Nothing Special   »   [go: up one dir, main page]

CN104143781B - The electrification installation method of electricity testing grounding ring and the installation tool of electricity testing grounding ring - Google Patents

The electrification installation method of electricity testing grounding ring and the installation tool of electricity testing grounding ring Download PDF

Info

Publication number
CN104143781B
CN104143781B CN201310173774.XA CN201310173774A CN104143781B CN 104143781 B CN104143781 B CN 104143781B CN 201310173774 A CN201310173774 A CN 201310173774A CN 104143781 B CN104143781 B CN 104143781B
Authority
CN
China
Prior art keywords
electricity testing
grounding ring
testing grounding
insulating bar
staff
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310173774.XA
Other languages
Chinese (zh)
Other versions
CN104143781A (en
Inventor
李广军
马连君
张国海
李勇
武建国
徐永孝
杜英杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Beijing Electric Power Corp
Original Assignee
State Grid Corp of China SGCC
Beijing Electric Power Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Beijing Electric Power Corp filed Critical State Grid Corp of China SGCC
Priority to CN201310173774.XA priority Critical patent/CN104143781B/en
Publication of CN104143781A publication Critical patent/CN104143781A/en
Application granted granted Critical
Publication of CN104143781B publication Critical patent/CN104143781B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Testing Electric Properties And Detecting Electric Faults (AREA)
  • Electric Cable Installation (AREA)

Abstract

The invention provides a kind of electrification installation method of electricity testing grounding ring and the installation tool of electricity testing grounding ring.Electrification installation method includes:Step S1:Electricity testing grounding ring is lifted at wire using instrument is lifted;Step S2:Electricity testing grounding ring is fastenedly connected with wire using fastening tool.When installing electricity testing grounding ring, the excessive auxiliary power instrument due to no longer needing to use, such as many recovery vehicles at most only need two staff's collaborative works, thus reduce the waste of resource, reduce maintenance cost.Because staff no longer needs to wait powered class install the work of electricity testing grounding ring, thus the repairing stand-by period is shortened, improve the reliability of power supply.

