Anchorage for structural members in soil or in rock and method of producing this anchorage Download PDF

Info

Publication number
CH635885A5
CH635885A5 CH164679A CH164679A CH635885A5 CH 635885 A5 CH635885 A5 CH 635885A5 CH 164679 A CH164679 A CH 164679A CH 164679 A CH164679 A CH 164679A CH 635885 A5 CH635885 A5 CH 635885A5
Authority
CH
Switzerland
Prior art keywords
anchor
anchoring
casing
borehole
anchoring according
Prior art date
Application number
CH164679A
Other languages
German (de)
Inventor
Gottlieb Moser
Original Assignee
Stump Bohr Ag
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Stump Bohr Ag filed Critical Stump Bohr Ag
Priority to CH164679A priority Critical patent/CH635885A5/en
Priority to DE19792926155 priority patent/DE2926155A1/en
Priority to AT66480A priority patent/ATA66480A/en
Priority to BE0/199468A priority patent/BE881817A/en
Publication of CH635885A5 publication Critical patent/CH635885A5/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • E21D20/02Setting anchoring-bolts with provisions for grouting
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads
    • E02D5/76Anchorings for bulkheads or sections thereof in as much as specially adapted therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D21/00Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection
    • E21D21/0093Accessories

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Description

Die Erfindung betrifft eine Verankerung für Bauteile im Erdreich oder im Fels mit in einem Bohrloch eingesetzten, von einer erhärteten Injektionsmasse umgebenen Anker. The invention relates to anchoring for components in the ground or in rock with anchors inserted into a borehole and surrounded by a hardened injection compound.

Der Anwendungsbereich solcher Verankerungen erstreckt sich vornehmlich auf vorgespannte oder nicht vorgespannte Zuganker, dann aber auch auf Druckanker, Dübel sowie Messeinrichtungen wie Extensometer usw. The field of application of such anchors extends primarily to prestressed or non-prestressed tie rods, but then also to pressure anchors, dowels and measuring devices such as extensometers etc.

Zur Verankerung von Bauteilen im Erdreich und im Fels ist es u.a. aus der CH-PS 519 062 bekannt, einen Anker, bestehend aus einem Ankerkörper und einem damit verbundenen, stangenförmigen Zugglied, in das Bohrloch einzusetzen. Dann wird eine fliessfähige Injektionsmasse unter Druck in das Bohrloch eingepresst, wobei die Masse mit grosser Kraft gegen die Bohrwandung gedrückt wird. In weichem Erdmaterial wird das Bohrungsloch dadurch in der Verankerungszone erweitert. Nach dem Erhärten der Masse sitzt der Anker fest im Erdreich oder im Felsen und kann belastet werden. Among other things, it is used to anchor components in the ground and in rock. from CH-PS 519 062 known to insert an anchor, consisting of an anchor body and an associated rod-shaped tension member, into the borehole. Then a flowable injection mass is pressed into the borehole under pressure, the mass being pressed against the drilling wall with great force. In soft earth material, the borehole is expanded in the anchoring zone. After the mass has hardened, the anchor sits firmly in the ground or in the rock and can be loaded.

Die bekannte Verankerung eignet sich nicht in klüftigen Felsen oder blockigem und kiesigem Boden mit Hohlräumen, die nicht gefüllt werden dürfen oder die nicht wirtschaftlich mit dem Injektionsgut verschlossen werden können. The known anchoring is not suitable in jagged rocks or blocky and gravelly ground with cavities that must not be filled or that cannot be closed economically with the injection material.

Aufgabe der Erfindung ist es nun, eine Verankerung der eingangs erwähnten Gattung zu schaffen, die mit Vorteil im klüftigen Fels und im blockigen Boden verwendet werden kann. Zusätzlich soll sie sich auch für alle anderen Böden eignen, da wo nur eine begrenzte Injektion angestrebt wird. The object of the invention is now to provide anchoring of the type mentioned at the outset, which can be used with advantage in jagged rock and in blocky soil. In addition, it should also be suitable for all other floors, where only a limited injection is desired.

