CN104505907A
CN104505907A CN201510011759.4A CN201510011759A CN104505907A CN 104505907 A CN104505907 A CN 104505907A CN 201510011759 A CN201510011759 A CN 201510011759A CN 104505907 A CN104505907 A CN 104505907A
Authority
CN
China
Prior art keywords
module
storage system
energy
monitoring
battery
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510011759.4A
Other languages
Chinese (zh)
Other versions
CN104505907B (en
Inventor
肖会
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Sino-EU Vaillant New Energy Power System Co., Ltd
Original Assignee
CHENGDU DINGZHIHUI SCIENCE AND TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHENGDU DINGZHIHUI SCIENCE AND TECHNOLOGY Co Ltd filed Critical CHENGDU DINGZHIHUI SCIENCE AND TECHNOLOGY Co Ltd
Priority to CN201510011759.4A priority Critical patent/CN104505907B/en
Publication of CN104505907A publication Critical patent/CN104505907A/en
Application granted granted Critical
Publication of CN104505907B publication Critical patent/CN104505907B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/10Flexible AC transmission systems [FACTS]

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention provides a monitoring device of a battery energy storage system with a reactive adjusting function. The monitoring device 11 comprises a renewable energy power generation device monitoring module 114, a storage battery monitoring module 115, a power distribution network connection module 112, a grid connection monitoring module 116, a center control module 117, a static var generator (SVG) monitoring module and a bus module 111, wherein the renewable energy power generation device monitoring module 114 is used for real-timely monitoring a renewable energy power generation device 12 in the battery energy storage system 10 and predicting power generation power of the renewable energy power generation device 12, the storage battery monitoring module 115 is used for real-timely monitoring a storage battery module 13 in an energy storage system 10 of a wind power plant, the power distribution network connection module 112 is used for real-timely obtaining operation conditions and related dispatch information of a power distribution network 20 from an adjusting and controlling center of the power distribution network 20, the grid connection monitoring module 116 is used for controlling the wind power plant energy storage system 10 to be connected with or isolated from the power distribution network 20, the center control module 117 is used for determining an operation strategy of the battery energy storage system 10 and sending instructions to the modules so as to execute a power supply strategy, the SVG monitoring module is used for real-timely monitoring an SVG module 14, and the bus module 111 is used for communication and contact of all modules of the monitoring device 11.

