- CN104512700B CN104512700B CN201310460445.3A CN201310460445A CN104512700B CN 104512700 B CN104512700 B CN 104512700B CN 201310460445 A CN201310460445 A CN 201310460445A CN 104512700 B CN104512700 B CN 104512700B
- Authority
- CN
- China
- Prior art keywords
- bogie
- conveyer
- composition
- chain
- welding assembly
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Control Of Conveyors (AREA)
- Automatic Assembly (AREA)
Abstract
Pipeline is overhauled the present invention relates to a kind of railway goods train bogie, a kind of railway goods train bogie maintenance pipeline is made up of bogie horizontal conveyer (1) to be repaired, decomposition upset inspection desk (2), detection assembly or fitting table (3), detection assembling bogie suspension conveyer (4), welding assembly platform (5), welding assembly bogie suspension conveyer (6), good bogie horizontal feed line machine (7), hydraulic station (8).The advantage of the present invention is mainly reflected in:Compact in design, floor space are small;Inspection platform can be flexibly set, service ability is substantially increased.
Description
Technical field
Pipeline is overhauled the present invention relates to a kind of railway goods train bogie, belongs to Railway Freight Car Repair technique and equipment technology
Field.
Background technology
At present in china railway roller bearing adapter stabilizer bar repair assembly line using three kinds of forms:One is that ground is ring-like, i.e., several
Multifunctional repairing dolly is operated on fixed endless track;Two be the linear pattern transmitted using carrier bar;Three be by chain band
The suspension type of dynamic bogie hoist is ring-like.These three bogie repair assembly line common ground are all to need each bogie to be repaired
The all process steps that must be set through streamline, this will certainly just cause the waste of repair time.With with " specialization, scale,
Modernization " is the Railway Freight Car Repair construction of base of developing direction, the existing bogie repair assembly line of three of the above form
Service ability far from disclosure satisfy that demand for development by facts have proved:One repair assembly line is far from being enough, at least
Two bogie repair assembly lines are set to meet, but two bogie streamlines can cause to overhaul area and the wave of equipment again
Take, it is necessary to which the repair method and mode of movement of existing bogie are innovated.
The content of the invention
Bogie service ability is improved it is an object of the invention to provide one kind, wanting for overhaul shop " large-scale production " is reached
Ask, while having the bogie repair method and pipeline that device layout is compact, floor space is small.For achieving the above object
It is achieved through the following technical solutions:Pipeline is overhauled the present invention relates to a kind of railway goods train bogie, pipeline is by be repaired
Bogie horizontal conveyer 1, decomposition upset inspection desk 2, detection assembly or fitting table 3, detection assemble bogie suspension conveyer 4, welded
Assembly or fitting table 5, welding assembly bogie suspension conveyer 6, good bogie horizontal feed line machine 7, hydraulic station 8 are constituted, its feature
It is:Bogie horizontal conveyer 1 to be repaired assembles bogie suspension conveyer 4 and welding assembly bogie suspension with detection respectively
Conveyer 6 is connected, and railway goods train bogie is transported on good bogie pipeline machine 7, and detection assembling bogie suspension is defeated
Machine 4 and the annular transfer passage of each self-forming of welding assembly bogie suspension conveyer 6 are sent, the setting quantity of repair line can basis
Bogie overhauls quantity to set;Described bogie horizontal conveyer 1 to be repaired is chain structure, by frames 11, is led
Draw chain 12, drive device 13, drive sprocket 14, driven sprocket 15 to constitute, bogie carrying platform 16, platform are installed on chain
Quantity quantity set can be overhauled by bogie;Described decomposition upset inspection desk 2 is turned over by the possessing of controlling of hydraulic jack 21
The frame 22 for turning 60 ° is constituted;Described detection assembly or fitting table 3 is 32 groups of the frame for possessing 60 ° of upset controlled by hydraulic jack 31
Into positioned at the front end of horizontal conveyer 1, the bottom initiating terminal of detection assembling bogie suspension conveyer 4;Described detection assembling
Bogie suspension conveyer 4 is by overhead track 42, haulage chain 42, balladeur train 43, suspender 44, change course device 45, drive device 46
Deng composition;Described welding assembly platform 5 is 52 groups of the frame for possessing 60 ° of upset controlled by hydraulic jack 51 and hydraulic jack 51
Into;Described welding assembly bogie suspension conveyer 6 is filled by overhead track 61, haulage chain 62, balladeur train 63, suspender 64, changed course
65, drive device 66 is put to constitute;Described good bogie horizontal feed line machine 7 is chain structure, by frames 71, is led
Draw and bogie carrying platform 76 is installed on the composition such as chain 72, drive device 73, drive sprocket 74, driven sprocket 75, chain, put down
The quantity of platform can overhaul quantity set by bogie.
