CN104038395B - 一种解决调度数据专网占用过多主站数配资源的方法 - Google Patents
一种解决调度数据专网占用过多主站数配资源的方法 Download PDFInfo
- Publication number
- CN104038395B CN104038395B CN201410271355.4A CN201410271355A CN104038395B CN 104038395 B CN104038395 B CN 104038395B CN 201410271355 A CN201410271355 A CN 201410271355A CN 104038395 B CN104038395 B CN 104038395B
- Authority
- CN
- China
- Prior art keywords
- optical
- scheduling data
- transmission device
- special web
- data special
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Data Exchanges In Wide-Area Networks (AREA)
- Small-Scale Networks (AREA)
- Optical Communication System (AREA)
Abstract
本发明公开了一种解决调度数据专网占用过多主站数配资源的方法,其核心思想是电‑光转换,即将主站中的通信光传输设备(1)与调度数据专网后台服务器(2)之间原有的E1通道(5)(电通道)更换为CPOS通道(光通道);该发明的方法去除了原有通道中的数字配线架(3)跳接环节,有效减少了通道故障点的数量,降低了维护成本,大大提高了信息传输的速率,增强了通道的运行安全可靠性。
Description
技术领域
本发明涉及调度自动化和电力通信相关技术领域,尤其涉及调度数据专网建设中的通信通道建设领域。
背景技术
随着电网发展水平的不断提高,电网调度自动化发展趋势也势如破竹,110kV及以上变电站都在快速建设调度数据专网。为了进一步增强网络的运行可靠性,从国家电网至各地区电网又提出了调度数据专网“双平面”建设方案,即同一个变电站至少需要两个不同调度数据专网的出口方向,这样以来,伴随着电网的发展,调度数据专网所需的通信通道数将成倍的增长,无疑对电力通信网也提出了越来越高的支撑保障要求。
现有的调度数据专网通道基本上都是以传统的E1为主,主站和子站间连接形式主要是点对点式,照此计算,地区电网若有n座110kV及以上变电站点,就需要在主站和各子站间提供至少n条E1通道(5),那么按照现有的通信网模式,在调度主站的通信机房就需要有至少n条E1业务落地,而每有一条E1业务落地,通信机房的通信光传输设备(1)中的E1支路板(4)和数字配线架(3)就将被相应的占用一路物理配线资源。长此以往,通信机房的数字配线架(3)将大量被用于承载调度数据专网业务,而无力承载电网运行所必须的其他业务信息,除非对数配进行不断的扩容,但扩容又必将带来通信机房设备运行空间的缺失,最终导致重要通信设备无法安装,且数字配线架(3)扩容还需设计传输设备的槽位和卡板扩容等诸多问题,所需成本较大,因此,综合以上分析,调度数据专网占用过多主站数配资源已成了一个制约通信网发展所必须解决的问题,否则,也必将制约电网调度自动化发展的步伐,进而影响电网的可靠稳定运行。
发明内容
本发明提供了一种解决调度数据专网占用过多主站数配资源的方法,可有效解决现有网络模式下调度数据专网建设对通信通道资源被大量占用的问题。
本发明提供的解决调度数据专网占用过多主站数配资源的方法,其核心思想是电-光转换,即将主站中的通信光传输设备(1)与调度数据专网后台服务器(2)之间原有的E1通道(5)(电通道)更换为CPOS通道(光通道)。
解决调度数据专网占用过多主站数配资源的方法,包括如下步骤:
a)在通信光传输设备(1)上增加一块光支路板(6),根据实际需求,光接口(9)选为STM-1;
b)通过光传输网管完成对新增的光支路板(6)相应的硬件配置,确保其能够正常工作;
c)在调度数据专网后台服务器(2)上增加一块CPOS卡板(7),其光接口(10)速率应与通信光传输设备(1)上增加的光支路板(6)的光接口(9)速率保持一致;
d)完成对CPOS卡板(7)的相关软硬件配置;
e)分别对光支路板(6) 的光接口(9)和CPOS卡板(7)的光接口(10)进行性能指标测试;
f)利用光纤(8)将通信光传输设备(1)上增加的光支路板(6)的光接口(9)与调度数据专网后台服务器(2)上增加的CPOS卡板(7)的光接口(10)正确连接;
g)通信和自动化管理双方确定此条连接光路中各时隙的分配站点名称;
h)利用光传输网管,在主站通信光传输设备(1)上通过光交叉卡板将各子站过来的E1信号交叉至光支路板(6)所对应的光接口(9),并选择好相应的占用时隙;
i) 主站中通信光传输设备(1)与调度数据专网后台服务器(2)之间的通道完成了电-光的转换。
相对于现有技术的有益效果是,采用上述方案,本发明的方法去除了原有通道中的数字配线架(3)跳接环节,有效减少了通道故障点的数量,降低了维护成本。
本发明提供的方法使原有的E1通道(5)(电通道) 转变为CPOS通道(光通道),大大提高了信息传输的速率,增强了通道的运行安全可靠性。
附图说明
图1为原有的主站调度数据专网后台服务器(2)与通信光传输设备(1)间的通道连接示意图;
图2为本发明提供的解决方法所设计的主站调度数据专网后台服务器(2)与通信光传输设备(1)间的通道连接示意图;
具体实施方式
