Nothing Special   »   [go: up one dir, main page]

CN104631418A - Method for checking underground pipeline through simple manpower device in urban geology exploration - Google Patents

Method for checking underground pipeline through simple manpower device in urban geology exploration Download PDF

Info

Publication number
CN104631418A
CN104631418A CN201310552409.XA CN201310552409A CN104631418A CN 104631418 A CN104631418 A CN 104631418A CN 201310552409 A CN201310552409 A CN 201310552409A CN 104631418 A CN104631418 A CN 104631418A
Authority
CN
China
Prior art keywords
different
pipeline
underground
relation
simple manpower
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310552409.XA
Other languages
Chinese (zh)
Inventor
刘大金
王勋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dalian Academy Of Reconnaissance And Mapping Co Ltd
Original Assignee
Dalian Academy Of Reconnaissance And Mapping Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dalian Academy Of Reconnaissance And Mapping Co Ltd filed Critical Dalian Academy Of Reconnaissance And Mapping Co Ltd
Priority to CN201310552409.XA priority Critical patent/CN104631418A/en
Publication of CN104631418A publication Critical patent/CN104631418A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D1/00Investigation of foundation soil in situ
    • E02D1/02Investigation of foundation soil in situ before construction work

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Analytical Chemistry (AREA)
  • Soil Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Geophysics And Detection Of Objects (AREA)

Abstract

The invention discloses a method for checking an underground pipeline through a simple manpower device in urban geology exploration. The method is characterized by including the following steps of collecting data, wherein a simple manpower underground rock sampling device is manufactured according to the technical thought that a traditional Luoyang shovel is used in accordance with reconnaissance experience of multiple years, different shovel heads are designed according to different geological conditions, upper hand rods can be connected through screw threads so that the rod length can be freely increased, and whether the hole drilling position is safe or not is judged according to the sampled soil sample. Thus, the underground pipeline can be rapidly found before the drilling work is conducted, the method is economical and practical, operation is easy and convenient, safety accidents are avoided, and the method is the starting point of the research on the simple manpower device.