The advantage of the present invention is mainly reflected in:
1st, compact in design, floor space are small;
The 2nd, inspection platform can be flexibly set, service ability is substantially increased.
Brief description of the drawings
Fig. 1 is a kind of railway goods train bogie maintenance pipeline schematic diagram:
1st, bogie horizontal conveyer to be repaired;11st, frames;12nd, conduction chain;13rd, drive device;14th, drive chain
Wheel;15th, driven sprocket;16th, bogie carrying platform;
2nd, upset inspection desk is decomposed;21st, hydraulic jack;22 frames;
3rd, assembly or fitting table is detected;31st, hydraulic jack;32nd, frame;
4th, detection assembling bogie suspension conveyer;41st, overhead track;42nd, haulage chain;43rd, balladeur train;44th, suspender;45、
Change course device;46th, drive device;
5th, welding assembly platform;51st, hydraulic jack;52nd, frame;
6th, welding assembly bogie suspension conveyer;61st, overhead track;62nd, haulage chain;63rd, balladeur train;64th, suspender;65、
Changed course dress;66th, drive device;
7th, good bogie horizontal feed line machine;71st, frames;72nd, conduction chain;73rd, drive device;74th, actively
Sprocket wheel;75th, driven sprocket;76th, bogie carrying platform;
8th, hydraulic station.
Embodiment explanation
Embodiment is told about with reference to Fig. 1:
The effect of the composition and each part of embodiment 1- kind railway goods train bogie repair methods and pipeline:Pipeline by
Bogie horizontal conveyer 1 to be repaired, decompose upset inspection desk 2, detection assembly or fitting table 3, detection assembling bogie suspension conveyer 4,
Welding assembly platform 5, welding assembly bogie suspension conveyer 6, good bogie horizontal feed line machine 7, hydraulic station 8 are constituted, institute
State a kind of railway goods train bogie maintenance pipeline be essentially characterized in that bogie horizontal conveyer 1 to be repaired respectively with detection
Assembling bogie suspension conveyer 4 is connected with welding assembly bogie suspension conveyer 6, railway goods train bogie is transported to good
On good bogie pipeline 7, detection assembling bogie suspension conveyer 4 and each idiomorphism of welding assembly bogie suspension conveyer 6
Transfer passage is circularized, the setting quantity of its each bar repair line can overhaul quantity to set according to bogie.Described is to be repaired
Bogie horizontal conveyer 1 is chain structure, by frames 11, haulage chain 12, drive device 13, drive sprocket 14, from
The grade of movable sprocket 15 is constituted, and is installed with bogie carrying platform 16 on chain, the quantity of platform can overhaul quantity set by bogie.
The frame 22 for possessing 60 ° of upset that described decomposition upset inspection desk 2 is controlled by hydraulic jack 21 is constituted.Described detection group
The frame 32 for possessing 60 ° of upset that dress platform 3 is controlled by hydraulic jack 31 is constituted, positioned at the front end of horizontal conveyer 1, detection group
Fill the bottom initiating terminal of bogie suspension conveyer 4.Described detection assembling bogie suspension conveyer 4 is by overhead track
41st, haulage chain 42, balladeur train 43, suspender 44, change course device 45, drive device 46 etc. are constituted.Described welding assembly platform 5 is by liquid
The frame 52 for possessing 60 ° of upset of the control of compressing cylinder 51 is constituted.Described welding assembly bogie suspension conveyer 6 is by hanger rail
Road 61, haulage chain 62, balladeur train 63, suspender 64, change course device 65, drive device 66 etc. are constituted.Described good bogie level
Conveyer 7 is chain structure, by frames 71, haulage chain 72, drive device 73, drive sprocket 74, driven sprocket 75 etc.