本发明提供了一种解决调度数据专网占用过多主站数配资源的方法,其核心思想是电-光转换,即将主站中的通信光传输设备与调度数据专网后台服务器之间原有的E1通道(5) (电通道)更换为CPOS通道(光通道)。通道连接示意图如图2所示,具体实施方法如下:
a)在通信光传输设备(1)上增加一块光支路板(6),根据实际需求,光接口(9)选为STM-1;
b)通过光传输网管完成对新增的光支路板(6)相应的硬件配置,确保其能够正常工作;
c)在调度数据专网后台服务器(2)上增加一块CPOS卡板(7),其光接口(10)速率应与通信光传输设备(1)上增加的光支路板(6)的光接口(9)速率保持一致;
d)完成对CPOS卡板(7)的相关软硬件配置;
e)分别对光支路板(6) 的光接口(9)和CPOS卡板(7)的光接口(10)进行性能指标测试;
f)利用光纤(8)将通信光传输设备(1)上增加的光支路板(6)的光接口(9)与调度数据专网后台服务器(2)上增加的CPOS卡板(7)的光接口(10)正确连接;
g)通信和自动化管理双方确定此条连接光路中各时隙的分配站点名称;
h)利用光传输网管,在主站通信光传输设备(1)上通过光交叉卡板将各子站过来的E1信号交叉至光支路板(6)所对应的光接口(9),并选择好相应的占用时隙;
i) 主站中通信光传输设备(1)与调度数据专网后台服务器(2)之间的通道完成了电-光的转换。
需要说明的是,上述各技术特征继续相互组合,形成未在上面列举的各种实施例,均视为本发明说明书记载的范围;并且,对本领域普通技术人员来说,可以根据上述说明加以改进或变换,而所有这些改进和变换都应属于本发明所附权利要求的保护范围。
Claims (1)
1.一种解决调度数据专网占用过多主站数配资源的方法,其特征在于,包括如下步骤:
a)在通信光传输设备(1)上增加一块光支路板(6),根据实际需求,光接口(9)选为STM-1;
b)通过光传输网管完成对新增的光支路板(6)相应的硬件配置,确保其能够正常工作;
c)在调度数据专网后台服务器(2)上增加一块CPOS卡板(7),其光接口(10)速率应与通信光传输设备(1)上增加的光支路板(6)的光接口(9)速率保持一致;
d)完成对CPOS卡板(7)的相关软硬件配置;
e)分别对光支路板(6) 的光接口(9)和CPOS卡板(7)的光接口(10)进行性能指标测试;
f)利用光纤(8)将通信光传输设备(1)上增加的光支路板(6)的光接口(9)与调度数据专网后台服务器(2)上增加的CPOS卡板(7)的光接口(10)正确连接;
g)通信和自动化管理双方确定此条连接光路中各时隙的分配站点名称;
h)利用光传输网管,在主站通信光传输设备(1)上通过光交叉卡板将各子站过来的E1信号交叉至光支路板(6)所对应的光接口(9),并选择好相应的占用时隙;
i) 主站中通信光传输设备(1)与调度数据专网后台服务器(2)之间的通道完成了电-光的转换。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410271355.4A CN104038395B (zh) | 2014-06-18 | 2014-06-18 | 一种解决调度数据专网占用过多主站数配资源的方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410271355.4A CN104038395B (zh) | 2014-06-18 | 2014-06-18 | 一种解决调度数据专网占用过多主站数配资源的方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104038395A CN104038395A (zh) | 2014-09-10 |
CN104038395B true CN104038395B (zh) | 2017-03-01 |
Family
ID=51468989
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410271355.4A Expired - Fee Related CN104038395B (zh) | 2014-06-18 | 2014-06-18 | 一种解决调度数据专网占用过多主站数配资源的方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104038395B (zh) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106130639A (zh) * | 2016-06-14 | 2016-11-16 | 许昌学院 | 解决调度数据专网占用过多主站数配资源的方法 |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6778778B1 (en) * | 2001-01-11 | 2004-08-17 | Sprint Communications Company, L.P. | Arrangement and method for testing fiber optic telecommunications circuits over dense wavelength division multiplexing (DWDM) |
CN101106426A (zh) * | 2006-07-11 | 2008-01-16 | 上海科泰信息技术有限公司 | 多业务光纤收发器光纤接入系统 |
CN101262406A (zh) * | 2008-04-10 | 2008-09-10 | 艾默生网络能源有限公司 | 双向环网系统及其控制方法 |
CN201690569U (zh) * | 2009-12-25 | 2010-12-29 | 中国移动通信集团公司 | 虚拟ddf配线系统 |