Die erfindungsgemässe Verankerung zeichnet sich dadurch aus, dass der Anker in einer Verankerungszone von einer flexiblen, mindestens für Flüssigkeit durchlässigen Hülle ummantelt ist, welche die Injektionsmasse einschliesst und von dieser gegen die Bohrwandung gepresst ist. The anchoring according to the invention is characterized in that the anchor is encased in an anchoring zone by a flexible shell which is at least permeable to liquid, which encloses the injection mass and is pressed by it against the drilling wall.

Das erfindungsgemässe Verfahren zur Herstellung einer solchen Verankerung ist dadurch gekennzeichnet, dass der Anker mit einer flexiblen, mindestens für Flüssigkeit durchlässigen, sackartigen Hülle ummantelt wird, deren freies Ende dicht an den Anker angeschlossen wird, dass der Anker mit der Hülle in das Bohrloch eingebracht wird, und dass mittels eines Röhrensystems fliessfähiges Injektionsgut in die Hülle eingepresst wird, um diese satt gegen die Bohrwandung zu pressen. The method according to the invention for producing such anchoring is characterized in that the anchor is encased with a flexible, at least liquid-permeable, sack-like cover, the free end of which is connected tightly to the anchor, so that the anchor with the cover is introduced into the borehole , and that flowable injection material is pressed into the casing by means of a pipe system in order to press it firmly against the drilling wall.

Nach dem Einpressen des in der Regel aus einer Zementschlemme bestehenden Injektionsgutes werden durch die satt an der Bohrwandung anliegende Hülle vorhandene Hohlräume im Fels überbrückt. Infolge der Durchlässigkeit der Hülle können überflüssiges Wasser und bei entsprechender Wahl der Maschengrösse auch ein Teil der Feinkörnung aus der Hülle austreten. After the grouting material, which usually consists of a cement slurry, has been pressed in, existing cavities in the rock are bridged by the casing, which fits snugly against the drilling wall. As a result of the permeability of the casing, excess water and, with a suitable choice of mesh size, also a part of the fine grain can emerge from the casing.

Nachfolgend werden anhand der Zeichnungen Ausführungsbeispiele der Erfindung näher erläutert. Es zeigen: Exemplary embodiments of the invention are explained in more detail below with reference to the drawings. Show it:

Fig. 1 schematisch einen Längsschnitt durch eine Verankerung in blockigem Boden und Fig. 1 shows schematically a longitudinal section through an anchoring in blocky soil and

Fig. 2 schematisch einen Längsschnitt durch eine Verankerung im klüftigen Fels. Fig. 2 shows schematically a longitudinal section through an anchoring in the cleft rock.

Bei der ersten Ausführungsform der Verankerung gemäss Fig. 1 wird in an sich bekannter Weise im blockigen Boden 1 eine Bohrung 2 erstellt. Der aus einer oder mehreren Stangen bestehende Zuganker 3 wird längs der Haftzone 4 mit einem sackähnlichen, leicht durchlässigen Gewebestrumpf 5 umhüllt, dessen offenes Ende 6 mittels einer Klemme 7 dicht gegen den Zuganker 3 angeschlossen wird. Auf dem Zuganker 3 können Distanzhalter oder Scheiben 8 montiert werden, um diesen zentrisch in der Bohrung 2 auszurichten. In the first embodiment of the anchoring according to FIG. 1, a bore 2 is made in the blocky bottom 1 in a manner known per se. The tie rod 3 consisting of one or more rods is encased along the adhesive zone 4 with a bag-like, slightly permeable fabric stocking 5, the open end 6 of which is connected tightly against the tie rod 3 by means of a clamp 7. Spacers or disks 8 can be mounted on the tie rod 3 in order to align them centrally in the bore 2.

Der Zuganker 3 mit dem Gewebestrumpf 5 wird dann in das Bohrloch 2 eingesetzt, und das aus einer Zementschlemme bestehende Injektionsgut wird mit Druck in den Strumpf 5 eingepresst. The tie rod 3 with the fabric stocking 5 is then inserted into the borehole 2, and the injection material consisting of a cement slurry is pressed into the stocking 5 with pressure.

Das Einpressen des Injektionsgutes erfolgt in bekannter Weise über ein in der Hülle verlegtes, separates Röhrensystem 10, welches einbahnig oder mit Rücklauf, mit oder ohne Ventile sowie mit oder ohne Kolben ausgeführt sein kann. Ebenso kann auch ein Entlüftungsrohr eingebaut werden. The injection material is pressed in in a known manner via a separate tube system 10 laid in the casing, which can be single-lane or with return, with or without valves and with or without pistons. A ventilation pipe can also be installed.

