Muryanto, 2005 - Google Patents
Through Tubing Sand Control With Vent ScreenMuryanto, 2005
- Document ID
- 2661775621112353744
- Author
- Muryanto B
- Publication year
External Links
Snippet
Following excessive sand production from the HB-1 Well in the Bekapai Field, the oil production from the central panel of the main zone was stopped. A costeffective sand control solution was needed to reproduce that zone since Bekapai field is a mature field with …
- 239000004576 sand 0 title abstract description 40
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/25—Methods for stimulating production
- E21B43/26—Methods for stimulating production by forming crevices or fractures
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/02—Subsoil filtering
- E21B43/04—Gravelling of wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/10—Sealing or packing boreholes or wells in the borehole
- E21B33/13—Methods or devices for cementing, for plugging holes, crevices, or the like
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/02—Subsoil filtering
- E21B43/10—Setting of casings, screens, liners or the like in wells
- E21B43/103—Setting of casings, screens, liners or the like in wells of expandable casings, screens, liners, or the like
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/16—Enhanced recovery methods for obtaining hydrocarbons
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/12—Methods or apparatus for controlling the flow of the obtained fluid to or in wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B21/00—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
- E21B21/08—Controlling or monitoring pressure or flow of drilling fluid, e.g. automatic filling of boreholes, automatic control of bottom pressure
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B37/00—Methods or apparatus for cleaning boreholes or wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B17/00—Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B41/00—Equipment or details not covered by groups E21B15/00 - E21B40/00
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
-
- C—CHEMISTRY; METALLURGY
- C09—DYES; PAINTS; POLISHES; NATURAL RESINS; ADHESIVES; MISCELLANEOUS COMPOSITIONS; MISCELLANEOUS APPLICATIONS OF MATERIALS
- C09K—MATERIALS FOR MISCELLANEOUS APPLICATIONS, NOT PROVIDED FOR ELSEWHERE
- C09K8/00—Compositions for drilling of boreholes or wells; Compositions for treating boreholes or wells, e.g. for completion or for remedial operations
- C09K8/56—Compositions for consolidating loose sand or the like around wells without excessively decreasing the permeability thereof
-
- C—CHEMISTRY; METALLURGY
- C09—DYES; PAINTS; POLISHES; NATURAL RESINS; ADHESIVES; MISCELLANEOUS COMPOSITIONS; MISCELLANEOUS APPLICATIONS OF MATERIALS
- C09K—MATERIALS FOR MISCELLANEOUS APPLICATIONS, NOT PROVIDED FOR ELSEWHERE
- C09K8/00—Compositions for drilling of boreholes or wells; Compositions for treating boreholes or wells, e.g. for completion or for remedial operations
- C09K8/50—Compositions for plastering borehole walls, i.e. compositions for temporary consolidation of borehole walls
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US4627496A (en) | Squeeze cement method using coiled tubing | |
US7237612B2 (en) | Methods of initiating a fracture tip screenout | |
US7559373B2 (en) | Process for fracturing a subterranean formation | |
US6601648B2 (en) | Well completion method | |
Peirce et al. | An overview of conformance control efforts for the West Sak Field on the North Slope of Alaska | |
US5474129A (en) | Cavity induced stimulation of coal degasification wells using foam | |
Azevedo et al. | Challenges faced to execute hydraulic fracturing in Brazilian pre-salt wells | |
Al-Saeed et al. | Successful Field Applications of Installing and Activating High Pressure/Temperature Multi-Stage Completion for Improving Well Performance in Deep North Kuwait Jurassic Formation | |
US4090564A (en) | Method for increasing the recovery of oil and gas from a water invaded geo-pressured water drive oil reservoir | |
Ali et al. | High-Productivity Horizontal Gravel Packs | |
CA2517497C (en) | Well product recovery process | |
Muryanto | Through Tubing Sand Control With Vent Screen | |
Abdel-Basset et al. | Chemical and mechanical water shut-off in horizontal passive icd wells; experience and lessons learnt in giant darcy reservoir | |
Svendsen et al. | Stimulation of high-rate gravel-packed oil wells damaged by clay and fines migration: a case study, Gullfaks Field, North Sea | |
Restarick et al. | Through-tubing sand-control techniques reduce completion costs | |
Edment et al. | Improvements in horizontal gravel packing | |
Lee et al. | Effective thru tubing gravel pack methods in Attaka field | |
Koshy et al. | Innovative Well Intervention Techniques to Sustain Production in Mature Offshore Fields | |
US20120273200A1 (en) | Methods for treating a wellbore | |
Kamps et al. | Improving Well Productivity through Openhole Frac-Pack Completion Design | |
Marindha et al. | Successful Complex Thru Tubing Cementing and Sand Consolidation Operation in BL-x Mahakam, East Kalimantan, Indonesia | |
Patil et al. | Frac Pack: Reviving and Maximising Production Potential in Cambay Offshore Field | |
Poitrenaud et al. | Remedial Sand-Control in Mature Field: Results & Lessons Learnt from Through-Tubing Sand Screens Operations in the Gulf of Guinea | |
Pradipta et al. | Thru Tubing Fracturing Experience in Tight Sand Reservoir, Offshore North West Java | |
Bell Jr et al. | Achieving high-rate completions with innovative through-tubing sand control |