Description

The electrification installation method of electricity testing grounding ring and the installation tool of electricity testing grounding ring
Technical field
The present invention relates to field of electricity construction, more particularly, to a kind of electrification installation method of electricity testing grounding ring and test The installation tool of electrically grounded ring.
Background technology
At present, the phenomenon of overhead conductor insulation is more universal, and staff installs electricity testing grounding ring(For example:Penetration type Electricity testing grounding ring, penetration type electricity testing grounding ring can be arranged on wire in the case where not divesting the insulating barrier of wire, while not Injure wire and required short circuit current flow can be reached)Method can not meet the need of accident maintenance and day-to-day operation maintenance work Will.
Common staff needs power failure operation when being repaired to circuit, then by climbing electric pole or standing in lifting To dead line install the work of electricity testing grounding ring on chassis.But there is following ask in this method for installing electricity testing grounding ring Topic:
1. there is potential safety hazard.Electricity testing grounding ring is installed even if having a power failure, sometimes also can foldback electricity when circuit is not grounded And induced electricity, so as to cause staff to get an electric shock.
2. adding the power failure stand-by period, the production given people, life are made troubles.Due to needing first to be stopped circuit It is electrically operated, then install the work of electricity testing grounding ring, so as to influence the normal electricity consumption of resident and enterprise.
3. electricity testing grounding ring can not be added at any time as needed, it is delayed emergency repair time.Required according to power construction, in circuit On add electricity testing grounding ring and need plan of application to have a power failure, either carry out adding electricity testing grounding ring or application in comprehensive maintenance Electricity testing grounding ring is installed by powered class.The excessive cycle of installation electricity testing grounding ring but application has a power failure, staff can not be right in time Need the circuit of maintenance to be handled, delay emergency repair time, cause potential safety hazard.Electrical verification ground connection is just added in comprehensive maintenance Ring, causes circuit operation to there is potential safety hazard.
To ensure the personal safety of staff, need powered class to carry out installation when carrying out accident maintenance to alive circuit and test The work of electrically grounded ring.But there is problems with the method for using powered class to install electricity testing grounding ring:
A. it is delayed emergency repair time, powered class installs electricity testing grounding ring and limited by construction site surrounding environment, sometimes powered Car can not enter job site, so that electricity testing grounding ring can not be installed in time.
B. need several staff's cooperations, need auxiliary power instrument many, cause the wasting of resources.Accident maintenance process In, be when ground wire is installed on original electricity testing grounding ring or electricity testing grounding ring being installed, it is necessary to simultaneously using many recovery vehicles, Several staff's cooperative cooperatings complete repairing work, so as to cause the wasting of resources, add emergency repair time, expand repairing model Enclose, reduce the reliability of power supply.
The content of the invention
The present invention is intended to provide the electrification installation method and the installation tool of electricity testing grounding ring of a kind of electricity testing grounding ring, to solve Certainly in the prior art powered installation electricity testing grounding ring when exist and need several staff cooperation, need auxiliary power instrument excessive And the problem of cause the wasting of resources.
In order to solve the above technical problems, a kind of according to an aspect of the invention, there is provided powered peace of electricity testing grounding ring Dress method, including:Step S1:Electricity testing grounding ring is lifted at wire using instrument is lifted;Step S2:Will using fastening tool Electricity testing grounding ring is fastenedly connected with wire.
Further, step S1 is specifically included:Step S11:Electricity testing grounding ring is articulated on the instrument of lifting;Step S12: Instrument is lifted in movement, electricity testing grounding ring is lifted at wire, and electricity testing grounding ring is connected on wire.
Further, step S2 is specifically included:Step S21:Fastening tool is engaged with the fastener of electricity testing grounding ring;Step Rapid S22:Actuating fastening tool makes fastener be fastenedly connected electricity testing grounding ring with wire;Step S23:Continue actuating fastening work Tool, until fastener by untill twisting into two parts.
According to another aspect of the present invention there is provided a kind of installation tool of electricity testing grounding ring, including:Lift component, Lifting component includes the first insulating bar and lift stand, and lift stand is arranged on the first end of the first insulating bar;And fastening assembly, fastening Component includes the second insulating bar and fastening part, and fastening part is arranged on the first end of the second insulating bar.
Further, lift stand includes:Support body, the first end of support body is connected with the first end of the first insulating bar;And electrical verification Ground loop is linked up with, and electricity testing grounding ring links up with the second end for being arranged on support body.