Description

A kind of supervising device with the battery energy storage system of Reactive-power control function
Art
The present invention relates to a kind of supervising device with the battery energy storage system of Reactive-power control function.
Background technology
In recent years, along with under energy demand and environmental protection dual-pressure, be developed rapidly with the distributed generation technology that photovoltaic, wind power generation and fuel gas generation are representative.Further, this emerging concept of microgrid is also proposed along with widely using of distributed energy.But, due to the natural discontinuity of distributed energy, the stability of system is caused to be on the hazard just gradually, in order to give full play to advantage and the benefit of renewable energy power generation, balance its random fluctuation, maintenance system is stablized, and improves the quality of power supply, uninterrupted power supply function etc. is provided, just must be equipped with the energy-storage units of certain capacity simultaneously in systems in which.
In the application of microgrid energy-storage system, the normal connected mode adopting a kind of DC bus, this connected mode is that energy-storage battery module accesses DC bus by a kind of two-way inverter, and when needing received energy, electrical network is charged to energy-storage battery by inverter; When needing to grid transmission, energy-storage battery is by two-way inverter grid power transmission.In addition, in microgrid energy-storage system, also SVG equipment can be prepared, for when being incorporated into the power networks, for power distribution network carries out reactive power compensation.
But energy storage cost is higher, considering the Financial cost that microgrid runs, when ensureing micro-grid system safe operation, the life-span of energy storage should be extended as far as possible.In addition, how to realize energy-storage system when being incorporated into the power networks, carrying out best power supply strategy, to meet economy, fail safe, is also urgent problem.
Summary of the invention
The invention provides a kind of supervising device with the battery energy storage system of Reactive-power control function.This supervising device can predict renewable energy power generation equipment, the ruuning situation of the battery module battery capacity of real-time detection and the power distribution network of Real-time Obtaining, formulate and implement optimum control strategy, ensure that energy-storage system steadily provides active power and reactive power according to the demand of power distribution network when grid-connected, and promote fail safe and the useful life of energy-storage system.
To achieve these goals, the invention provides a kind of supervising device with the battery energy storage system of Reactive-power control function, comprising:
Renewable energy power generation monitoring of tools module, for the renewable energy power generation equipment of real-time monitoring battery energy-storage system, and predicts the generated output of renewable energy power generation equipment;
Battery monitor module, can the SOC of the battery module of monitoring battery energy-storage system in real time;
Power distribution network contact module, knows the ruuning situation of power distribution network and relevant schedule information for real-time from power distribution network regulation and control center;
SVG monitoring module, for the SVG module of real-time monitoring battery energy-storage system, the idle output of control SVG;
Be incorporated into the power networks monitoring module, connects or isolation power distribution network for controlling energy-storage system;
Middle control module, for determining the operation reserve of energy-storage system, and sends instruction to each module in above-mentioned supervising device, to perform this operation reserve;
Bus module, for the liaison of the modules of this supervising device.
Preferably, described renewable energy power generation equipment is wind power equipment, and renewable energy power generation monitoring of tools module at least comprises wind-driven generator level pressure, electric current, frequency detection equipment, wind speed measurement equipment.
Preferably, described renewable energy power generation equipment is the service data of wind power equipment monitoring module Real-time Obtaining wind-powered electricity generation module, and stores data.
Preferably, battery monitor module at least comprises accumulator voltage, electric current, SOC checkout equipment and temperature testing equipment,
Preferably, described battery module, comprise n battery pack and n DC/DC current transformer, n is more than or equal to 3, and each battery pack is by the discharge and recharge of a DC/DC inverter controller, and this n DC/DC current transformer controls by battery module monitoring module.
Preferably, described SVG monitoring module, comprises the voltage and current checkout equipment of SVG module.
Preferably, described parallel control module at least comprises checkout equipment, data acquisition unit and data processing unit for detecting power distribution network and wind energy turbine set energy-storage system voltage, electric current and frequency, data acquisition unit comprises collection preliminary treatment and A/D modular converter, gather eight tunnel telemetered signal amounts, comprise grid side A phase voltage, electric current, three-phase voltage, the electric current of wind energy turbine set energy-storage system side.