Der Strumpf 5 kann aus Textilfasern oder einem metallischen Gittergewebe bestehen. Statt des Strumpfes könnte auch eine Siebhülle aus Kunststoff, Metall oder einem anderen Material verwendet werden. Das Material des Strumpfes bzw. der Hülle muss eine gewisse Verformbarkeit besitzen, damit es an die Bohrlochwandung angepresst werden kann. Ebenso muss es eine gewisse Längsfestigkeit aufweisen, damit es die Hohlräume 11 zwischen den einzelnen Blöcken 12 statisch überbrücken kann. The stocking 5 can consist of textile fibers or a metallic mesh. Instead of the stocking, a sieve cover made of plastic, metal or another material could also be used. The material of the stocking or the cover must have a certain deformability so that it can be pressed against the borehole wall. Likewise, it must have a certain longitudinal strength so that it can statically bridge the cavities 11 between the individual blocks 12.

Im Bereich der Hohlräume 11 wölbt sich der Strumpf 5 The stocking 5 bulges in the area of the cavities 11

2 2nd

s s

10 10th

15 15

20 20th

25 25th

30 30th

35 35

40 40

45 45

50 50

55 55

60 60

65 65

3 3rd

635885 635885

nach aussen, wodurch Erweiterungen 13 entstehen, die zur guten Verzahnung des Ankers 3 im Boden beitragen. Wenn die Hohlräume zwischen den Blöcken bzw. die Spaltenweiten im Fels ein gewisses, für die Strumpffestigkeit zu grosses Mass erreichen, können zusätzliche Verstärkungen des Strumpfes, bestehend aus Stäben, Geflechten oder Spiralen aus Metall oder anderen geeigneten Stoffen, vorgesehen werden. Diese Verstärkungen können im Strumpf integriert sein oder auch separat zur Stützung des Strumpfes angewendet werden, wobei sie dann vor dem Einpressen der Injektionsmasse in die Bohrung eingesetzt werden. outwards, which creates extensions 13 that contribute to the good interlocking of the armature 3 in the ground. If the cavities between the blocks or the gap widths in the rock reach a certain level that is too high for the stocking strength, additional reinforcements of the stocking, consisting of rods, braids or spirals made of metal or other suitable materials, can be provided. These reinforcements can be integrated in the stocking or can also be used separately to support the stocking, in which case they are then inserted into the bore before the injection compound is pressed in.

Durch gegenseitige Abstimmung zwischen der Strumpfdurchlässigkeit und der Konsistenz des Injektionsgutes kann erreicht werden, dass von diesem Injektionsgut nur der überschüssige Anteil der Flüssigkeit austreten kann oder aber auch eine begrenzte Menge an Feinkornmaterial, das in den umliegenden Boden eindringen kann. Auf jeden Fall werden die gröberen Teile der Injektionsmasse durch den Strumpf zurückbehalten. Bei der Verwendung einer Siebhülle aus Kunststoff oder Metall wird die Sieblochung entsprechend gewählt. Die Siebhülle wird zweckmässigerweise aus einer dünnen, vorgelochten Siebplatte gefertigt und als flexibler Zylinder über den Anker geschoben. By mutual coordination between the stocking permeability and the consistency of the injection material, it can be achieved that only the excess portion of the liquid can escape from this injection material or else a limited amount of fine-grained material that can penetrate into the surrounding soil. In any case, the coarser parts of the injection mass are retained by the stocking. If a sieve cover made of plastic or metal is used, the perforation is selected accordingly. The screen cover is expediently made from a thin, pre-perforated screen plate and pushed over the anchor as a flexible cylinder.

Im zweiten Ausführungsbeispiel gemäss Fig. 2 ist der Anker 3 in klüftigem Felsmaterial 14 eingesetzt. Dort, wo es 5 für den späteren Ausbau des Ankers von Vorteil ist, kann der Strumpf 5 in Längsrichtung in mehrere Teilstücke 15 unterteilt werden, wobei die Trennung z.B. mittels Einbau von Scheiben 16 erleichtert wird. Der gefüllte Strumpf 5 ist auch hier satt an die Bohrlochwand gepresst und überbrückt die io Spalten 17 im Fels 14. In the second exemplary embodiment according to FIG. 2, the anchor 3 is inserted in rocky rock material 14. Where it is 5 of advantage for the later removal of the anchor, the stocking 5 can be divided in the longitudinal direction into several sections 15, the separation e.g. is facilitated by installing washers 16. The filled stocking 5 is also firmly pressed against the borehole wall and bridges the io columns 17 in the rock 14.