Further, support body includes:Fixed part, fixed part is connected with the first end of the first insulating bar;Two support members, often The first end of individual support member is connected with fixed part, and two support members are set at intervals, and the second end of each support member is equal Protruding to the direction away from the first insulating bar, the second end of each support member is provided with an electricity testing grounding ring hook.
Further, lift stand and the first insulating bar are detachably connected.
Further, fastening part includes:Connecting rod, the first end of connecting rod and the second insulating bar are detachably connected;With For the sleeve with the appended claims of electricity testing grounding ring, sleeve is removably disposed in the second end of connecting rod.
Further, fastening assembly also includes torque spanner, and the second end of torque spanner and the second insulating bar is removably Connection.
Further, installation tool also includes connection fixture, and connection fixture, which is arranged on, to be lifted on component, and fastening assembly passes through Connect fixture detachably connected with lifting component.
When staff installs electricity testing grounding ring using the electrification installation method in the present invention, it is necessary first to using lifting work Tool lifts electricity testing grounding ring at wire, is then fastenedly connected electricity testing grounding ring with wire using fastening tool.Installation is tested During electrically grounded ring, the excessive auxiliary power instrument due to no longer needing to use, such as many recovery vehicles at most only need two works Make Collaboration work, thus reduce the waste of resource, reduce maintenance cost.Because staff no longer needs to wait band Electric class install the work of electricity testing grounding ring, thus shortens the repairing stand-by period, improves the reliability of power supply.
Brief description of the drawings
The accompanying drawing for constituting the part of the application is used for providing a further understanding of the present invention, schematic reality of the invention Apply example and its illustrate to be used to explain the present invention, do not constitute inappropriate limitation of the present invention.In the accompanying drawings:
Fig. 1 diagrammatically illustrates the main view for lifting component of the installation tool in a preferred embodiment in the present invention Figure;
Fig. 2 diagrammatically illustrates Fig. 1 left view;
Fig. 3 diagrammatically illustrates the main view for lifting component of the installation tool in another preferred embodiment in the present invention Figure;
Fig. 4 diagrammatically illustrates Fig. 3 left view;And
Fig. 5 diagrammatically illustrates the structural representation of the fastening assembly of the installation tool in the present invention.
Reference in figure:10th, component is lifted;11st, the first insulating bar;11a, the first insulating bar first end;11b, Second end of one insulating bar;12nd, lift stand;13rd, support body;13a, fixed part;13b, two support members;14th, electricity testing grounding ring is hung Hook;20th, fastening assembly;21st, the second insulating bar;21a, the second insulating bar first end;21b, the second insulating bar the second end; 22nd, fastening part;22a, sleeve;22b, connecting rod;23rd, torque spanner;24th, connector.
Embodiment
Embodiments of the invention are described in detail below in conjunction with accompanying drawing, but the present invention can be defined by the claims Implement with the multitude of different ways of covering.
As the first aspect of the invention, there is provided a kind of electrification installation method of electricity testing grounding ring.Powered installation side Method includes:Step S1:Using lifting instrument by electricity testing grounding ring(For example:Penetration type electricity testing grounding ring)Lift wire(For example: 10KV suspended insulated guide wire)Place;Step S2:Electricity testing grounding ring is fastenedly connected with wire using fastening tool.
Staff installs electricity testing grounding ring using the electrification installation method in the present invention(Electrical verification, installing can be carried out to connect The operation of ground wire)When, it is necessary to wear insulating glove, the excessive auxiliary power instrument due to no longer needing to use, for example:Many are robbed Repair, at most only need two staff's collaborative works, thus reduce the waste of resource, reduce maintenance cost.Due to Staff no longer needs to wait powered class install the work of electricity testing grounding ring, thus shortens the repairing stand-by period, carries The high reliability of power supply.Because staff can add electricity testing grounding ring in time in repairing and maintenance as needed, because And improve first-aid repair efficiency.Due to not needing power failure operation, thus improve power supply reliability.Powered installation side in the present invention Method is adapted to different repairing environment, even if with the unapproachable repairing scene of electric car, staff can also be installed The work of electricity testing grounding ring.
Preferably, step S1 is specifically included:Step S11:Electricity testing grounding ring is articulated on the instrument of lifting;Step S12:Move It is dynamic to lift instrument, electricity testing grounding ring is lifted at wire, and electricity testing grounding ring is connected on wire.Due to electricity testing grounding ring It is articulated on the instrument of lifting, thus is easy to staff that electricity testing grounding ring is placed on the instrument of lifting, and is easy to electrical verification to be grounded Ring with wire after being connected, and the instrument of lifting can be unloaded easily from electricity testing grounding ring, so as to improve installation electrical verification ground connection The reliability of ring.
