Kumar, 2020 - Google Patents
Conditional analysis of Phase II exponential chart for monitoring times to an eventKumar, 2020
- Document ID
- 3328979320998051830
- Author
- Kumar N
- Publication year
- Publication venue
- Quality Technology & Quantitative Management
External Links
Snippet
It is now well known that the error in estimating parameter (s) adversely affects the performance of control charts. The charts with estimated control limits are usually assessed by some of characteristics of unconditional run length (URL) distribution. However, it is now …
- 230000003750 conditioning 0 abstract description 5
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F17/00—Digital computing or data processing equipment or methods, specially adapted for specific functions
- G06F17/10—Complex mathematical operations
- G06F17/18—Complex mathematical operations for evaluating statistical data, e.g. average values, frequency distributions, probability functions, regression analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F17/00—Digital computing or data processing equipment or methods, specially adapted for specific functions
- G06F17/50—Computer-aided design
- G06F17/5009—Computer-aided design using simulation
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation, e.g. computer aided management of electronic mail or groupware; Time management, e.g. calendars, reminders, meetings or time accounting
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for a specific business sector, e.g. utilities or tourism
- G06Q50/01—Social networking
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F17/00—Digital computing or data processing equipment or methods, specially adapted for specific functions
- G06F17/30—Information retrieval; Database structures therefor; File system structures therefor
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F17/00—Digital computing or data processing equipment or methods, specially adapted for specific functions
- G06F17/20—Handling natural language data
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06N—COMPUTER SYSTEMS BASED ON SPECIFIC COMPUTATIONAL MODELS
- G06N99/00—Subject matter not provided for in other groups of this subclass
- G06N99/005—Learning machines, i.e. computer in which a programme is changed according to experience gained by the machine itself during a complete run
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Kumar | Conditional analysis of Phase II exponential chart for monitoring times to an event | |
Ainur et al. | Sample size and non-normality effects on goodness of fit measures in structural equation models. | |
Szarka III et al. | A review and perspective on surveillance of Bernoulli processes | |
Tran et al. | Monitoring the ratio of two normal variables using EWMA type control charts | |
Chakraborti | Parameter estimation and design considerations in prospective applications of the X chart | |
Keefe et al. | The conditional in-control performance of self-starting control charts | |
Shu et al. | Effects of estimation errors on cause-selecting charts | |
Kumar et al. | Design and implementation of q th quantile‐unbiased tr‐chart for monitoring times between events | |
Ali et al. | High quality process monitoring using a class of inter-arrival time distributions of the renewal process | |
Ahmed et al. | A robust alternate to the HEWMA control chart under non-normality | |
Aslam et al. | A HEWMA-CUSUM control chart for the Weibull distribution | |
Asadzadeh et al. | Robust AFT-based monitoring procedures for reliability data | |
Park | Weibullness test and parameter estimation of the three-parameter Weibull model using the sample correlation coefficient | |
Almarashi et al. | [Retracted] Process Monitoring for Gamma Distributed Product under Neutrosophic Statistics Using Resampling Scheme | |
Alevizakos et al. | The quadruple exponentially weighted moving average control chart | |
Aslam et al. | Monitoring circuit boards products in the presence of indeterminacy | |
Amiri et al. | Monitoring two-stage processes with binomial data using generalized linear model-based control charts | |
Riaz et al. | Effect of measurement error on joint monitoring of process mean and coefficient of variation | |
Aslam et al. | Monitoring process mean using generally weighted moving average chart for exponentially distributed characteristics | |
Huh et al. | Monitoring parameter shift with Poisson integer-valued GARCH models | |
Anojahatlo et al. | Enhancing the detection power of multivariate time between events control charts for Gumbel’s bivariate exponential distribution | |
Sanaullah et al. | EWMA control charts based on robust estimators: A powerful tool for monitoring a process with a non-normal distribution | |
Lee et al. | Monitoring parameter change for time series models with application to location-scale heteroscedastic models | |
Noor-ul-Amin et al. | Joint monitoring of mean and variance using Max-EWMA for Weibull process | |
Li et al. | On the performance of two‐sided control charts for short production runs |