Zwecks Durchlass des Injektionsgutes können die Scheiben 8,16 gelocht sein oder am Aussenumfang gezähnt sein. Diese Ausnehmungen dienen auch zur Aufnahme des Röhrensystems. In order to allow the material to be injected, the disks 8, 16 can be perforated or toothed on the outer circumference. These recesses also serve to accommodate the tube system.

ls Die Verankerung kann auch für kiesig-sandigen Boden verwendet werden, insbesondere wenn verhindert werden soll, dass nicht zuviel des Injektionsgutes in den Boden eindringt. Durch entsprechende Wahl der Strumpfdurchlässigkeit kann erreicht werden, dass eine kontrollierte Menge des feinkörnigen Anteils des Injektionsgutes in den Boden gelangt. ls The anchorage can also be used for gravelly-sandy soil, especially if you want to prevent that too much of the injection material does not penetrate the soil. By appropriately selecting the permeability of the stockings, it can be achieved that a controlled amount of the fine-grained portion of the injection material gets into the soil.

20 20th

B B

1 Blatt Zeichnungen 1 sheet of drawings

Claims (10)

635885 PATENTANSPRÜCHE635885 PATENT CLAIMS 1. Verankerung für Bauteile im Erdreich oder im Fels mit in einem Bohrloch eingesetzten, von einer erhärteten Injektionsmasse umgebenen Anker, dadurch gekennzeichnet, dass der Anker (3) in einer Verankerungszone (4) von einer flexiblen, mindestens für Flüssigkeit durchlässigen Hülle (5) ummantelt ist, welche die Injektionsmasse (9) einschliesst und von dieser gegen die Bohrwandung gepresst ist. 1. Anchoring for components in the ground or in the rock with anchors inserted in a borehole and surrounded by a hardened injection compound, characterized in that the anchor (3) in an anchoring zone (4) has a flexible sheath (5) which is at least permeable to liquid. is encased, which encloses the injection mass (9) and is pressed by this against the drilling wall. 2. Verankerung nach Anspruch 1, dadurch gekennzeichnet, dass die sackartige Hülle (5) aus einem Gewebestrumpf oder aus einem Siebkörper besteht. 2. Anchoring according to claim 1, characterized in that the sack-like casing (5) consists of a fabric stocking or a sieve body. 3. Verankerung nach Anspruch 2, dadurch gekennzeichnet, dass der Gewebestrumpf aus einem Geflecht aus Textilien, Metall oder Kunststoff, und der Siebkörper aus einer dünnen Platte aus Metall oder Kunststoff gefertigt ist. 3. Anchoring according to claim 2, characterized in that the fabric stocking is made of a mesh of textiles, metal or plastic, and the sieve body is made of a thin plate made of metal or plastic. 4. Verankerung nach Anspruch 1, dadurch gekennzeichnet, dass zur Stützung der Hülle (5) Verstärkungselemente wie Stäbe, Geflechte oder spiralförmige Körper vorgesehen sind, die in die Hülle integriert sind oder unabhängig von dieser im Bohrloch (2) eingesetzt sind. 4. Anchoring according to claim 1, characterized in that reinforcing elements such as rods, braids or spiral bodies are provided to support the casing (5), which are integrated in the casing or are used independently of this in the borehole (2). 5. Verankerung nach Anspruch 1, dadurch gekennzeichnet, dass die Hülle (5) in mehrere Teilstücke (15) unterteilt ist. 5. Anchoring according to claim 1, characterized in that the sheath (5) is divided into several sections (15). 6. Verankerung nach Anspruch 1, dadurch gekennzeichnet, dass zwecks Zentrierung des Ankers (3) im Bohrloch und/oder zur Unterteilung der Hülle (5) in mehrere Teilstücke ( 15) Scheiben (8,16) auf dem Anker (3) befestigt sind. 6. Anchoring according to claim 1, characterized in that for centering the anchor (3) in the borehole and / or for dividing the shell (5) into several sections (15) disks (8, 16) are attached to the anchor (3) . 7. Verankerung nach Anspruch 6, dadurch gekennzeichnet, dass die Scheiben (8,16) zwecks Durchlass des Injektionsgutes gelocht sind und/oder am Aussenumfang gezähnt sind. 7. Anchoring according to claim 6, characterized in that the disks (8, 16) are perforated for the passage of the injection material and / or are serrated on the outer circumference. 8. Verankerung nach Anspruch 1, dadurch gekennzeichnet, dass das offene Ende der Hülle (5) dicht am Anker (3) angeschlossen ist. 8. Anchoring according to claim 1, characterized in that the open end of the sheath (5) is connected close to the anchor (3). 9. Verankerung nach Anspruch 1, dadurch gekennzeichnet, dass die Hülle (5) auch für einen vorbestimmten Feinanteil des Kornmaterials der Injektionsmasse durchlässig ist. 9. Anchoring according to claim 1, characterized in that the sheath (5) is permeable to a predetermined fine fraction of the grain material of the injection mass. 10. Verfahren zur Herstellung der Verankerung nach Patentanspruch 1, dadurch gekennzeichnet, dass der Anker mit einer flexiblen, mindestens für Flüssigkeit durchlässigen, sackartigen Hülle ummantelt wird, deren freies Ende dicht an den Anker angeschlossen wird, dass der Anker mit der Hülle in das Bohrloch eingebracht wird, und dass mittels eines Röhrensystems fliessfähiges Injektionsgut in die Hülle einge-presst wird, um diese satt gegen die Bohrwandung zu pressen. 10. The method for producing the anchor according to claim 1, characterized in that the anchor is coated with a flexible, at least liquid-permeable, sack-like casing, the free end of which is connected tightly to the anchor, that the anchor with the casing into the borehole is introduced, and that flowable injection material is pressed into the casing by means of a tube system in order to press it firmly against the drilling wall.
CH164679A 1979-02-20 1979-02-20 Anchorage for structural members in soil or in rock and method of producing this anchorage CH635885A5 (en)