Preferably, step S2 is specifically included:Step S21:Fastening tool is engaged with the fastener of electricity testing grounding ring;Step S22:Actuating fastening tool makes fastener be fastenedly connected electricity testing grounding ring with wire;Step S23:Continue actuating fastening tool, Until fastener by untill twisting into two parts.In a preferred embodiment, staff installs penetration type on powered wire and tested During electrically grounded ring, electricity testing grounding ring(Electricity testing grounding ring includes ring body and penetrating cable clamp, and penetrating cable clamp is welded with ring body, punctures line Press from both sides for being connected to wire)It has been connected on wire, has now only needed to screw the fastening of electricity testing grounding ring using fastening tool Part, enters in the insulated hull of wire, and electricity testing grounding ring is fixedly connected with wire so that the pricker of electricity testing grounding ring is punctured. According to the use requirement of penetration type electricity testing grounding ring, after fastener has been screwed, staff still need to using fastening tool after It is continuous to screw fastener, twisted into two parts until fastener untill electricity testing grounding ring inside.
As the second aspect of the invention, there is provided a kind of installation tool of electricity testing grounding ring.As shown in Figures 1 to 5, Installation tool includes:Component 10 is lifted, component 10 is lifted including the first insulating bar 11 and lift stand 12, lift stand 12 is arranged on the The first end 11a of one insulating bar 11;With fastening assembly 20, fastening assembly 20 includes the second insulating bar 21 and fastening part 22, fastening Portion 22 is arranged on the first end 21a of the second insulating bar 21.Component 10 is lifted due to being provided with, thus facilitates staff by electrical verification Ground loop is lifted at wire.Due to being provided with fastening assembly 20, thus the electrical verification that staff can be to being connected at wire The fastener of ground loop is fastened.
Preferably, the length of the first insulating bar 11 and the second insulating bar 21 is more than 0.7 meter.According to power industry livewire work Requirement, to ensure the safety of staff's livewire work, the length of the first insulating bar 11 and the second insulating bar 21 is no less than 0.7 meter.In a preferred embodiment, the length of the first insulating bar 11 and the second insulating bar 21 is 1 meter.
Preferably, the first insulating bar 11 and the second insulating bar 21 are insulation restrictor bars.Because insulation restrictor bar meets power industry Construction requirement standard, thus use insulation restrictor bar as insulating bar, not only meet use requirement, and reliability is high, to work The construction for making personnel provides safety guarantee.
Preferably, the first insulating bar 11 includes at least two first bodies of rod, and at least two first bodies of rod are successively removably Connection.Further, at least two first bodies of rod are connected through a screw thread.Because at least two first bodies of rod removably connect successively Connect, thus staff can be according to the demand of job site environment, addition or the number for reducing by first body of rod, so that this hair The length for lifting component 10 in bright can be adjusted, and add the use scope for lifting component 10.
When staff is using component 10 is lifted, the ring body of electricity testing grounding ring should be articulated on lift stand 12, work people The hand of member should hold one end of the remote lift stand 12 of the first insulating bar 11.
Preferably, lift stand 12 includes:Support body 13, the first end of support body 13 and the first end 11a of the first insulating bar 11 connect Connect;With electricity testing grounding ring hook 14, electricity testing grounding ring hook 14 is arranged on the second end of support body 13(Fig. 1 be refer to Fig. 4).By 14 are linked up with being provided with electricity testing grounding ring, thus facilitates staff that electricity testing grounding ring is articulated on lift stand 12, and After electricity testing grounding ring is connected with wire, the removal from electricity testing grounding ring of component 10 is conveniently lifted.
Preferably, support body 13 takes the shape of the letter U or V-arrangement.
Preferably, electricity testing grounding ring hook 14 is that metal material is made.Further, metal material is iron wire or wire Core.Because electricity testing grounding ring hook 14 is that metal material is made, thus it not only can guarantee that electricity testing grounding ring can be consolidated Ground is articulated on electricity testing grounding ring hook 14, and staff can also be grounded according to the size of electricity testing grounding ring to electrical verification The degree of crook of ring hook 14 is adjusted, so that electricity testing grounding ring hook 14 has good match with electricity testing grounding ring Property, improve installation reliability.
Preferably, as shown in Figures 1 to 4, support body 13 includes:Fixed part 13a, fixed part 13a and the first insulating bar 11 First end 11a connections;Two support members 13b, each support member 13b first end are connected with fixed part 13a, two support members 13b is set at intervals, and each support member 13b the second end is protruding to the direction away from the first insulating bar 11, often Individual support member 13b the second end is provided with an electricity testing grounding ring hook 14.Due to being provided with two support member 13b, and often Individual support member 13b the second end is provided with electricity testing grounding ring hook 14, thus electricity testing grounding ring can mount stably On support body 13, so that the problem of avoiding coming off because electricity testing grounding ring mounting is unstable.