Description

Simple manpower equipment investigates the method for underground utilities in urban geology prospecting
Technical field
The present invention relates to a kind of method that Simple manpower equipment investigates underground utilities in urban geology prospecting.
Background technology
City Buried Pipeline contains the multiple classifications such as draining, feedwater, heating power, combustion gas, electric power, telecommunications, industrial pipeline, complicated intersection, intensive intertexture, is urban modernization development and the basic substance of depending on for existence and lifeline.In recent years due to subway, light rail and city old building remodeling, the construction of road both sides is frequent, underground pipelines safety threateningly.Especially ground survey probing work, owing to being difficult to find out underground utilities position, therefore blindly ground survey construction, the safety of serious threat underground utilities.Repeatedly there is the events such as probing brill quick-fried tap water, coal gas, electric wire, telecommunication optical fiber in Daliang City in recent years, causes a lot of harmful effect, cause many economic losses to society.At present, the method investigating underground utilities in geological mapping has two kinds, and technological deficiency is as follows:
(1) adopt geophysical prospecting method to find out, utilize underground utilities medium and the discrepant principle of periphery soil layer, by sound wave or electromagnetic field investigation.This method defect has: when 1, pipeline is complicated, signal disturbs mutually, and error is larger.2, when pipeline buried depth is larger, accuracy of instrument is limited, and error is larger.3, pipeline material is complicated, and instrument is limited, and pipe of cement and plastic lined piping and the periphery soil body roughly the same, are difficult to find out.
(2) hand excavation, namely at bore position excavation test pit, discloses whole pipeline, intuitively hides.This method defect has: 1, test pit excavation, causes the extensive damage on ground, road surface and meadow, affects surrounding enviroment.2, test pit excavation piles up a large amount of soil body, causes environment pollution, and cannot backfill completely, form unnecessary spoir, casting contaminated environment, increases job costs.3, artificial test pit excavation, the degree of depth is restricted, and generally at about 2 meters, meet underground water and be also difficult to driving, compliance is low, dangerous hidden danger.4, test pit excavation, after soil body backfill, compactness is difficult to reach original condition, easily causes surface collapse.5, after test pit excavation, backfill not in time, easily cause personnel and machinery to fall, more dangerous.6, financial cost and time cost are comparatively large, uneconomical applicable.
Summary of the invention
The present invention is directed to the proposition of above problem, and develop a kind of method that Simple manpower equipment investigates underground utilities in urban geology prospecting.The technical solution used in the present invention is as follows:
Simple manpower equipment investigates a method for underground utilities in urban geology prospecting, it is characterized in that comprising the steps:
(1) data collection, investigates Dalian Area underground utilities and buries feature underground, and underground utilities kind is different, and the degree of depth buried underground is different, and method for embedding is different, and pipeline caliber is different, different from road and neighboring buildings object location rule etc.;
(2) according to reconnoitring experience for many years, Dalian zones of different is summed up, the correlation of underground utilities and the geology soil body, as pipeline and underground water relation of plane, the relation of pipeline and backfill, the relation of pipeline and natural undisturbed soil, the relation of pipeline and hills area rock mass, pipeline and periphery;
(3) technical thought of traditional luoyang spade is utilized, manufacture a kind of Simple manpower underground ground sampler, design different shovel heads according to different geological conditions, top hand lever can connect that arbitrarily to increase bar long by screw thread, according to the soil sample judgement bore position taked whether safety.
Compared with the existing technology of the present invention is a little apparent, specific as follows: (1) manufactures Simple manpower flat chisel shape drawing out soil equipment, and the material of various model and shape can adapt to different stratum, Dalian, adapt to different depth requirements.(2) there is probing workman starting to drill front operation, save time and the cost of other detection methods.(3) change Thoughts, traditional thinking, for finding out the whole pipeline of borehole circumference, then arranges that boring is in the position of safety.As long as current thinking determines do not have pipeline for drafting below boring, probing work can be implemented.Thinking decreases a large amount of meaningless workloads after changing.
Detailed description of the invention
Simple manpower equipment investigates a method for underground utilities in urban geology prospecting, it is characterized in that comprising the steps:
(1) data collection, investigates Dalian Area underground utilities and buries feature underground, and underground utilities kind is different, and the degree of depth buried underground is different, and method for embedding is different, and pipeline caliber is different, different from road and neighboring buildings object location rule etc.;
(2) according to reconnoitring experience for many years, Dalian zones of different is summed up, the correlation of underground utilities and the geology soil body, as pipeline and underground water relation of plane, the relation of pipeline and backfill, the relation of pipeline and natural undisturbed soil, the relation of pipeline and hills area rock mass, pipeline and periphery;
(3) technical thought of traditional luoyang spade is utilized, manufacture a kind of Simple manpower underground ground sampler, design different shovel heads according to different geological conditions, top hand lever can connect that arbitrarily to increase bar long by screw thread, according to the soil sample judgement bore position taked whether safety.Said method can solve (1) urban road periphery, verifies the whether buried underground utilities of prospecting drilling position.(2) drill the duration usually in 1-2 days, solve detection problem fast and effectively.(3) conventional geophysical prospecting equipment detection, accuracy is poor, solves safety problem.(4) conventional manual's test pit, need ground test pit excavation early stage, cause Heavy environmental pollution, affect traffic, personnel have hidden danger of the test pit that drops etc., solve excavation test pit problem.
The above; be only the present invention's preferably detailed description of the invention; but protection scope of the present invention is not limited thereto; anyly be familiar with those skilled in the art in the technical scope that the present invention discloses; be equal to according to technical scheme of the present invention and inventive concept thereof and replace or change, all should be encompassed within protection scope of the present invention.

Claims (1)

1. Simple manpower equipment investigates a method for underground utilities in urban geology prospecting, it is characterized in that comprising the steps:
(1) data collection, investigates Dalian Area underground utilities and buries feature underground, and underground utilities kind is different, and the degree of depth buried underground is different, and method for embedding is different, and pipeline caliber is different, different from road and neighboring buildings object location rule etc.;
(2) according to reconnoitring experience for many years, Dalian zones of different is summed up, the correlation of underground utilities and the geology soil body, as pipeline and underground water relation of plane, the relation of pipeline and backfill, the relation of pipeline and natural undisturbed soil, the relation of pipeline and hills area rock mass, pipeline and periphery;
(3) technical thought of traditional luoyang spade is utilized, manufacture a kind of Simple manpower underground ground sampler, design different shovel heads according to different geological conditions, top hand lever can connect that arbitrarily to increase bar long by screw thread, according to the soil sample judgement bore position taked whether safety.
CN201310552409.XA 2013-11-07 2013-11-07 Method for checking underground pipeline through simple manpower device in urban geology exploration Pending CN104631418A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310552409.XA CN104631418A (en) 2013-11-07 2013-11-07 Method for checking underground pipeline through simple manpower device in urban geology exploration

