Nothing Special   »   [go: up one dir, main page]

Rodrigues et al., 2020 - Google Patents

A spare parts inventory control model based on Prognostics and Health monitoring data under a fill rate constraint

Rodrigues et al., 2020

Document ID
18165026999993433610
Author
Rodrigues L
Yoneyama T
Publication year
Publication venue
Computers & Industrial Engineering

External Links

Snippet

The performance of any inventory control model depends on the quality of future demand forecasting. The better the accuracy of future demand predictions is, the lower is the safety inventory level needed to fulfill demands and meet fill rate requirements. In most real-world …
Continue reading at www.sciencedirect.com (other versions)

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
    • G06Q10/063Operations research or analysis
    • G06Q10/0631Resource planning, allocation or scheduling for a business operation
    • G06Q10/06312Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
    • G06Q10/063Operations research or analysis
    • G06Q10/0631Resource planning, allocation or scheduling for a business operation
    • G06Q10/06315Needs-based resource requirements planning or analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
    • G06Q10/063Operations research or analysis
    • G06Q10/0639Performance analysis
    • G06Q10/06393Score-carding, benchmarking or key performance indicator [KPI] analysis
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B23/00Testing or monitoring of control systems or parts thereof
    • G05B23/02Electric testing or monitoring
    • G05B23/0205Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults
    • G05B23/0259Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults characterized by the response to fault detection
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B23/00Testing or monitoring of control systems or parts thereof
    • G05B23/02Electric testing or monitoring
    • G05B23/0205Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults
    • G05B23/0218Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults characterised by the fault detection method dealing with either existing or incipient faults
    • G05B23/0243Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults characterised by the fault detection method dealing with either existing or incipient faults model based detection method, e.g. first-principles knowledge model

Similar Documents

Publication Publication Date Title
Rodrigues et al. A spare parts inventory control model based on Prognostics and Health monitoring data under a fill rate constraint
Tian et al. Condition based maintenance optimization for multi-component systems using proportional hazards model
Shi et al. Real-time prediction of remaining useful life and preventive opportunistic maintenance strategy for multi-component systems considering stochastic dependence
CN101320455A (en) Spare Parts Requirement Forecasting Method Based on In-Service Life Evaluation
WO2019059321A1 (en) Planning device, method of creating operation planning, hydrogen manufacturing method, and program
Lam et al. A myopic policy for optimal inspection scheduling for condition based maintenance
US7020569B2 (en) Intelligent modelling of process and tool health
CA3132144A1 (en) Planning apparatus, controlling apparatus, method, and program
US20160314409A1 (en) Method and system for real time production optimization based on equipment life
JP6006072B2 (en) Energy consumption prediction system
CN117911012B (en) Equipment health management system based on equipment ecological detection and running state evaluation
EP3464806B1 (en) Method for well artificial lift lifecycle planning
KR20210014907A (en) Method for determining orders ranking of Raw Materials connecting Storage Administerating System
Uraikul et al. Development of an expert system for optimizing natural gas pipeline operations
Reza Golmakani et al. Age‐based inspection scheme for condition‐based maintenance
US20220373171A1 (en) Method and system for realtime monitoring and forecasting of fouling of air preheater equipment
Khoury et al. On the Use of Time‐Limited Information for Maintenance Decision Support: A Predictive Approach under Maintenance Constraints
JP5851259B2 (en) Water distribution operation control device
JP4906799B2 (en) Automatic operation control system
CN109740191A (en) Prediction technique, device and the equipment of wind sensor remaining life
CN117852806A (en) MES energy efficiency optimization method and system based on nonlinear wear model
Lin et al. Smart spare part inventory management system with sensor data updating
Van Horenbeek et al. A prognostic maintenance policy-effect on component lifetimes
CN109933890A (en) A kind of product comprehensive maintenance method and apparatus
US10642249B2 (en) Method and system for real-time damage prediction and quantification