Preferably, lift stand 12 and the first insulating bar 11 are detachably connected.Further, lift stand 12 and first insulate Bar 11 is connected through a screw thread.Because lift stand 12 and the first insulating bar 11 are detachably connected, thus the first insulating bar 11 has Good replaceability, staff can use the problem of the first insulating bar 11 handles other livewire work, so as to expand Lift the use scope of component 10.Certainly, the fastening part 22 of fastening assembly 20 can also removably connect with the second insulating bar 21 Connect.
Preferably, fastening part 22 includes:Connecting rod 22b, connecting rod 22b first end and the second insulating bar 21 are removably Connection;With for the sleeve 22a with the appended claims of electricity testing grounding ring, sleeve 22a is removably disposed in connecting rod 22b's Second end(It refer to Fig. 5).Further, connecting rod 22b is threadedly coupled with the second insulating bar 21.Preferably, sleeve 22a is interior Hexagonal jacket.Due to sleeve 22a and appended claims, thus sleeve 22a size of the size preferably with fastener coincide, So staff is facilitated to screw fastener.Because sleeve 22a and connecting rod 22b are detachably connected, thus convenient work people Member changes to sleeve 22a, and staff can be according to the size of fastener, the sleeve 22a that selection is adapted to, so as to carry The use reliability of high fastening assembly 20.
Preferably, as shown in figure 5, fastening assembly 20 also includes connector 24, one end of connector 24 and the second insulating bar 21 threaded connections, the second end of connector 24 is provided with neck, and the connection end of torque spanner 23 is provided with convex with neck clamping Rise.Because connector 24 is threadedly coupled with the second insulating bar 21, thus facilitate staff by connector 24 from the second insulating bar Disassembled on 21, such second insulating bar 21 can be also used in other livewire work, so as to expand the second insulating bar 21 Use scope.Because connector 24 and torque spanner 23 will easily can be turned round by clamping engagement, thus staff Torque wrench 23 is disassembled with connector 24, and torque spanner 23 still can apply to other different areas of activity, thus further increase The use scope of torque spanner 23, improves the use reliability of fastening assembly 20.
Preferably, as shown in figure 5, fastening assembly 20 also includes torque spanner 23, the insulating bar 21 of torque spanner 23 and second The second end 21b it is detachably connected.Due to being provided with torque spanner 23, thus staff can be according to using needing setting The twisting resistance size of torque spanner 23, so as to avoid overexerting or too small during the second insulating bar 21 of rotation, is improved The use reliability of fastening assembly 20.Due to being provided with torque spanner 23, thus staff can be insulated with a hand grip second Bar 21,23 pair of second insulating bar 21 of another hand grip torque spanner rotate, so as to increase the arm of force, reduce the big of force It is small, reduce labor intensity, improve operating efficiency.
Preferably, the installation tool in the present invention also includes connection fixture, and connection fixture, which is arranged on, to be lifted on component 10, tightly Gu component 20 is detachably connected with lifting component 10 by connecting fixture., can be by when staff uses installation tool Fastening assembly 20 is disassembled from connection fixture, fastening assembly 20 is separated with lifting component 10, is facilitated staff to tight Gu component 20, lift component 10 and manipulated.When that need not use installation tool, fastening assembly 20 is by connecting fixture and support Lift component 10 connect, so not only facilitate staff carry installation tool, also avoid fastening assembly 20 or lift component 10 because Separate and lose.Certainly, connection fixture can also be arranged on fastening assembly 20, lift component 10 by connecting fixture and fastening Component 20 is detachably connected.
Preferably, connection fixture be fixedly installed on the first insulating bar 11 for lifting component 10, and connection fixture can with it is tight Gu the second insulating bar 21 of component 20 engages.
Preferably, connection fixture presss from both sides for U-shaped card.
In a preferred implementation, the support body 13 for lifting component 10 takes the shape of the letter U;Support body 13 and electricity testing grounding ring hook 14 1 It is body formed;Support body 13 and electricity testing grounding ring link up with 14 be 4.0 iron it is thread;Lift stand 12 passes through the first outer button screw rod and the One insulating bar 11 is detachably connected, and the diameter of the first outer button screw rod is 30mm, and the length of the first outer button screw rod is 70mm;Fastening The sleeve 22a of component 20 length is 14mm;Connecting rod 22b is stepped cylinder, and connecting rod 22b is outside loop bar and second Screw rod composition is detained, the diameter of loop bar is 15mm, and the length of loop bar is 75mm, and the diameter of the second outer button screw rod is outside 30mm, second The length for detaining screw rod is 50mm;Connector 24 is cylinder, and the internal diameter of one end of connector 24 is 35mm, the height of connector 24 For 45mm, the other end of connector 24 offers the square opening that length is 1.25mm.
The preferred embodiments of the present invention are the foregoing is only, are not intended to limit the invention, for the skill of this area For art personnel, the present invention can have various modifications and variations.Within the spirit and principles of the invention, that is made any repaiies Change, equivalent substitution, improvement etc., should be included in the scope of the protection.

