;
Fig. 5 is that car status architecture schematic diagram when bridge guidance tape is installed is installed in the transport of the present invention;
Fig. 6 is that Fig. 5 right side regards generalized section.
Detailed description of the invention
Fig. 1 is that status architecture schematic diagram when car walks on Steel Truss Beam is installed in the transport of the present invention, and Fig. 2 is figure 1 is right regarding generalized section, and Fig. 3 is that the status architecture that transport is installed when car walks in the bridge guidance tape laid is illustrated Figure, Fig. 4 is that Fig. 3 right side regards generalized section, and Fig. 5 is that car shape when bridge guidance tape is installed is installed in the transport of the present invention State structural representation, Fig. 6 is that Fig. 5 right side regards generalized section: the present embodiment feasible in the bridge guidance tape of plate-beam Car is installed in transport, including mounting assembly be equipped with mounting assembly and can be along laying bridge guidance tape 1 and truss The 2 walking assemblies winding up longitudinally walking;
Described mounting assembly includes installing rack 3, hanging beam (for hanging beam 1 and hanging beam two 4a in figure) and crane group Part, described installing rack includes crossbeam 3c and column (for column one 3a and column two 3b in figure), described installation The column correspondence bridge truss 2 of frame 3 arranges at least one, the column of described hanging beam and described installing rack one a pair Should arrange, i.e. according to practical situation, bridge has several groups of steel truss, and column just can be arranged and steel truss number phase one The number caused, column is correspondingly arranged the number consistent with steel truss equally, and each described hanging beam is (for hanging in figure Beam 1 and hanging beam two 4a) the corresponding column (being column one 3a and column two 3b in figure) with described installing rack It is fixedly installed in cross and forms cantilever segment with the column of installing rack for both sides, boundary, every side cantilever segment is equipped with Described crane assembly is formed to be advanced to the transport of bridge guidance tape along truss longitudinally former and later two directions and installs;
Described walking assembly includes front axle 5, hind axle 6 and longeron (for longeron 1 and longeron two 7a in figure), The axial two ends of described front axle 5 and described hind axle 6 be provided with road wheel (in figure for road wheel 1, Road wheel two 8a and road wheel three 8b), correspondence is all stretched out at the axial two ends of described front axle and described hind axle Road wheel forms axially extended section 9, longeron (being longeron 1 and longeron two 7a in figure) and the column of installing rack One_to_one corresponding is arranged, longeron (be longeron 1 and longeron two 7a in figure) two ends are corresponding and front axle 5 and after Wheel shaft 6 is fixing to be connected, and two longerons are in the way of can moving longitudinally relative to installing rack when bridge guidance tape is installed pair Should be equipped with the column bottom of described installing rack;Road wheel correspondence front axle and the axial two ends of hind axle respectively set Put one;
Described walking assembly also includes the cross spacing assembly for preventing road wheel generation lateral run-out, described horizontal stroke It is arranged to limit assembly in the way of flat act and described axially stretches so that transverse horizontal can be gone in vertical plane varus The section of going out end;
As depicted in figs. 1 and 2, the hanging beam inner sleeve of mounting assembly is fixed on the installing rack column formation cross of correspondence Shape structure, and with installing rack column as boundary, longitudinal both sides of hanging beam are all formed with the column of corresponding installing rack Cantilever design.
In the present embodiment, the column bottom of described installing rack is provided with adapter sleeve (for adapter sleeve 1 He in figure Adapter sleeve two 10a), being provided with below described adapter sleeve can be described vertical by the jacking apparatus 11 of installing rack jack-up It is placed in beam in adapter sleeve and can be when installing rack jack-up along longitudinally installing opposite side indentation formation to bridge guidance tape Step down;As it is shown on figure 3, bridge guidance tape is placed in the mounting surface that two longerons are formed in advance is transported to installation site, peace Shelve to be pressed firmly against on longeron by adapter sleeve under the effect of self gravitation and realize stabilized walking, such as Fig. 1 and Shown in Fig. 2, when bridge guidance tape is installed, bridge guidance tape is sling by crane assembly, and now jacking apparatus can be by installing rack Overall jack-up, longeron along longitudinally moving in adapter sleeve, thus realize bridge guidance tape is installed spacing, can reduce Bridge guidance tape, along the length travel amount of hanging beam, reduces and causes the stress of single unit system not because bridge guidance tape length travel is excessive Surely, it is greatly improved the installation safety of bridge guidance tape, and makes overall structure compacter at longitudinal direction, improve Stability;It addition, jacking apparatus is hydraulic pressure or mechanical jack in the present embodiment, or it is hydraulic cylinder, As long as can realize installing rack top role.