Priority Applications (4)

Application Number Priority Date Filing Date Title
CH164679A CH635885A5 (en) 1979-02-20 1979-02-20 Anchorage for structural members in soil or in rock and method of producing this anchorage
DE19792926155 DE2926155A1 (en) 1979-02-20 1979-06-28 CONNECTING A COMPONENT TO SURROUNDING SOIL OR ROCK AND METHOD FOR PRODUCING THIS CONNECTION
AT66480A ATA66480A (en) 1979-02-20 1980-02-07 CONNECTION OF ANCHOR TO THE SURROUNDING WALL OF A DRILL HOLE AND METHOD FOR PRODUCING THE CONNECTION
BE0/199468A BE881817A (en) 1979-02-20 1980-02-20 CONNECTION OF A CONSTRUCTION ELEMENT WITH THE EARTHS OR ROCKS SURROUNDING IT AND METHOD FOR ITS ESTABLISHMENT

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CH164679A CH635885A5 (en) 1979-02-20 1979-02-20 Anchorage for structural members in soil or in rock and method of producing this anchorage

Publications (1)

Publication Number Publication Date
CH635885A5 true CH635885A5 (en) 1983-04-29

Family

ID=4215322

Family Applications (1)

Application Number Title Priority Date Filing Date
CH164679A CH635885A5 (en) 1979-02-20 1979-02-20 Anchorage for structural members in soil or in rock and method of producing this anchorage

Country Status (4)