Claims (4)

1. a kind of installation tool of electricity testing grounding ring, it is characterised in that including:
Component (10) is lifted, the component (10) of lifting includes the first insulating bar (11) and lift stand (12), the lift stand (12) it is arranged on the first end (11a) of first insulating bar (11);With
Fastening assembly (20), the fastening assembly (20) includes the second insulating bar (21) and fastening part (22), the fastening part (22) first end (21a) of second insulating bar (21) is arranged on,
The fastening part (22) includes:
Connecting rod (22b), the first end of the connecting rod (22b) and second insulating bar (21) are detachably connected;With
For the sleeve (22a) with the appended claims of the electricity testing grounding ring, the sleeve (22a) is removably disposed in institute The second end of connecting rod (22b) is stated,
The lift stand (12) includes:
Support body (13), the first end of the support body (13) is connected with the first end (11a) of first insulating bar (11);With
Electricity testing grounding ring links up with (14), and the electricity testing grounding ring hook (14) is arranged on the second end of the support body (13),
Support body (13) takes the shape of the letter U or V-arrangement, and the support body (13) includes:
Fixed part (13a), the fixed part (13a) is connected with the first end (11a) of first insulating bar (11);
Two support members (13b), the first end of each support member (13b) is connected with the fixed part (13a), two institutes Support member (13b) is stated to set at intervals, and each support member (13b) the second end to remote first insulating bar (11) direction is protruding, and the second end of each support member (13b) is provided with an electricity testing grounding ring hook (14)。
2. installation tool according to claim 1, it is characterised in that the lift stand (12) and first insulating bar (11) it is detachably connected.
3. installation tool according to claim 1, it is characterised in that the fastening assembly (20) also includes torque spanner (23), the second end (21b) of the torque spanner (23) and second insulating bar (21) is detachably connected.
4. installation tool according to claim 1, it is characterised in that the installation tool also includes connection fixture, described Connection fixture is lifted on component (10) described in being arranged on, and the fastening assembly (20) lifts group by the connection fixture with described Part (10) is detachably connected.
CN201310173774.XA 2013-05-10 2013-05-10 The electrification installation method of electricity testing grounding ring and the installation tool of electricity testing grounding ring Active CN104143781B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310173774.XA CN104143781B (en) 2013-05-10 2013-05-10 The electrification installation method of electricity testing grounding ring and the installation tool of electricity testing grounding ring