The supervising device tool of battery energy storage system of the present invention has the following advantages: the power output situation of change of (1) Accurate Prediction renewable energy power generation equipment; (2) control strategy takes into account power distribution network scheduling requirement and energy-storage system ruuning situation, can simultaneously for power distribution network provides active power and reactive power, while meeting the dispatching requirement of power distribution network, take into account power supply reliability, ensure the fail safe of energy-storage system, extend the useful life of system stored energy system.
Accompanying drawing explanation
Fig. 1 shows a kind of block diagram with the supervising device of the battery energy storage system of Reactive-power control function of the present invention;
Fig. 2 shows the method for supervising of energy-storage system of the present invention.
Embodiment
Fig. 1 shows a kind of battery energy storage system 10 with Reactive-power control function, and this system 10 comprises: renewable energy power generation equipment 12, battery module 13, SVG module 14, AC/DC two-way change of current module 1, DC bus, the two-way change of current module 2 15 of AC/DC being used for connecting renewable energy power generation equipment 12 and DC bus and supervising device 11 for energy-storage system 10 and power distribution network 20 are connected and are isolated.
See Fig. 1, this supervising device 11 comprises: renewable energy power generation monitoring of tools module 114, for the renewable energy power generation equipment 12 in real-time monitoring battery energy-storage system 10, and predicts the generated output of renewable energy power generation equipment 12; Battery monitor module 115, for monitoring the battery module 13 in wind energy turbine set energy-storage system 10 in real time; Power distribution network contact module 112, regulates and controls center from power distribution network 20 know the ruuning situation of power distribution network 20 and relevant schedule information for real-time; Parallel control module 116, connects or isolates power distribution network 20 for controlling wind energy turbine set energy-storage system 10; Middle control module 117, for determining the operation reserve of battery energy storage system 10, and sends instruction to above-mentioned each module, to perform this power supply strategy; SVG monitoring module, for monitoring SVG module 14 in real time; Bus module 111, for the liaison of the modules of this supervising device 11.
Communication module 111, for the communication between above-mentioned modules, described bus communication module 111 is connected with other modules by redundancy dual CAN bus.
Renewable energy power generation equipment 12 comprises multiple wind-driven generator.The power output of wind-driven generator determined by the wind speed of wind-driven generator site, wind direction and unique characteristics, and renewable energy power generation monitoring of tools module 114 at least comprises wind-driven generator level pressure, electric current, frequency detection equipment, wind speed measurement equipment.
SVG monitoring module, comprises the voltage and current checkout equipment of SVG module.
Battery monitor module 116 at least comprises accumulator voltage, electric current, SOC checkout equipment and temperature testing equipment, can monitor the SOC of battery module in real time.
Middle control module 117 at least comprises CPU element, data storage cell and display unit.
Power distribution network contact module 112 at least comprises Wireless Telecom Equipment.
Parallel control module 116 at least comprises checkout equipment, data acquisition unit and data processing unit for detecting power distribution network and wind energy turbine set energy-storage system voltage, electric current and frequency.Data acquisition unit comprises collection preliminary treatment and A/D modular converter, gathers eight tunnel telemetered signal amounts, comprises grid side A phase voltage, electric current, three-phase voltage, the electric current of wind energy turbine set energy-storage system side.Remote measurement amount changes strong ac signal (5A/110V) into inner weak electric signal without distortion by the high-precision current in terminal and voltage transformer, after filtering process, enter A/D chip carry out analog-to-digital conversion, digital signal after conversion calculates through data processing unit, obtains three-phase voltage current value and the power distribution network 20 side phase voltage current value of wind energy turbine set energy-storage system 10 side.The process of this telemetered signal amount have employed high-speed and high-density synchronized sampling, automatic frequency tracking technology also has the fft algorithm improved, so precision is fully guaranteed, the measurement and process that gain merit in wind energy turbine set energy-storage system 10 side, idle and electric energy is from first-harmonic to higher harmonic components can be completed.
See accompanying drawing 2, method of the present invention comprises the steps:
S1. the service data of renewable energy power generation monitoring of tools module Real-time Obtaining renewable energy power generation equipment, and store data;
S2. according to the service data of renewable energy power generation equipment, the power output of the renewable energy power generation equipment in following predetermined instant is predicted, the exportable reactive power of real-time estimate SVG module;