Country Link
AT (1) ATA66480A (en)
BE (1) BE881817A (en)
CH (1) CH635885A5 (en)
DE (1) DE2926155A1 (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3726191A1 (en) * 1986-08-13 1988-02-25 Vsl Int Ag Device for sealing the intermediate space between a central tube and an outer casing, and use of the same
DE3844417A1 (en) * 1988-12-30 1990-07-05 Tgb Technogrundbau Gmbh Method of producing a grouted anchor which can be retightened and has permanent corrosion protection, and grouted anchor produced by this method
DE4408173A1 (en) * 1994-03-10 1995-09-14 Moebius Josef Bau Ground stabilisation method for road=building and other earthworks
DE19518830A1 (en) * 1994-03-10 1996-11-28 Moebius Josef Bau Method of stabilising underground below roads and buildings - involves column excavation replaced by geo-textile load-bearing casing for dewatering and compacting in-situ with resultant ground load absorption
DE19609914C2 (en) * 1996-03-14 2001-10-18 Internat Intec Patent Holding Injection anchor
DE19735457C2 (en) * 1997-08-16 2002-07-18 Int Intec Patent Holding Injection or grouting body
DE10163237A1 (en) * 2001-12-21 2003-07-10 Franki Grundbau Gmbh To place load-bearing piles in the ground, a tubular body with a closing point is shrouded by a geo-textile fabric, and driven into the ground, to be filled with a granular material and withdrawn leaving the compressed material as a pile
DE102007030697A1 (en) * 2007-06-30 2009-01-08 Stump Spezialtiefbau Gmbh Method for sealing opening, particularly opening in sheet piling, involves pushing dimensionally stable rigid tube body on element through opening such that element is surrounded on all sides by cross section of tube body in area of opening

Families Citing this family (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3146649A1 (en) * 1981-11-25 1983-06-01 International Intec Co. Establishment, Vaduz "INJECTION ANCHOR TO BE INSERTED INTO PRE-DRILLED HOLES"
DE3210766A1 (en) * 1982-03-24 1983-09-29 International Intec Co. Establishment, Vaduz INJECTION ANCHOR TO BE INSERTED INTO PRE-DRILLED HOLES
US4790114A (en) * 1986-06-30 1988-12-13 Falco Gene A Masonry anchor
US6837018B1 (en) 2003-06-10 2005-01-04 Simpson Strong-Tie Company, Inc. Connection and method for setting a composite anchor with an apertured screen in a substrate
SE527424C2 (en) * 2004-07-08 2006-02-28 Atlas Copco Rocktech Ab Device and method for grouting and fixing reinforcing and / or anchoring elements in rock wall
DE102005005227A1 (en) * 2005-02-03 2006-08-10 International Intec Patent Holding Ets. Injection anchor or injection body for the transmission of mechanical stresses in buildings in civil engineering
GB0611548D0 (en) * 2006-06-12 2006-07-19 Cintec Int Ltd Method of reinforcing a structure and apparatus therefor
GB0906125D0 (en) * 2009-04-08 2009-05-20 Cintec Int Ltd Method of reinforcing a structure and apparatus therefor
DE102011078696A1 (en) * 2011-07-05 2013-01-10 Smp Swiss Macro Polymers Ag Assembly of fabric sleeve and curing material for securing an anchoring element in a borehole
CN102720196B (en) * 2012-06-26 2014-06-25 浙江省交通规划设计研究院 Anticorrosive anchor rod capable of preventing slurry from leaking
CN102926775B (en) * 2012-11-23 2015-06-17 平顶山市安泰华矿用安全设备制造有限公司 Grouting reinforcement device for anchor rod
CN103603683B (en) * 2013-12-03 2016-12-07 河南理工大学 Pocket type slip casting anchoring process
CN104674807A (en) * 2015-02-10 2015-06-03 成都绿迪科技有限公司 Bearing head for anchor rod
CN108252302B (en) * 2018-01-10 2020-02-14 重庆大学 Device capable of realizing visualization of stress state of anchor rod
DE202021000550U1 (en) 2021-02-13 2022-05-16 Gerolda Fulde Textile load-bearing element for introducing tensile or compressive forces into the subsoil, which is used for embankment protection, for anchoring protective structures against natural hazards and for general geotechnical applications and creates a direct force transmission with the subsoil
DE102022118798A1 (en) 2022-07-27 2024-02-15 Huesker Synthetic Gmbh Deformable foundation formwork for creating an underground foundation

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3726191A1 (en) * 1986-08-13 1988-02-25 Vsl Int Ag Device for sealing the intermediate space between a central tube and an outer casing, and use of the same
DE3844417A1 (en) * 1988-12-30 1990-07-05 Tgb Technogrundbau Gmbh Method of producing a grouted anchor which can be retightened and has permanent corrosion protection, and grouted anchor produced by this method
DE4408173A1 (en) * 1994-03-10 1995-09-14 Moebius Josef Bau Ground stabilisation method for road=building and other earthworks
DE19518830A1 (en) * 1994-03-10 1996-11-28 Moebius Josef Bau Method of stabilising underground below roads and buildings - involves column excavation replaced by geo-textile load-bearing casing for dewatering and compacting in-situ with resultant ground load absorption
DE4408173C2 (en) * 1994-03-10 2002-04-18 Moebius Josef Bau Process for stabilizing the subsoil and for removing structural and traffic loads
DE19518830B4 (en) * 1994-03-10 2005-02-24 Josef Möbius Bau-Gesellschaft (GmbH & Co.) Method of stabilising underground below roads and buildings - involves column excavation replaced by geo-textile load-bearing casing for dewatering and compacting in-situ with resultant ground load absorption
DE4408173C5 (en) * 1994-03-10 2006-04-27 Josef Möbius Bau-Gesellschaft (GmbH & Co.) Method of stabilizing the substrate and removing structural and traffic loads
DE19609914C2 (en) * 1996-03-14 2001-10-18 Internat Intec Patent Holding Injection anchor
DE19735457C2 (en) * 1997-08-16 2002-07-18 Int Intec Patent Holding Injection or grouting body
DE10163237A1 (en) * 2001-12-21 2003-07-10 Franki Grundbau Gmbh To place load-bearing piles in the ground, a tubular body with a closing point is shrouded by a geo-textile fabric, and driven into the ground, to be filled with a granular material and withdrawn leaving the compressed material as a pile
DE102007030697A1 (en) * 2007-06-30 2009-01-08 Stump Spezialtiefbau Gmbh Method for sealing opening, particularly opening in sheet piling, involves pushing dimensionally stable rigid tube body on element through opening such that element is surrounded on all sides by cross section of tube body in area of opening
DE102007030697B4 (en) * 2007-06-30 2014-04-03 Stump Spezialtiefbau Gmbh Method and arrangement for sealing an opening in the form of a hole in a sheet pile wall

Also Published As

Publication number Publication date
ATA66480A (en) 1987-02-15
DE2926155A1 (en) 1980-08-28
BE881817A (en) 1980-06-16

Similar Documents

Publication Publication Date Title
CH635885A5 (en) Anchorage for structural members in soil or in rock and method of producing this anchorage
DE1759338C3 (en) Method for producing a grout anchor and device for carrying out the method
DE60010751T2 (en) SLOPE STABILIZATION FUNDS
CH657402A5 (en) CORROSION-PROTECTED TENSIONABLE PRESSURE ANCHOR.
DE2523988A1 (en) ANCHORING DEVICE FOR ANCHORING WALLS SUCH AS SCHOTTWAENDE, SCHUTZWAENDE O.DGL.
DE3100730A1 (en) Method of supporting and/or stabilising excavation walls in civil engineering, mining and tunnelling, apparatus for carrying out the method, and stabilising anchor sitting in a borehole in the excavation wall
EP0976873B1 (en) Injection- or prestressed ground anchor
DE2606095B1 (en) REMOVABLE INJECTOR ANCHOR WITH DESTRUCTIBLE ANCHOR BODY
EP0244353B1 (en) Method for manufacturing a recoverable tension member
DE2300943A1 (en) WIRE CABLE ANCHORING
DE2365445A1 (en) METHOD OF MANUFACTURING SANDDRAENS
DE3204417C2 (en) Arrangement for setting a rock nail
DE3630969C2 (en)
DE102008018382A1 (en) Method for securing retaining walls
EP2829661B1 (en) Ground and rock anchor
DE3726191C2 (en)
DE3838880C1 (en) Method of producing a grouted anchor, and grouted anchor for carrying out the method
DE1759561C3 (en) Method for producing grouting anchors and device for carrying out the method
EP0350454B1 (en) Process for making a tension member adapted to be anchored in the ground
DE1904371A1 (en) Method for producing a tie rod for anchoring components in the ground and injection anchors, in particular for carrying out the method
DE2449289C3 (en) Grouting anchor
DE29712094U1 (en) Grout anchor
AT385553B (en) Foundation which is anchored in the ground and is intended for fastening structural parts, in particular uprights, masts or the like
DE2037061C3 (en) Device for producing a prestressed grouting anchor
DE3035060C2 (en) Process for producing a temporarily watertight construction pit enclosure and device for carrying out the process

Legal Events

Date Code Title Description
PL Patent ceased
PL Patent ceased