Piaszczyk, 1998 - Google Patents
Operational experiences at existing accelerator facilitiesPiaszczyk, 1998
View PDF- Document ID
- 189117974625704205
- Author
- Piaszczyk C
- Publication year
- Publication venue
- Workshop on Utilisation and Reliability of High Power Proton Accelerators, Mito
External Links
- 150000002500 ions 0 abstract description 11
Classifications
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B2219/00—Program-control systems
- G05B2219/30—Nc systems
- G05B2219/32—Operator till task planning
- G05B2219/32234—Maintenance planning
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B23/00—Testing or monitoring of control systems or parts thereof
- G05B23/02—Electric testing or monitoring
- G05B23/0205—Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults
- G05B23/0259—Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults characterized by the response to fault detection
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B23/00—Testing or monitoring of control systems or parts thereof
- G05B23/02—Electric testing or monitoring
- G05B23/0205—Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults
- G05B23/0218—Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults characterised by the fault detection method dealing with either existing or incipient faults
- G05B23/0224—Process history based detection method, e.g. whereby history implies the availability of large amounts of data
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Programme-control systems
- G05B19/02—Programme-control systems electric
- G05B19/418—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM]
- G05B19/41875—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM] characterised by quality surveillance of production
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP2210560B1 (en) | A system and method to manage maintenance of a radiological imaging system | |
Torell et al. | Mean time between failure: Explanation and standards | |
Authen et al. | Reliability analysis of digital systems in a probabilistic risk analysis for nuclear power plants | |
Eriksson et al. | Reliability assessment of the LANSCE accelerator system | |
Yang et al. | Online application of a risk management system for risk assessment and monitoring at NPPs | |
Apollonio | Machine protection: Availability for particle accelerators | |
Piaszczyk | Operational experiences at existing accelerator facilities | |
Burgazzi et al. | Reliability studies of a high-power proton accelerator for accelerator-driven system applications for nuclear waste transmutation | |
Brunton et al. | Control and information systems for the national ignition facility | |
Himel et al. | Availability and reliability issues for ILC | |
CN108791954A (en) | A kind of fault early warning method based on the in-orbit interior charged effect dynamic base table of spacecraft | |
Ravinder | Experience in asset performance management analytics for decision support on Transmission & Distribution Assets | |
Schramm | Dependable system development methodology and case study for the LHC beam loss monitoring system at CERN | |
Brown et al. | The development of a methodology to allocate RAMI requirements to DEMO: The development of design tools & methodologies for DEMO in Europe | |
Buende | Reliability and availability issues in NET | |
Lessner et al. | Reliability and Availability Studies in the RIA Driver Linac | |
Goerdin et al. | Application of Monte Carlo simulation to support risk-based decision making in MV distribution networks | |
Hurst et al. | Repairable System Analysis of the Radioactive Ventilation Gas Monitors at CERN from Field Data | |
Nordt et al. | Machine Protection and Activation | |
Piaszczyk | Accelerator as a repairable system | |
Yang et al. | A risk-based framework for operational task analysis at nuclear power plants | |
Park et al. | An Empirical Approach to the Relationship between Performance Shaping Factors and Operator Performances in Nuclear Power Plants | |
Tallerico | Development of a RAMI model for LANSCE and high power APT accelerators | |
Selvaraju et al. | Reliability, Availability and Maintanability Study of A Power Generation Plant | |
Anderson et al. | R&M theory and fundamental concepts |