S3. the SOC obtaining battery module is detected in real time, the parameter of Real-time Obtaining power distribution network and schedule information;
S4. using the meritorious demand in the schedule information of power distribution network and reactive requirement, the SOC of current batteries to store energy, following renewable energy power generation equipment power output and to the exportable reactive power of the SVG module of SVG module as constraints, realize the optimal control of battery energy storage system.
Preferably, renewable energy power generation equipment comprises multiple wind power equipment, in step s 2 described, predicts the power output of wind-powered electricity generation module in the following way, and the exportable reactive power of SVG module:
S201. gather in wind-powered electricity generation module that current all kinds of electricity measured value is as the initial value of the predicted value of all kinds of electricity, predicted value comprises: blower fan is gained merit predicted value predicted value that blower fan is idle blower fan set end voltage predicted value predicted value that SVG is idle sVG set end voltage predicted value energy-storage system site (PCC) prediction of busbar voltage value
S202. set up the MPC optimizing control models be made up of optimization object function and constraints according to described predicted value, and solve the predicted value of the meritorious of wind-powered electricity generation module and idle output:
The target function of MPC optimizing control models is such as formula shown in (1):
min Q WTG set , V SVG set ( Σ i = 0 N - 1 Σ j = 0 M - 1 ρ t i , j F 1 , Σ i = 0 N - 1 Σ j = 0 M - 1 ρ t i , j F 2 ) - - - ( 1 )
In formula (1) with for optimized variable, with implication is respectively the idle set point of blower fan and SVG voltage setting value; N is the number in time window Coverage Control cycle; M is the number containing future position under single control cycle; ρ is attenuation coefficient, value ρ < 1; Time variable ti, j=(Mi+j) Δ t meaning is the jth future position that current time plays in i-th control cycle, and Δ t is future position interval, and Δ t is determined by wind-powered electricity generation modular power predicted time interval;
F1 is wind-powered electricity generation module and the variance level of site busbar voltage and set point, and F1 expression is such as formula (2):
F 1 ( t i , j ) = [ V PCC pre ( t i , j ) - V PCC ref ] 2 - - - ( 2 )
In formula (2) represent the reference value of PCC voltage, setting after extracting from main website control command;
F2 is the idle level of reserve of SVG, and F2 expression is such as formula (3):
F 2 ( t i , j ) = [ Q SVG pre ( t i , j ) - Q SVG opr ] 2 - - - ( 3 )
In formula (3) for the idle best operating point of SVG;
The constraints of MPC optimizing control models, specifically comprises:
Blower fan is gained merit prediction-constraint condition:
P WTG pre ( t i , j ) = &Sigma; k = 1 N a &phi; k P WTG pre ( t i , j - k ) + &epsiv; WTG pre ( t i , j ) - &Sigma; k = 1 N m &theta; k &epsiv; WTG pre ( t i , j - k ) - - - ( 4 )
In formula (4) for blower fan is gained merit predicated error; Na and Nm is respectively the exponent number of AR and MA model, and φ k and θ k is associated weight, and exponent number and weight are all determined according to blower fan history value of gaining merit; Ti, j-k (comprise for participating in calculated data in prediction ) the corresponding moment, subscript k pushes away the k Δ t time before characterizing the prediction moment, works as ti, and during j-k≤0, meritorious predicted value should get corresponding moment history value;
Prediction-constraint condition that blower fan is idle:
Blower fan is idle reaches set point before controlling next time:
Q WTG pre ( t i , 0 ) = Q WTG set ( t i - 1,0 ) - - - ( 5 )
Each future position in i-th control cycle, the change procedure of blower fan reactive power is with exponential function matching:
Q WTG pre ( t i , j ) = 1 - e - ( t i , j - t i , 0 ) / T s 1 - e - M&Delta;t / T s Q WTG set ( t i , 0 ) + e - ( t i , j - t i , 0 ) / t s - e - M&Delta;t / T s 1 - e M&Delta;t / T s Q WTG pre ( t i , 0 ) - - - ( 6 )
In formula (6), Ts is blower fan Reactive-power control time constant, can obtain according to blower fan Reactive-power control testing experiment.
Prediction-constraint condition that SVG is idle:
Reference value that SVG is idle shown in (7):
Q SVG ref ( t i , j ) = K P [ V SVG pre ( t i , j ) - V SVG set ( t i , 0 ) ] + K I &Delta;t &Sigma; k = 0 i &times; M + j [ V SVG pre ( t i , j - k ) - V SVG set ( t i , - k ) ] + Q SVG pre ( t 0,0 ) - K P [ V SVG pre ( t 0,0 ) - V SVG set ( t 0,0 ) ] - - - ( 7 )
In formula (7), KI and KP is respectively the coefficient of proportional component and integral element;
Predicted value that SVG is idle is such as formula shown in (8):
Q SVG pre ( t i , j ) = Q SVG ref ( t i , j - 1 ) + [ Q SVG pre ( t i , j - 1 ) - Q SVG ref ( t i , j - 1 ) ] e - ( t i , j - t i , j - 1 ) / T d - - - ( 8 )
In formula (8), time constant Td is SVG power electronic equipment action delay;
Voltage prediction constraints:
v pef ( t i , j ) - v pre ( t 0,0 ) = s P WTG pre ( t i , j ) - P WTG pre ( t 0,0 ) Q WTG pre ( t i , j ) - Q WTG pre ( t 0,0 ) Q SVG pre ( t i , j ) - Q SVG pre ( t 0,0 ) - - - ( 9 )
V in formula (9) prefor the vector that blower fan machine end, SVG machine end and PCC prediction of busbar voltage value are formed, S is sensitivity matrix;
