Evans et al., 1993 - Google Patents
The Denver airport: Managing a megaprojectEvans et al., 1993
- Document ID
- 2325853813365131754
- Author
- Evans G
- Haury R
- Stricklin G
- Publication year
- Publication venue
- Civil Engineering
External Links
Snippet
Despite extensive changes in the planned opening design, a streamlined command structure helped organize the legions of people and equipment required during the development of the Denver International Airport, keeping the $2.7 billion project on a fast …
- 238000010276 construction 0 description 17
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C1/00—Design or layout of roads, e.g. for noise abatement, for gas absorption
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Evans et al. | The Denver airport: Managing a megaproject | |
Rapp et al. | Construction Site Planning and Logistical Operations: Site-Focused Management for Builders | |
Pillar et al. | Case Study of the New DFW International Airport APM | |
Solis et al. | Design and construction of the world's largest airport people mover project | |
Nolan | Great Western railway electrification, UK: the key role of building information modelling | |
Andersen et al. | Creating new flexibility at Bergen Airport | |
Solis et al. | Managing the Design and Construction of the World's Largest Airport People Mover Project | |
Kulakov et al. | Stage-by-stage construction approach in developing railway station complexes | |
Thomson et al. | HONG KONG INTERNATIONAL AIRPORTS-CONSTRUCTION. | |
Verrall | B5. Terminal planning at Washington Dulles International Airport using computer simulation | |
Oakervee | The planning, design and construction parameters of Hong Kong's new airport | |
Skopintsev et al. | Transport Interchange Complex Model Evolution Within the Formation Concept Framework of the Aeropolis | |
Finnegan | Airport Parking Construction Presents a Host of Challenges | |
Fulton | City of Avon Lake | |
Manoj et al. | Design interface management of airport projects | |
Solis et al. | Zero to Sixty: Managing the Design, Construction and Implementation of the World's Largest Airport Automated People Mover | |
Schmeits | Case study assessment of 3D and 4D modeling techniques for early constructabilty review of transportation projects | |
Corey | A revolutionary automated people mover: Overcoming numerous constraints at DFW | |
Corey | DFW APM—Innovative solutions to success | |
Roberts | Wellington airport: The city council's responsibilities | |
Braswell | USA Banner | |
Briscoe | Multi-Modal Modelling: BIM Template for Hub Connectivity and Networks | |
Baskir | The Evolution of the Planner's Role During the Course of a Capital Improvement Program | |
McNeal et al. | The Importance of Construction Phasing and Flexibility at Operating Terminals-Port Newark Container Terminal Case Study | |
Hadjihambi et al. | Funding first for Athens' new Olympic airport |