Mason et al., 2013 - Google Patents
New real-time casing running advisory system reduces NPTMason et al., 2013
- Document ID
- 363641342924495702
- Author
- Mason C
- Igland J
- Streeter E
- Andresen P
- Publication year
- Publication venue
- SPE Offshore Europe Conference and Exhibition
External Links
Snippet
Casing, liner and completion running operations are key activities during the well construction process. Failure to reach the required setting depth may have a significant impact on well economics due to additional construction costs, deferred production and lost …
- 238000000034 method 0 abstract description 21
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/02—Surface sealing or packing
- E21B33/03—Well heads; Setting-up thereof
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B44/00—Automatic control systems specially adapted for drilling operations, i.e. self-operating systems which function to carry out or modify a drilling operation without intervention of a human operator, e.g. computer-controlled drilling systems; Systems specially adapted for monitoring a plurality of drilling variables or conditions
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/12—Means for transmitting measuring-signals or control signals from the well to the surface or from the surface to the well, e.g. for logging while drilling
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/14—Obtaining from a multiple-zone well
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/02—Subsoil filtering
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/01—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells specially adapted for obtaining from underwater installations
- E21B43/017—Production satellite stations, i.e. underwater installations comprising a plurality of satellite well heads connected to a central station
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F17/00—Digital computing or data processing equipment or methods, specially adapted for specific functions
- G06F17/30—Information retrieval; Database structures therefor; File system structures therefor
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B41/00—Equipment or details not covered by groups E21B15/00 - E21B40/00
- E21B41/0035—Apparatus or methods for multilateral well technology, e.g. for the completion of or workover on wells with one or more lateral branches
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F17/00—Digital computing or data processing equipment or methods, specially adapted for specific functions
- G06F17/50—Computer-aided design
- G06F17/5086—Mechanical design, e.g. parametric or variational design
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation, e.g. computer aided management of electronic mail or groupware; Time management, e.g. calendars, reminders, meetings or time accounting
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B17/00—Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F3/00—Input arrangements for transferring data to be processed into a form capable of being handled by the computer; Output arrangements for transferring data from processing unit to output unit, e.g. interface arrangements
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US10301923B2 (en) | System and console for monitoring and managing well site drilling operations | |
US20240352839A1 (en) | Oilfield system | |
CA3014293C (en) | Parameter based roadmap generation for downhole operations | |
Pink et al. | Building an automated drilling system where surface machines are controlled by downhole and surface data to optimize the well construction process | |
CA2841204C (en) | Mobile workflow orchestration and job execution for hydrocarbon recovery operations | |
CN105474049A (en) | Well activity bar charts | |
Valisevich et al. | Drillbit optimization system: real-time approach to enhance rate of penetration and bit wear monitoring | |
Nygård et al. | Improved drilling operations with wired drill pipe and along-string measurements–learnings and highlights from multiple north sea deployments | |
Israel et al. | Well Advisor-Integrating Real-time Data With Predictive Tools, Processes and Expertise to Enable More Informed Operational Decisions | |
Mason et al. | New real-time casing running advisory system reduces NPT | |
Arévalo et al. | Monitoring hole-cleaning during drilling operations: Case studies with a real-time transient model | |
EP3294985B1 (en) | Timeline visualization of events for monitoring well site drilling operations | |
Cayeux et al. | Real-Time Optimization of the Drilling Process—Challenges in Industrialization | |
Karpov et al. | Drilling performance and data quality control with live digital twin | |
Cao et al. | Digital transformation strategy enables automated real-time torque-and-drag modeling | |
Kucs et al. | Automated Real-Time Hookload and Torque Monitoring | |
Sadlier et al. | Automated alarms for Managing drilling pressure and maintaining wellbore stability—new concepts in while-drilling decision making | |
Cao et al. | Drilling Advisory Automation with Digital Twin and AI Technologies | |
Rosli et al. | Closed-Loop Data Analytics for Wells Construction Management in Real Time Centre | |
Khudiri et al. | Saudi Aramco RTOC, Collaborative, Safe and Effective Delivery of Wells from Start to Finish | |
McLaren et al. | Improving the Value of Real-Time Drilling Data to Aid Collaboration, Drilling Optimization, and Decision Making | |
Kuhlman et al. | Optimizing Drillouts Using Live TFA | |
Niedermayr et al. | Case Study--Field Implementation of Automated Torque-and-Drag Monitoring for Maari Field Development | |
Karpov et al. | Smart RTOC: Pioneering Precision in Oil & Gas with Dynamic Digital Twins | |
Kirby et al. | Filling the experience gap in the drilling optimization continuous improvement cycle through a self-learning expert system |