Xing et al., 2012 - Google Patents
Dispatch problem of automated guided vehicles for serving tandem lift quay craneXing et al., 2012
View PDF- Document ID
- 3029217343352462423
- Author
- Xing Y
- Yin K
- Quadrifoglio L
- Wang B
- Publication year
- Publication venue
- Transportation research record
External Links
Snippet
New quay cranes (QCs) have been designed to increase terminal productivity by lifting more containers simultaneously. But QC productivity relies on efficient cooperation with the vehicles carrying the containers. This paper investigates the synchronization scheduling …
- 238000011160 research 0 description 17
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0631—Resource planning, allocation or scheduling for a business operation
- G06Q10/06316—Sequencing of tasks or work
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0631—Resource planning, allocation or scheduling for a business operation
- G06Q10/06312—Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Programme-control systems
- G05B19/02—Programme-control systems electric
- G05B19/418—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM]
- G05B19/41865—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM] characterised by job scheduling, process planning, material flow
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation, e.g. linear programming, "travelling salesman problem" or "cutting stock problem"
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/08—Logistics, e.g. warehousing, loading, distribution or shipping; Inventory or stock management, e.g. order filling, procurement or balancing against orders
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Programme-control systems
- G05B19/02—Programme-control systems electric
- G05B19/418—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM]
- G05B19/4189—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM] characterised by the transport system
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B2219/00—Program-control systems
- G05B2219/30—Nc systems
- G05B2219/50—Machine tool, machine tool null till machine tool work handling
- G05B2219/50109—Soft approach, engage, retract, escape, withdraw path for tool to workpiece
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B2219/00—Program-control systems
- G05B2219/30—Nc systems
- G05B2219/32—Operator till task planning
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Kim et al. | A look-ahead dispatching method for automated guided vehicles in automated port container terminals | |
Bish et al. | Dispatching vehicles in a mega container terminal | |
Roy et al. | Modeling and design of container terminal operations | |
Vivaldini et al. | Integrated tasks assignment and routing for the estimation of the optimal number of AGVS | |
Xing et al. | Dispatch problem of automated guided vehicles for serving tandem lift quay crane | |
Guo et al. | Dynamic yard crane dispatching in container terminals with predicted vehicle arrival information | |
CN111882215B (en) | Personalized customization flexible job shop scheduling method containing AGV | |
CN110239868A (en) | Picking method for allocating tasks and its kinds of goods sorting system | |
Yue et al. | Dynamic scheduling and path planning of automated guided vehicles in automatic container terminal | |
Dotoli et al. | A decision support system for optimizing operations at intermodal railroad terminals | |
Kulak et al. | Strategies for improving a long-established terminal’s performance: a simulation study of a Turkish container terminal | |
Sharif et al. | Yard crane scheduling at container terminals: A comparative study of centralized and decentralized approaches | |
KR100297095B1 (en) | Simulation method in designing of container terminal | |
Gerrits et al. | A simulation model for the planning and control of AGVs at automated container terminals | |
Kronmueller et al. | On-demand grocery delivery from multiple local stores with autonomous robots | |
Jiao et al. | Online joint optimization of pick order assignment and pick pod selection in robotic mobile fulfillment systems | |
Pjevčević et al. | Application of DEA to the analysis of AGV fleet operations in a port container terminal | |
Kim | Models and methods for operations in port container terminals | |
Choe et al. | Queue-based local scheduling and global coordination for real-time operation control in a container terminal | |
Tanchoco et al. | Real-time control strategies for multiple-load AGVs | |
Ahmed et al. | Improving productivity of yard trucks in port container terminal using computer simulation | |
Tsai et al. | A network model for solving the yard truck routing and scheduling problem | |
Razouk et al. | Adapted Bin-Packing algorithm for the yard optimization problem | |
CN116451888A (en) | Multi-AVG-based flexible production workshop collaborative scheduling method | |
JP2022091599A (en) | Bottleneck visualization device and bottleneck visualization method |