CN201910673U (zh) * | 2011-01-17 | 2011-07-27 | 邯郸供电公司 | 基于sdh传输网络的电力调度通讯系统 |
CN202679367U (zh) * | 2012-05-30 | 2013-01-16 | 河南省电力公司郑州供电公司 | 变电站外挂rpr的sdh遥视系统 |
CN202888963U (zh) * | 2012-09-29 | 2013-04-17 | 上海市电力公司 | 一种主站控制配电网自动化通信系统 |
-
2014
- 2014-06-18 CN CN201410271355.4A patent/CN104038395B/zh not_active Expired - Fee Related
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6778778B1 (en) * | 2001-01-11 | 2004-08-17 | Sprint Communications Company, L.P. | Arrangement and method for testing fiber optic telecommunications circuits over dense wavelength division multiplexing (DWDM) |
CN101106426A (zh) * | 2006-07-11 | 2008-01-16 | 上海科泰信息技术有限公司 | 多业务光纤收发器光纤接入系统 |
CN101262406A (zh) * | 2008-04-10 | 2008-09-10 | 艾默生网络能源有限公司 | 双向环网系统及其控制方法 |
CN201690569U (zh) * | 2009-12-25 | 2010-12-29 | 中国移动通信集团公司 | 虚拟ddf配线系统 |
CN201910673U (zh) * | 2011-01-17 | 2011-07-27 | 邯郸供电公司 | 基于sdh传输网络的电力调度通讯系统 |
CN202679367U (zh) * | 2012-05-30 | 2013-01-16 | 河南省电力公司郑州供电公司 | 变电站外挂rpr的sdh遥视系统 |
CN202888963U (zh) * | 2012-09-29 | 2013-04-17 | 上海市电力公司 | 一种主站控制配电网自动化通信系统 |
Also Published As
Publication number | Publication date |
---|---|
CN104038395A (zh) | 2014-09-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102710443B (zh) | 一种电力通信继电保护业务影响分析方法及其系统 | |
CN102904645B (zh) | 基于epon分层技术的配电网通信组网结构 | |
CN104460589B (zh) | 移动式模拟调度主站调试系统 | |
CN107070724A (zh) | 一种电力通信网端到端业务通信状态监测方法 | |
CN104468586B (zh) | 基于modbus协议的光伏电站远程智能监控通讯方法 | |
CN103678776A (zh) | 轨道车辆电气配线工程化设计方法 | |
CN105610612A (zh) | 智能数字配线架系统及应用方法 | |
CN105260837A (zh) | 一种教学管理系统及其教学管理方法 | |
CN106570781A (zh) | 基于三层两网结构的智能变电站监控信息分步验收方法 | |
CN105554796A (zh) | 一种基于智能定位无线ap故障原因的方法 | |
CN204906004U (zh) | 一种网络分层分布式的智能区域电网 | |
CN104038395B (zh) | 一种解决调度数据专网占用过多主站数配资源的方法 | |
CN108228749A (zh) | 一种通用的时序数据的快速迁移方法 | |
CN110474801A (zh) | 基于业务可靠性的电力通信网络故障仿真方法 | |
CN104376220B (zh) | 一种多维度的电力通信接入网业务建模和需求分析方法 | |
CN103560908B (zh) | 一种集中控制的智能odn电子标签机盘管理电路 | |
CN106899082A (zh) | 一种继电保护装置远程诊断方法与系统 | |
CN201467146U (zh) | 一种传送网络拓扑结构安全分析系统 | |
CN209676257U (zh) | 一种基于hsr环网的智能站跨间隔保护系统 | |
CN106130639A (zh) | 解决调度数据专网占用过多主站数配资源的方法 | |
CN206820765U (zh) | 一种终端通信接入网通信资源模型架构 | |
CN105977971A (zh) | 基于配网gis电网单线图的停电分析方法 | |
CN104701981A (zh) | 一种智能变电站光纤链路的示意方法 | |
CN204946131U (zh) | 轨道门禁环网控制系统 | |
CN106789159A (zh) | 一种电力通信重要业务通道影响分析系统 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170301 Termination date: 20210618 |
|
CF01 | Termination of patent right due to non-payment of annual fee |