As in figure 2 it is shown, in the present embodiment, described cross spacing assembly includes and front axle 5 and hind axle 6 Montant 12 that axially extended section of 9 end are hinged and be vertically installed on montant and wind up lateral wall walking along truss Directive wheel 13, described axially extended section is provided with the hydraulic means that montant can be put down act with described montant hinged place 14;Simple in construction, it is easy to accomplish, as depicted in figs. 1 and 2, wherein, corresponding row travelling wheel respectively arranges a horizontal stroke To limit assembly, when road wheel travels at Steel Truss Beam end face, front axle and axially extended section of end of hind axle Portion is hingedly connected with montant, and montant lower end sets the directive wheel of level, to guarantee that road wheel is along Steel Truss Beam lengthwise rows Sailing and lateral run-out does not occur, when travelling on the bridge guidance tape of installation, road wheel is up at floorings Sailing, the directive wheel that montant that axially extended section of end of front axle and hind axle is hinged and montant are arranged passes through liquid Press-fit horizontalization act disengaging bridge guidance tape inoperative, so that it is guaranteed that the traveling from Steel Truss Beam to bridge guidance tape 1, its In, hydraulic means can be hydraulic jack, as shown in Figure 3 and Figure 4, when to walk on the bridge guidance tape laid Time, montant is overturn flat act along pin joint in vertical plane by hydraulic jack makes it horizontal, it addition, road wheel can To be driven by manpower, it is possible to arrange automotive drive system and walk, automotive drive system can use existing Electric four-wheel vehicle control model is configured, and belongs to prior art, does not repeats them here.
In the present embodiment, described mounting assembly also includes brace 15, and described brace 15 corresponding connection installs The column top of frame and the end of the both sides cantilever segment of hanging beam, the corresponding column with described installing rack of described brace Triangle cantilever design is formed with hanging beam;The both sides cantilever segment of the corresponding each hanging beam of brace respectively arranges one, to increase Add the stability of cantilever segment and support suspention intensity.
In the present embodiment, described crane assembly includes along the hanging beam longitudinally mobile dolly 18 of walking, messenger line 19 and be connected with messenger line 19 and to bridge guidance tape formed suspended fixing lowering or hoisting gear 20;Mobile dolly includes Train, wheel shaft and along the longitudinally disposed wheel bar of hanging beam, for prior art construction, do not repeat them here, lifting dress It is set to hydraulic cylinder or electrical motor driven messenger line moves up and down and can be promoted by bridge guidance tape and put down, actual application In, vibrated drive equipment can be set the back and forth movement of mobile dolly is driven, mobile dolly cross-arm is arranged on On hanging beam, manually or motorized motions, all can realize goal of the invention, not repeat them here.
In the present embodiment, also include that auxiliary balance assembly, described auxiliary balance assembly include preventer guy 16 He For the fastener 17 being connected with truss, described preventer guy 16 one end is by fastener 17 and bridge guidance tape installation side Being mounted opposite chord node on the truss of frame opposite side to connect, the other end is connected with top cross-bar 3c of installing rack; As shown in Figure 5 and Figure 6, it is mounted opposite frame opposite side to refer to, with the column of installing rack as boundary, install with bridge guidance tape The opposite side that position is corresponding, the triangle cantilever design of installing rack mounting bridge guidance tape side rises suspension bridge guidance tape formed can The antidumping balanced structure system leaned on, auxiliary balance assembly correspondence installing rack column is also provided with two groups, and transport is installed Car is after being carried to designated mounting position by bridge guidance tape, and fastener is only just fixing with truss when suspending bridge guidance tape in midair to be connected Connect, apply oblique pulling force by preventer guy, prevent because bridge guidance tape length travel causes installing rack to tilt, significantly Improve operational security.
In the present embodiment, described installing rack is gantry frame structure, and the column of installing rack is two be laterally set up in parallel Individual and more than, figure is column one 3a and column two 3b;Gantry frame structure stabilized structure, it is easy to install.
In the present embodiment, also include one be arranged on bridge truss and for make road wheel truss and bridge guidance tape it Between the walk change slope of two-way conversion of transition lead the way parts;Steel Truss Beam is installed and becomes slope parts 23 of leading the way and formed From Steel Truss Beam to the transition of bridge guidance tape, in the present embodiment, become slope and lead the way parts into triangular steel plate, it is ensured that OK Travelling wheel freely walking between steel truss and bridge guidance tape.
In the present embodiment, described longeron is horizontally arranged with the horizontal bearing beam for carrying bridge guidance tape 22 to be installed 21;Horizontal bearing beam is two be longitudinally set up in parallel, and transversely cross-arm is arranged on longeron, improves the delivery of bridge guidance tape Stability.
Finally illustrate, above example only in order to technical scheme to be described and unrestricted, although With reference to preferred embodiment, the present invention is described in detail, it will be understood by those within the art that, Technical scheme can be modified or equivalent, without deviating from technical solution of the present invention Objective and scope, it all should be contained in the middle of scope of the presently claimed invention.