The constraints that system voltage, generator operation and SVG run:
v min &le; v pre ( t i , j ) &le; v max Q WTG min &le; Q WTG pre ( t i , j ) &le; Q WTG max Q SVG min &le; Q SVG pre ( t i , j ) &le; Q SVG max &Delta; Q WTG min &le; Q WTG pre ( t i , 0 ) - Q WTG pre ( t i - 1,0 ) &le; &Delta; Q WTG max &Delta; Q SVG min &le; Q SVG pre ( t i , 0 ) - Q SVG pre ( t i - 1,0 ) &le; &Delta; Q SVG max - - - ( 10 )
V in formula (10) maxand V minbe respectively by the upper and lower bound of PCC, blower fan and SVG voltage prediction value construction system voltage vector, wherein PCC voltage limits is provided by power distribution network control centre, and the normal range of operation that blower fan and SVG voltage limits provide according to device fabrication manufacturer is determined; with be respectively the idle operation bound of blower fan, with wei the idle operation bound of SVG, the normal range of operation all provided according to device fabrication manufacturer is determined; with be respectively the idle climbing bound of blower fan, with be respectively the idle climbing bound of SVG, all need to determine through reactive speed experimental results.
Preferably, in step s3 in the following way, the SOC of battery module is obtained:
S31. gather the voltage of storage battery, electric current, obtain the power of storage battery;
S32. according to the power of storage battery, judge whether the state of storage battery is in charge or discharge state;
S33. when storage battery does not carry out charge or discharge, then open circuit voltage method is adopted to calculate SOC;
S34. when storage battery is in charge or discharge state, then ampere-hour method is adopted to calculate SOC, and with previous moment result of calculation for ampere-hour method SOC initial value.
Preferably, in S34, when storage battery is in charged state, the formula (11) calculating SOC is as follows:
SOC = SOC 0 ( 1 - &delta; ) + P c &CenterDot; &Delta;t &CenterDot; &eta; c E c - - - ( 11 )
In formula, SOC 0for initial SOC value, δ represents storage battery self-discharge rate, P crepresent charge in batteries watt level, Δ t represents the time interval of twice calculating SOC value, η crepresent charge in batteries efficiency, E cfor the rated capacity of storage battery.
When storage battery is in discharge condition, the formula (12) calculating SOC is as follows:
SOC = SOC 0 ( 1 - &delta; ) - P d &CenterDot; &Delta;t E c &CenterDot; &eta; d - - - ( 12 )
In formula, Pd represents battery discharging watt level, and η d represents battery discharging efficiency.
Preferably, described battery module, comprise n battery pack and n DC/DC current transformer, n is more than or equal to 3, and each battery pack is by the discharge and recharge of a DC/DC inverter controller, and this n DC/DC current transformer controls by battery module monitoring module 115.
Preferably, in step s 4 which, above-mentioned optimal control comprises the optimal control to battery module SOC, and step is as follows:
S41. the reference value SOC of energy-storage system battery charge state SOC is calculated ref;
S42. the SOC of No. n-th battery pack of energy-storage system is judged nwhether with the reference value SOC of the battery charge state SOC of energy-storage system refequal, if SOC n≠ SOC refthen enter step S43, if SOC n=SOC refthen finishing control;
S43. the SOC of No. n-th battery pack of energy-storage system is judged nwhether be greater than the reference value SOC of the battery charge state SOC of energy-storage system refif, the SOC of No. n-th battery pack of energy-storage system nbe greater than the reference value SOC of the battery charge state SOC of energy-storage system ref, then step S44 is entered, if the SOC of energy-storage system No. n-th battery pack nbe not more than the reference value SOC of the battery charge state SOC of energy-storage system ref, then step S45 is entered;
S44. judge whether energy-storage system is discharge condition, if energy-storage system is discharge condition, then controls its No. n-th DC/DC current transformer electric discharge and enter step S42, if energy-storage system is not be in discharge condition, then control its No. n-th battery pack and enter hot stand-by duty, enter step S42;
S45. judge whether energy-storage system is charged state, if energy-storage system is charged state, then control No. n-th DC/DC current transformer charging, enter step S42, if energy-storage system is not be in charged state, then controls its No. n-th battery pack and enter hot stand-by duty, enter step S42.
Preferably, in step s 4 which, being constrained to of energy-storage system gross power Pg:
Non-response scheduling slot 1 time, P g, min≤ P g (l)≤ P g, max, P g, minfor the maximum power that energy-storage system 10 can absorb from power distribution network 20, P g, maxfor energy-storage system 10 can to the maximum power of power distribution network 20 transmission power;
Response scheduling period 2 times, P g (2)=P set, P setfor the dominant eigenvalues that the response scheduling period requires for 2 times.
Above content is in conjunction with concrete preferred implementation further description made for the present invention, can not assert that specific embodiment of the invention is confined to these explanations.For general technical staff of the technical field of the invention, without departing from the inventive concept of the premise, make some equivalent to substitute or obvious modification, and performance or purposes identical, all should be considered as belonging to protection scope of the present invention.