Bogie carrying platform 76 is installed on composition, chain, the quantity of platform can overhaul quantity set by bogie.
The maintenance craft of a kind of railway goods train bogie repair methods of embodiment 2-- and pipeline:Bogie to be repaired passes through
On bogie carrying platform 16 on overhead traveling crane or rocking arm handling to horizontal conveyer 1, reach and divide under the drive of drive device
Solution upset inspection desk 2, by overhaul the need for repair welding, change the bogie handling of accessory to welding assembly bogie suspension
On conveyer 6, reach and carry out changing accessory and repair welding operation on welding assembly platform 5, operation is transported to good steering again after finishing
On frame horizontal feed line machine 7;The bogie handling that accessory and repair welding need not be changed assembles bogie suspension conveyer 4 to detection
Upper reach carries out detection assembling operation on detection assembly or fitting table 3, and operation is transported to good bogie horizontal feed line machine 7 again after finishing
On.
Claims (1)
1. a kind of railway goods train bogie overhauls pipeline, by bogie horizontal conveyer to be repaired(l), decompose upset inspection desk
(2), detection assembly or fitting table(3), detection assembling bogie suspension conveyer(4), welding assembly platform(5), welding assembly bogie hang
Hang conveyer(6), good bogie horizontal feed line machine(7), hydraulic station(8)Composition, it is characterised in that:Bogie level to be repaired
Conveyer(1)Respectively with detection assembling bogie suspension conveyer(4)With welding assembly bogie suspension conveyer(6)It is connected,
Railway goods train bogie is transported to good bogie horizontal feed line machine(7)On, detection assembling bogie suspension conveyer(4)
With welding assembly bogie suspension conveyer(6)The annular transfer passage of each self-forming, overhauls the quantity of pipeline according to bogie
Quantity is overhauled to set;Described bogie horizontal conveyer to be repaired(l)It is chain structure, by frames(11), traction
Chain 12), drive device(13), drive sprocket(14), driven sprocket(15)Bogie carrying platform is installed on composition, chain
(16), bogie carrying platform(16)Quantity quantity set can be overhauled by bogie;Described decomposition upset inspection desk(2)It is
By hydraulic jack(21)And the hydraulic jack(21)The frame for possessing 60 ° of upset of control(22)Composition;Described detection group
Fill platform(3)It is by hydraulic jack(31)And described hydraulic jack(31)The frame for possessing 60 ° of upset of control(32)Composition, its
Positioned at horizontal conveyer(l)Front end, detection assembling bogie suspension conveyer(4)Bottom initiating terminal;Described detection group
Fill bogie suspension conveyer(4)It is by overhead track(41), haulage chain(42), balladeur train(43), suspender(44), change course device
(45), drive device(46)Composition;Described welding assembly platform(5)It is by hydraulic jack(51)And the hydraulic jack(51)Control
The frame for possessing 60 ° of upset of system(52)Composition;Described welding assembly bogie suspension conveyer(6)By overhead track
(61), haulage chain(62), balladeur train(63), suspender(64), change course device(65), drive device(66)Composition;Described good turn
To frame horizontal feed line machine(7)It is chain structure, it is by frames(71), haulage chain(72), drive device(73), actively
Sprocket wheel(74), driven sprocket(75)Bogie carrying platform is installed on composition, chain(76), the quantity of platform examined by bogie
Repair quantity set.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310460445.3A CN104512700B (en) | 2013-10-04 | 2013-10-04 | A kind of railway goods train bogie overhauls pipeline |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310460445.3A CN104512700B (en) | 2013-10-04 | 2013-10-04 | A kind of railway goods train bogie overhauls pipeline |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104512700A CN104512700A (en) | 2015-04-15 |