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310552409.XA CN104631418A (en) 2013-11-07 2013-11-07 Method for checking underground pipeline through simple manpower device in urban geology exploration

Publications (1)

Publication Number Publication Date
CN104631418A true CN104631418A (en) 2015-05-20

Family

ID=53210619

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310552409.XA Pending CN104631418A (en) 2013-11-07 2013-11-07 Method for checking underground pipeline through simple manpower device in urban geology exploration

Country Status (1)

Country Link
CN (1) CN104631418A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105700039A (en) * 2016-01-20 2016-06-22 广州市城市规划勘测设计研究院 Method for detecting underground pipe in urban road exploration construction
CN112411527A (en) * 2020-10-19 2021-02-26 南京格洛特环境工程股份有限公司 Blocking method for in-situ remediation of polluted land under complex working conditions
CN113482523A (en) * 2021-07-20 2021-10-08 西北综合勘察设计研究院 Composite hole probing method combining drilling, Luoyang shovel and drill rod probing
CN114923031A (en) * 2022-06-17 2022-08-19 中交第二航务工程局有限公司 Trenchless detection method for ultra-buried depth complex pipeline in pipe jacking construction

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105700039A (en) * 2016-01-20 2016-06-22 广州市城市规划勘测设计研究院 Method for detecting underground pipe in urban road exploration construction
CN112411527A (en) * 2020-10-19 2021-02-26 南京格洛特环境工程股份有限公司 Blocking method for in-situ remediation of polluted land under complex working conditions
CN113482523A (en) * 2021-07-20 2021-10-08 西北综合勘察设计研究院 Composite hole probing method combining drilling, Luoyang shovel and drill rod probing
CN114923031A (en) * 2022-06-17 2022-08-19 中交第二航务工程局有限公司 Trenchless detection method for ultra-buried depth complex pipeline in pipe jacking construction

Similar Documents

Publication Publication Date Title
Wang et al. Implementation of underground longhole directional drilling technology for greenhouse gas mitigation in Chinese coal mines
CN102322294B (en) Comprehensive geological prediction method for karst tunnel construction
CN105277993B (en) Method for prospecting gold mine in sea area
CN102221332A (en) Fiber grating multi-point sensing device for unconsolidated strata as well as monitoring system and method
CN105334548A (en) Geological forecasting method for tunnel construction in karst area
CN109736796B (en) Advanced detection mechanism for deepening blast hole and prediction method thereof
CN103471647B (en) A kind of shield tunnel remote automation monitoring method
CN101295026A (en) Levee intelligent detecting early-warning method based on wireless sensing net
CN102538741B (en) Determination method of deformation of soil body caused by pipe jacking construction by considering grouting pressure
CN113360592A (en) Method for pre-warning water inrush danger of coal seam roof in N00 construction method based on micro-seismic monitoring
CN105700039A (en) Method for detecting underground pipe in urban road exploration construction
CN104631418A (en) Method for checking underground pipeline through simple manpower device in urban geology exploration
Tan et al. In situ investigations of failure zone of floor strata in mining close distance coal seams
CN105527119A (en) A drilling method preventing secondary pollution for reconnaissance of a polluted site
CN115016030A (en) Evaluation of CO in stratum based on DAS system 2 Method for sealing leakage risk
CN208310757U (en) A kind of rich water weak soil, the artificial bore detecting device of thin silt ultra-deep pipeline
Worth et al. Aquistore: year one–injection, data, results
Barla Lessons learnt from the excavation of a large diameter TBM tunnel in complex hydrogeological conditions
Onoe et al. Groundwater recovery experiment using an underground gallery in fractured crystalline rock
Wang et al. Height measurement of the water-conducting fracture zone based on stress monitoring
CN109344445B (en) Calculation method for water seal safety interval of underground water seal stone cave oil depot extension
CN105300444A (en) Method of exploring morphological characteristics of gorge bank slope deep buried underground large karst cave
CN204356758U (en) Highway engineering construction soil sample layering sampling device
Zhang et al. Detection and evaluation of crack development near the fault zone under the influence of coal mining
Dong et al. Heterogeneous rock mass detection in the Goaf underlying the Yingbin substation

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20150520