Claims (7)

1. there is a supervising device for the battery energy storage system of Reactive-power control function, comprising:
Renewable energy power generation monitoring of tools module, for the renewable energy power generation equipment of real-time monitoring battery energy-storage system, and predicts the generated output of renewable energy power generation equipment;
Battery monitor module, can the SOC of the battery module of monitoring battery energy-storage system in real time;
Power distribution network contact module, knows the ruuning situation of power distribution network and relevant schedule information for real-time from power distribution network regulation and control center;
SVG monitoring module, for the SVG module of real-time monitoring battery energy-storage system, the idle output of control SVG;
Be incorporated into the power networks monitoring module, connects or isolation power distribution network for controlling energy-storage system;
Middle control module, for determining the operation reserve of energy-storage system, and sends instruction to each module in above-mentioned supervising device, to perform this operation reserve;
Bus module, for the liaison of the modules of this supervising device.
2. supervising device as claimed in claim 1, it is characterized in that, described renewable energy power generation equipment is wind power equipment, and renewable energy power generation monitoring of tools module at least comprises wind-driven generator level pressure, electric current, frequency detection equipment, wind speed measurement equipment.
3. supervising device as claimed in claim 1 or 2, it is characterized in that, described renewable energy power generation equipment is the service data of wind power equipment monitoring module Real-time Obtaining wind-powered electricity generation module, and stores data.
4. supervising device as claimed in claim 3, it is characterized in that, battery monitor module at least comprises accumulator voltage, electric current, SOC checkout equipment and temperature testing equipment.
5. supervising device as claimed in claim 4, it is characterized in that, described battery module, comprise n battery pack and n DC/DC current transformer, n is more than or equal to 3, each battery pack is by the discharge and recharge of a DC/DC inverter controller, and this n DC/DC current transformer controls by battery module monitoring module.
6. supervising device as claimed in claim 5, is characterized in that described SVG monitoring module comprises the voltage and current checkout equipment of SVG module.
7. supervising device as claimed in claim 6, it is characterized in that, described parallel control module at least comprises checkout equipment, data acquisition unit and data processing unit for detecting power distribution network and wind energy turbine set energy-storage system voltage, electric current and frequency, data acquisition unit comprises collection preliminary treatment and A/D modular converter, gather eight tunnel telemetered signal amounts, comprise grid side A phase voltage, electric current, three-phase voltage, the electric current of wind energy turbine set energy-storage system side.
CN201510011759.4A 2015-01-09 2015-01-09 A kind of supervising device of the battery energy storage system with Reactive-power control function Expired - Fee Related CN104505907B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510011759.4A CN104505907B (en) 2015-01-09 2015-01-09 A kind of supervising device of the battery energy storage system with Reactive-power control function