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310173774.XA CN104143781B (en) 2013-05-10 2013-05-10 The electrification installation method of electricity testing grounding ring and the installation tool of electricity testing grounding ring

Publications (2)

Publication Number Publication Date
CN104143781A CN104143781A (en) 2014-11-12
CN104143781B true CN104143781B (en) 2017-08-01

Family

ID=51852897

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310173774.XA Active CN104143781B (en) 2013-05-10 2013-05-10 The electrification installation method of electricity testing grounding ring and the installation tool of electricity testing grounding ring

Country Status (1)

Country Link
CN (1) CN104143781B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105490207B (en) * 2015-12-18 2017-10-24 国家电网公司 A kind of high-voltage isulation circuit is grounded link installation tool
CN105826870A (en) * 2016-06-08 2016-08-03 国网辽宁省电力有限公司电力科学研究院 Wedge-shaped diversion line ground potential live installation combination tool

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201075410Y (en) * 2007-08-10 2008-06-18 安徽省电力公司淮北供电公司 Insulation circuitry earth lead fast suspension instrument
CN201204405Y (en) * 2008-04-23 2009-03-04 宁夏电力公司宁东供电局 Multiplexer for electrified fastening pin type insulator
CN201413950Y (en) * 2009-04-14 2010-02-24 山东电力集团公司济南供电公司 Live-wire work operating rod for fixing conducting wires
CN201570836U (en) * 2009-12-09 2010-09-01 洛阳龙羽集团有限公司检修分公司 Special installation tool for cable clamp protector
JP2010239839A (en) * 2009-03-31 2010-10-21 Nagaki Seiki Co Ltd Remote control bar set
CN202059098U (en) * 2011-04-26 2011-11-30 安徽省电力公司淮北供电公司 Installation rod of 10KV insulation piercing wire clamp
CN203233103U (en) * 2013-05-10 2013-10-09 国家电网公司 Installation tool for electricity testing grounding ring

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201075410Y (en) * 2007-08-10 2008-06-18 安徽省电力公司淮北供电公司 Insulation circuitry earth lead fast suspension instrument
CN201204405Y (en) * 2008-04-23 2009-03-04 宁夏电力公司宁东供电局 Multiplexer for electrified fastening pin type insulator
JP2010239839A (en) * 2009-03-31 2010-10-21 Nagaki Seiki Co Ltd Remote control bar set
CN201413950Y (en) * 2009-04-14 2010-02-24 山东电力集团公司济南供电公司 Live-wire work operating rod for fixing conducting wires
CN201570836U (en) * 2009-12-09 2010-09-01 洛阳龙羽集团有限公司检修分公司 Special installation tool for cable clamp protector
CN202059098U (en) * 2011-04-26 2011-11-30 安徽省电力公司淮北供电公司 Installation rod of 10KV insulation piercing wire clamp
CN203233103U (en) * 2013-05-10 2013-10-09 国家电网公司 Installation tool for electricity testing grounding ring

Also Published As

Publication number Publication date
CN104143781A (en) 2014-11-12

Similar Documents

Publication Publication Date Title
CN105140675B (en) Improve the earth potential working non-bearing connecting clip of work efficiency
WO2012088987A1 (en) Maintenance tool for insulator of direct current transmission line
CN103269036A (en) Tensioning resistant cross arm lifting machine
CN103368104B (en) The insulating bar of earth potential working non-bearing connecting clip
CN104143781B (en) The electrification installation method of electricity testing grounding ring and the installation tool of electricity testing grounding ring
CN203674624U (en) Sleeve-type combination tool for live-line jumper clamp fastening
CN204144784U (en) A kind of adjustable strain insulator wire load replacing insulator protective device
CN102820621B (en) Node heating method for ground potential treatment substation equipment
CN205509371U (en) Bird ware external member is driven in electrified installation
CN106450835A (en) Shoe manufacturer high voltage wire landing device
CN106711845A (en) Insulated operating rod and wiring method
CN206250670U (en) It is a kind of to be easy to operation and safe replacing device for insulator
CN202405695U (en) Lifting tool for overhead ground wire of steel pipe pole
CN104348122B (en) Ground potential mounting type shunt wire clamp device and mounting method thereof
CN205377164U (en) Special fixture of large -tonnage II type suspension insulator wire end
CN203233103U (en) Installation tool for electricity testing grounding ring
CN203536865U (en) Combined wire-tightening tool for tightening line wire
CN205377216U (en) A device for fixing earthing cable
CN205319355U (en) Pole line integral type earthing device
CN206471748U (en) Universal 500kV straight lines wineglass tower line maintenance cross-arm hanging point device
CN203909088U (en) Portable insulating operation rod
CN203909222U (en) Clamp plate electrode for 220 kV and greater insulation tool AC high-voltage holding test device
CN102420402A (en) New process for fastening drainage wire clamp in electrified manner
CN105811303A (en) Kit for electric installation of bird repeller
CN105762702A (en) Method for replacing L-shaped insulator string of +/-800kV direct current transmission line

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant