Carolin, 2014 - Google Patents
Comparative Assessment of Environmental Impacts Associated with the Decommissioning of Fixed Offshore PlatformsCarolin, 2014
View PDF- Document ID
- 3720077219037869345
- Author
- Carolin G
- Publication year
External Links
Snippet
In the upcoming years, the number of offshore oil and gas installations, which have to be decommissioned, is going to increase around the world, as they approach the end of their productive lifetime. Decommissioning carries risks and safety problems beside ecological …
- 230000000052 comparative effect 0 title description 9
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B41/00—Equipment or details not covered by groups E21B15/00 - E21B40/00
- E21B41/005—Waste disposal systems
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/01—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells specially adapted for obtaining from underwater installations
- E21B43/017—Production satellite stations, i.e. underwater installations comprising a plurality of satellite well heads connected to a central station
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0639—Performance analysis
- G06Q10/06393—Score-carding, benchmarking or key performance indicator [KPI] analysis
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Chandler et al. | Engineering and legal considerations for decommissioning of offshore oil and gas infrastructure in Australia | |
Lakhal et al. | An “Olympic” framework for a green decommissioning of an offshore oil platform | |
Kaiser | The Louisiana artificial reef program | |
Day et al. | Decommissioning of offshore oil and gas installations | |
Kaiser | Offshore service industry and logistics modeling in the Gulf of Mexico | |
Kaiser | Offshore decommissioning cost estimation in the Gulf of Mexico | |
Gorman et al. | Decommissioning offshore structures | |
Council | Arctic offshore oil and gas guidelines | |
Nicolosi et al. | Decommissioning of Offshore Oil and Gas Installations in Campos Basin-Brazil: Main Challenges and Achievements | |
Byrd et al. | The challenges facing the industry in offshore facility decommissioning on the California Coast | |
Lang et al. | Big Data-Based Decision Support Systems | |
Carolin | Comparative Assessment of Environmental Impacts Associated with the Decommissioning of Fixed Offshore Platforms | |
Amy Ngu | LCA for Offshore Installations Decommissioning: Environmental Impact Assessment | |
Boondao | Cost effective decommissioning liability solutions for offshore structures | |
Ruivo et al. | Decommissioning offshore oil and gas fields | |
Omar | Environmental Impacts Assessment Associated with the Decommissioning of Fixed Offshore Platforms Using Life Cycle Analysis | |
Smith et al. | Estimated air emissions savings from partially removing and reefing the jacket of a large California oil and gas platform | |
Terpou | Applying circular economy principles in the oil & gas industry-An LCA study of the decommissioning process of offshore platforms | |
Tung | An Exploration of Stakeholder Impacts on the Decommissioning of Offshore Oil and Gas Facilities–The Design, Development, and Analysis of Stakeholder Oriented Critical Paths for United Kingdom and Australia | |
Trowbridge et al. | California Floating Offshore Wind Regional Ports Assessment. US Department of the Interior, Bureau of Ocean Energy Management. 61 p. Report No.: OCS Study BOEM 2023-010 | |
Olesen | Offshore Supply Industry Dynamics: The Main Drivers in the Energy Sector and the Value Chain Characteristics for Offshore Oi and Gas and Offshore Wind l | |
Meenan | Technical aspects of decommissioning offshore structures | |
Zhu et al. | Beaching | |
Liu | Block Erection Technology | |
Zhou | Bucket Foundations |