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510011759.4A CN104505907B (en) 2015-01-09 2015-01-09 A kind of supervising device of the battery energy storage system with Reactive-power control function

Publications (2)

Publication Number Publication Date
CN104505907A true CN104505907A (en) 2015-04-08
CN104505907B CN104505907B (en) 2016-08-31

Family

ID=52947637

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510011759.4A Expired - Fee Related CN104505907B (en) 2015-01-09 2015-01-09 A kind of supervising device of the battery energy storage system with Reactive-power control function

Country Status (1)

Country Link
CN (1) CN104505907B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104795843A (en) * 2015-05-12 2015-07-22 刘冬明 Grid-connected wind power system with voltage stabilizing device and control method of grid-connected wind power system
CN108242831A (en) * 2016-12-27 2018-07-03 财团法人船舶暨海洋产业研发中心 battery management system control method
CN109560608A (en) * 2018-10-31 2019-04-02 国网浙江省电力有限公司电力科学研究院 A kind of intelligent managing and control system of distributed photovoltaic access power distribution network
CN113258596A (en) * 2021-06-16 2021-08-13 华能澜沧江水电股份有限公司 Energy storage power supply charging and discharging strategy for realizing unit power supply regulation based on shallow charging and shallow discharging
CN113919965A (en) * 2020-07-10 2022-01-11 上海电动工具研究所(集团)有限公司 Model training method and system, energy storage inverter and prediction method based on energy storage inverter
CN115864398A (en) * 2023-02-14 2023-03-28 国网浙江省电力有限公司宁波供电公司 Comprehensive energy distributed management scheduling method and system

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102355057A (en) * 2011-09-25 2012-02-15 国网电力科学研究院 Computer monitoring method for microgrid system
CN104037791A (en) * 2014-06-12 2014-09-10 华北电力大学 Multi-agent technology based scenery storage power generation coordination control method
CN104242335A (en) * 2014-06-30 2014-12-24 江苏华大天益电力科技有限公司 Wind and light storage generating unit capacity optimal configuration method based on rated capacity
CN104242339A (en) * 2014-08-29 2014-12-24 清华大学 Wind power plant voltage automatic control method based on model predictive control theory
CN104268806A (en) * 2014-11-03 2015-01-07 四川慧盈科技有限责任公司 Micro grid power monitoring system
CN104318494A (en) * 2014-11-21 2015-01-28 四川慧盈科技有限责任公司 Distributed generation intelligent monitoring system
CN104348188A (en) * 2014-11-21 2015-02-11 四川慧盈科技有限责任公司 Distributed generation running and monitoring method
CN104348189A (en) * 2014-11-21 2015-02-11 四川慧盈科技有限责任公司 Distributed generation system
CN104485682A (en) * 2015-01-05 2015-04-01 成都鼎智汇科技有限公司 Monitoring device for wind power plant energy storage system
CN104485681A (en) * 2015-01-05 2015-04-01 成都鼎智汇科技有限公司 Monitoring method for wind power plant energy storage system
CN104505850A (en) * 2015-01-05 2015-04-08 成都鼎智汇科技有限公司 Wind power plant energy storage system

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102355057A (en) * 2011-09-25 2012-02-15 国网电力科学研究院 Computer monitoring method for microgrid system
CN104037791A (en) * 2014-06-12 2014-09-10 华北电力大学 Multi-agent technology based scenery storage power generation coordination control method
CN104242335A (en) * 2014-06-30 2014-12-24 江苏华大天益电力科技有限公司 Wind and light storage generating unit capacity optimal configuration method based on rated capacity
CN104242339A (en) * 2014-08-29 2014-12-24 清华大学 Wind power plant voltage automatic control method based on model predictive control theory
CN104268806A (en) * 2014-11-03 2015-01-07 四川慧盈科技有限责任公司 Micro grid power monitoring system
CN104318494A (en) * 2014-11-21 2015-01-28 四川慧盈科技有限责任公司 Distributed generation intelligent monitoring system
CN104348188A (en) * 2014-11-21 2015-02-11 四川慧盈科技有限责任公司 Distributed generation running and monitoring method
CN104348189A (en) * 2014-11-21 2015-02-11 四川慧盈科技有限责任公司 Distributed generation system
CN104485682A (en) * 2015-01-05 2015-04-01 成都鼎智汇科技有限公司 Monitoring device for wind power plant energy storage system
CN104485681A (en) * 2015-01-05 2015-04-01 成都鼎智汇科技有限公司 Monitoring method for wind power plant energy storage system
CN104505850A (en) * 2015-01-05 2015-04-08 成都鼎智汇科技有限公司 Wind power plant energy storage system