Claims (9)

1. a feasible bridge guidance tape in plate-beam transports and installs car, it is characterised in that: include mounting assembly and with Mounting assembly is equipped with and can be along laying bridge guidance tape and truss winds up the walking assembly of longitudinally walking;
Described mounting assembly includes installing rack, hanging beam and crane assembly, and described installing rack includes crossbeam and column, The column correspondence bridge truss of described installing rack arranges at least one, described hanging beam and the column one of described installing rack One is correspondingly arranged, and each described hanging beam is that cross is fixedly installed and to install with the column of corresponding described installing rack The column of frame is that both sides, boundary form cantilever segment, every side cantilever segment is equipped with described crane assembly and is formed along truss vertical The transport of bridge guidance tape is advanced and installs by both direction forwards, backwards;
Described walking assembly includes the axial of front axle, hind axle and longeron, described front axle and described hind axle Two ends are provided with the axial two ends of road wheel, described front axle and described hind axle and all stretch out corresponding row and walk wheel shape Becoming axially extended section, the column one_to_one corresponding of longeron and installing rack is arranged, longeron two ends corresponding with front axle and after Wheel shaft is fixing to be connected, longeron in the way of can moving longitudinally relative to installing rack when bridge guidance tape is installed corresponding and The column bottom of described installing rack is equipped with;
Described walking assembly also includes the cross spacing assembly for preventing road wheel generation lateral run-out, described horizontal stroke In the way of flat act, described axially extended section it is arranged at so that level can be gone in vertical plane varus to limit assembly End.
The feasible bridge guidance tape in plate-beam the most according to claim 1 transports installs car, it is characterised in that: The column bottom of described installing rack is provided with adapter sleeve, and being provided with below described adapter sleeve can be by installing rack jack-up Jacking apparatus, is placed in described longeron in adapter sleeve and can be when installing rack is by jack-up along longitudinally install to bridge guidance tape Opposite side indentation is formed and steps down.
The feasible bridge guidance tape in plate-beam the most according to claim 2 transports installs car, it is characterised in that: Described cross spacing assembly includes the montant hinged with axially extended section of end of front axle and hind axle and along perpendicular To being installed on montant the directive wheel of lateral wall walking of winding up along truss, described axially extended section is cut with scissors with described montant The place of connecing is provided with the hydraulic means that montant can be put down act.
The feasible bridge guidance tape in plate-beam the most according to claim 3 transports installs car, it is characterised in that: Described mounting assembly also includes brace, and described brace correspondence connects the column top and the two of hanging beam of installing rack The end of side cantilever segment, the corresponding column with described installing rack of described brace and described hanging beam form triangle cantilever Structure.
The feasible bridge guidance tape in plate-beam the most according to claim 4 transports installs car, it is characterised in that: Described crane assembly includes mobile dolly, the messenger line longitudinally walked along hanging beam and is connected with messenger line and right Bridge guidance tape forms the lowering or hoisting gear of suspended fixing.
The feasible bridge guidance tape in plate-beam the most according to claim 5 transports installs car, it is characterised in that: Also include that auxiliary balance assembly, described auxiliary balance assembly include preventer guy and for buckleing of being connected with truss Part, described preventer guy one end is passed through fastener and is positioned at the installing rack purlin relative to the opposite side of bridge guidance tape installation site On frame, chord node connects, and the other end is connected with the top cross-bar of installing rack.
The feasible bridge guidance tape in plate-beam the most according to claim 6 transports installs car, it is characterised in that: Described installing rack is gantry frame structure, the column of installing rack be two be laterally set up in parallel and more than.
The feasible bridge guidance tape in plate-beam the most according to claim 7 transports installs car, it is characterised in that: Also include that one is arranged on bridge truss and for making road wheel transition walking between truss and bridge guidance tape two-way Lead the way parts in the change slope converted.
The feasible bridge guidance tape in plate-beam the most according to claim 8 transports installs car, it is characterised in that: The horizontal bearing beam for carrying bridge guidance tape to be installed it is horizontally arranged with on described longeron.
CN201310754036.4A 2013-12-31 2013-12-31 The feasible bridge guidance tape in plate-beam transports installs car Active CN104746432B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310754036.4A CN104746432B (en) 2013-12-31 2013-12-31 The feasible bridge guidance tape in plate-beam transports installs car

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310754036.4A CN104746432B (en) 2013-12-31 2013-12-31 The feasible bridge guidance tape in plate-beam transports installs car

Publications (2)

Publication Number Publication Date
CN104746432A CN104746432A (en) 2015-07-01
CN104746432B true CN104746432B (en) 2016-08-31