CN104512700B true CN104512700B (en) | 2017-10-27 |
Family
ID=52788647
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310460445.3A Active CN104512700B (en) | 2013-10-04 | 2013-10-04 | A kind of railway goods train bogie overhauls pipeline |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104512700B (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106891915B (en) * | 2015-08-04 | 2018-09-11 | 裴舜尧 | A kind of railway freight-car is without overhead traveling crane maintenance craft |
CN107585179A (en) * | 2017-08-31 | 2018-01-16 | 中车唐山机车车辆有限公司 | Bogie repair method |
CN110182233B (en) * | 2019-06-12 | 2020-09-08 | 中国神华能源股份有限公司 | Vehicle body maintenance system |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3865272B2 (en) * | 1997-03-28 | 2007-01-10 | 本田技研工業株式会社 | Vehicle assembly line and vehicle assembly method |
CN201235866Y (en) * | 2008-07-10 | 2009-05-13 | 北京铁科合力科技有限责任公司 | Suspension type steering frame examination and repair production chain |
CN201458285U (en) * | 2009-08-14 | 2010-05-12 | 王清林 | Suspension conveying line of railway wagon bogies |
CN102085871B (en) * | 2010-12-28 | 2016-01-06 | 中国北车集团沈阳机车车辆有限责任公司 | Bogie truck examination and repair system and repair method |
CN203227996U (en) * | 2013-01-24 | 2013-10-09 | 保尔沃特冶金技术(北京)有限公司 | Carrying apparatus for bogie production line |
-
2013
- 2013-10-04 CN CN201310460445.3A patent/CN104512700B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN104512700A (en) | 2015-04-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104512700B (en) | A kind of railway goods train bogie overhauls pipeline | |
CN207536669U (en) | Passenger car bogie AGV carrier loaders | |
CN107284331A (en) | The beam car of two-way fortune beam on a kind of asymmetric whole opening box girder beam of achievable large-tonnage | |
CN110948206A (en) | Bogie assembling and forming process and bolster and side frame assembling machine | |
CN102275596A (en) | Flow line detection method for bullet train bogie | |
CN206107398U (en) | Scrapped car disassembly line | |
CN102649507A (en) | Integrated pipe-transferring trolley | |
CN102408069A (en) | Rail-type gantry crane | |
CN202429920U (en) | Multi-trolley and double-girder gantry crane | |
CN203652504U (en) | Idler wheel conveying device | |
CN217678369U (en) | Synchronous lifting and transverse moving device for long steel rail replacement | |
CN207275550U (en) | A kind of novel automatic hangs sky pipeline | |
CN207791927U (en) | Brake beam underground pipeline | |
CN207523718U (en) | A kind of coal chemical industry is with leading ride | |
CN203669879U (en) | Down-hole hydraulic support assembling chamber | |
CN104973087A (en) | Method for repairing bullet train bogie assembly line | |
CN201633814U (en) | Vehicle body conveying line | |
CN202880361U (en) | Transfer carriage for nonstandard track gauge car | |
CN100534890C (en) | Bridge type lifting composite device for car body transportation | |
CN204529191U (en) | Remote controlled pile tube Lift-on/Lift-off System | |
CN100506679C (en) | Multifunctional car body transport equipment | |
CN203922480U (en) | A kind of track lifting shuttle | |
CN202481177U (en) | Wheel type tractor general assembly line | |
CN211141315U (en) | Tool for disassembling, assembling and overhauling drive axle of rail transport locomotive | |
CN207174729U (en) | A kind of piece uploading dolly for vehicle side induction system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20200617 Address after: 215600 No.11 Renmin Road, Leyu Town, Zhangjiagang City, Suzhou City, Jiangsu Province Patentee after: Zhangjiagang Leyu science and Technology Innovation Park Investment Development Co.,Ltd. Address before: 750006 the Ningxia Hui Autonomous Region Yinchuan Xingqing District Ningxia mechanical and electrical wholesale market No. 3 Building No. 6 business room Patentee before: NINGXIA ZHONGYUAN TIANSHENG TECHNOLOGY Co.,Ltd. |
|
TR01 | Transfer of patent right |