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104795843A (en) * 2015-05-12 2015-07-22 刘冬明 Grid-connected wind power system with voltage stabilizing device and control method of grid-connected wind power system
CN108242831A (en) * 2016-12-27 2018-07-03 财团法人船舶暨海洋产业研发中心 battery management system control method
CN108242831B (en) * 2016-12-27 2021-08-03 财团法人船舶暨海洋产业研发中心 Battery management system control method
CN109560608A (en) * 2018-10-31 2019-04-02 国网浙江省电力有限公司电力科学研究院 A kind of intelligent managing and control system of distributed photovoltaic access power distribution network
CN113919965A (en) * 2020-07-10 2022-01-11 上海电动工具研究所(集团)有限公司 Model training method and system, energy storage inverter and prediction method based on energy storage inverter
CN113258596A (en) * 2021-06-16 2021-08-13 华能澜沧江水电股份有限公司 Energy storage power supply charging and discharging strategy for realizing unit power supply regulation based on shallow charging and shallow discharging
CN115864398A (en) * 2023-02-14 2023-03-28 国网浙江省电力有限公司宁波供电公司 Comprehensive energy distributed management scheduling method and system

Also Published As

Publication number Publication date
CN104505907B (en) 2016-08-31

Similar Documents

Publication Publication Date Title
CN104734195B (en) Monitoring method of wind, photovoltaic and storage-integrated micro-grid capable of being operated in a grid-connected manner
CN104485681B (en) A kind of monitoring method of wind energy turbine set energy-storage system
CN104505907B (en) A kind of supervising device of the battery energy storage system with Reactive-power control function
CN104682448A (en) Operation and monitoring method for battery energy storage power station based on power prediction
CN104682435A (en) Operation and monitoring method for micro-grid with energy storage system capable of stabilizing power fluctuation
CN104734190B (en) A kind of monitoring method of the micro-grid system being automatically obtained FREQUENCY CONTROL
CN104734194B (en) Wind, photovoltaic and storage-integrated micro-grid capable of being operated in a grid-connected manner
CN105356514A (en) Monitoring method for wind-light integrated power generation system capable of automatically realizing voltage balance
CN104701882A (en) Monitoring method of micro-grid system capable of automatically realizing energy balance
CN104734196A (en) Monitoring device of wind, photovoltaic and storage-integrated micro-grid capable of being operated in a grid-connected manner
CN104682436B (en) Energy storage system micro-grid capable of inhibiting power fluctuation
CN104753084A (en) Micro-grid system capable of controlling frequency automatically
CN104682409A (en) Monitoring device for micro-grid system capable of automatically realizing energy balance
CN104682410A (en) Micro-grid system capable of automatically realizing energy balance
CN104538981B (en) A kind of monitoring method of the battery energy storage system with Reactive-power control function
CN104682440A (en) Grid-connected operation photovoltaic power generation system
CN104682438A (en) Monitoring device for grid-connected operation photovoltaic power generation system
CN104659800A (en) Power prediction based monitoring device for battery energy storage power station
CN104701891A (en) Micro-grid system monitoring device capable of automatically achieving frequency control
CN104795843A (en) Grid-connected wind power system with voltage stabilizing device and control method of grid-connected wind power system
CN104682439A (en) Operation and monitoring method for grid-connected operation photovoltaic power generation system
CN104682449B (en) Monitoring device for micro-grid with energy storage system capable of stabilizing power fluctuation
CN105186580A (en) Method for monitoring grid-connected operation-allowable wind storage system
CN105322564A (en) Wind-solar integrated power generation system capable of automatically achieving voltage balance
CN104505850A (en) Wind power plant energy storage system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
CB03 Change of inventor or designer information

Inventor after: Wan Ruigu

Inventor before: Xiao Hui

COR Change of bibliographic data
TA01 Transfer of patent application right

Effective date of registration: 20160805

Address after: 210000 No. 123 Huai Hai Road, Lishui Economic Development Zone, Nanjing, Jiangsu

Applicant after: Nanjing Sino-EU Vaillant New Energy Power System Co., Ltd

Address before: The middle Tianfu Avenue in Chengdu city Sichuan province 610000 No. 1388 1 7 storey building No. 772

Applicant before: CHENGDU DINGZHIHUI SCIENCE AND TECHNOLOGY CO., LTD.

C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160831

Termination date: 20170109

CF01 Termination of patent right due to non-payment of annual fee