Family

ID=53586635

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310754036.4A Active CN104746432B (en) 2013-12-31 2013-12-31 The feasible bridge guidance tape in plate-beam transports installs car

Country Status (1)

Country Link
CN (1) CN104746432B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107988909B (en) * 2017-07-28 2019-12-10 中铁二十四局集团有限公司 Railway is just roof beam rapid transit erects and uses trailer
CN109137759B (en) * 2018-09-29 2023-12-19 中铁第四勘察设计院集团有限公司 Precast cantilever assembling method and system for prestressed concrete box girder segment
CN110158485A (en) * 2019-07-03 2019-08-23 桂林电子科技大学 A kind of easy prefabricated bridge lifting trolley and its application method
CN112081012B (en) * 2020-09-04 2022-02-22 中交第四航务工程局有限公司 Jacking and transporting method for large prestressed concrete precast box girder

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1270258A (en) * 2000-05-02 2000-10-18 山东省筑港总公司 Horizontally redirectional transportation method for bridge
JP3340681B2 (en) * 1998-10-02 2002-11-05 株式会社ピー・エス Construction method of overhanging girder bridge using corrugated steel web
JP2004225275A (en) * 2003-01-20 2004-08-12 Taisei Corp Erection apparatus for corrugated steel plate web box girder bridge, and construction method for corrugated steel plate web box girder bridge
CN201250385Y (en) * 2008-09-10 2009-06-03 中铁八局集团第一工程有限公司 Rear support long cantilevered traveling carriage system for cable-stayed bridge cantilever casting
CN102174795A (en) * 2011-03-28 2011-09-07 中铁一局集团有限公司 Reversible suspended basket wheel type travelling system and method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3340681B2 (en) * 1998-10-02 2002-11-05 株式会社ピー・エス Construction method of overhanging girder bridge using corrugated steel web
CN1270258A (en) * 2000-05-02 2000-10-18 山东省筑港总公司 Horizontally redirectional transportation method for bridge
JP2004225275A (en) * 2003-01-20 2004-08-12 Taisei Corp Erection apparatus for corrugated steel plate web box girder bridge, and construction method for corrugated steel plate web box girder bridge
CN201250385Y (en) * 2008-09-10 2009-06-03 中铁八局集团第一工程有限公司 Rear support long cantilevered traveling carriage system for cable-stayed bridge cantilever casting
CN102174795A (en) * 2011-03-28 2011-09-07 中铁一局集团有限公司 Reversible suspended basket wheel type travelling system and method

Also Published As

Publication number Publication date
CN104746432A (en) 2015-07-01

Similar Documents

Publication Publication Date Title
CN201077721Y (en) Gantry crane with falling girder
CN104805773B (en) The Segmental assembling bridge-erecting machine of little curved bridge of constructing
CN104195952A (en) Steel box girder erection method applied to steel and concrete hybrid girder cable-stayed bridge
CN105648916B (en) A kind of erection method of Bridge Erector and the Bridge Erector
CN101736703B (en) 3000t special bridge girder erection machine for integrally erecting 120m-span double-layer four-line steel beam bridge for highway and railway
CN202899040U (en) Crossing tunnel box girder transporting and mounting all-in-one machine
WO2014015757A1 (en) Bridge maintenance vehicle with hinge-connected type hanging bracket and capable of avoiding bridge-side obstacles
CN103726421B (en) Height and span adjustable track paver for metro construction
CN102367651A (en) U-shaped concrete beam bridge girder erection machine
CN104746432B (en) The feasible bridge guidance tape in plate-beam transports installs car
CN205713147U (en) A kind of quick positioning apparatus of precast floor slab
CN103072900B (en) Loading frame dual-purpose vehicle under coal mine
CN108625270A (en) Nose girder gantry crane installs bridge prefabrication box girder construction method
CN114808747A (en) Multifunctional bridge girder erection machine and bridge girder erection construction method
CN203684019U (en) Height and span adjustable track laying machine for subway construction
CN106480825A (en) Railway nonstandard Beams Erection Construction engineering method
CN102635066A (en) Hanger articulated bridge inspection vehicle
CN205932963U (en) Many landing legs tire formula tracklaying crane
CN202543799U (en) Hanging bracket hinging type bridge maintenance vehicle
CN108130864B (en) Integrally-assembled bridge whole-span beam transportation and erection equipment
CN102225580B (en) Method for longitudinally moving box girder internal mold
CN210366808U (en) Lifting and dismantling device for rail walking
CN205382425U (en) Railway T type bridge adds builds sound barrier beam mold plate girder unwheeling
CN112030777A (en) Descending movable formwork support bracket crossing type transfer construction method
CN207293976U (en) A kind of cantilever crane set up for bridge subsection transport

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant