Gibson, 2022 - Google Patents
Novel Frac Sleeve Technology Designed to Replace Plug N Perf and Improve Efficiencies While Significantly Reducing Time to Production and Environmental ImpactGibson, 2022
- Document ID
- 17161599897814514448
- Author
- Gibson C
- Publication year
- Publication venue
- Abu Dhabi International Petroleum Exhibition and Conference
External Links
Snippet
The paper aims to describe the design, testing/validation, applications, and field trial results of a 15K Multi-Stage Fracturing (MSF) Intervention-less sleeve system for use in single-point entry or multi-cluster design. Field proven results show efficiencies over plug n perf, coil …
- 238000004519 manufacturing process 0 title description 9
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/25—Methods for stimulating production
- E21B43/26—Methods for stimulating production by forming crevices or fractures
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/02—Subsoil filtering
- E21B43/10—Setting of casings, screens, liners or the like in wells
- E21B43/103—Setting of casings, screens, liners or the like in wells of expandable casings, screens, liners, or the like
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/10—Sealing or packing boreholes or wells in the borehole
- E21B33/13—Methods or devices for cementing, for plugging holes, crevices, or the like
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/02—Subsoil filtering
- E21B43/04—Gravelling of wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/02—Subsoil filtering
- E21B43/08—Screens or liners
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/14—Obtaining from a multiple-zone well
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/10—Sealing or packing boreholes or wells in the borehole
- E21B33/12—Packers; Plugs
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/10—Locating fluid leaks, intrusions or movements
- E21B47/1015—Locating fluid leaks, intrusions or movements using tracers: using radioactivity
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/16—Enhanced recovery methods for obtaining hydrocarbons
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/11—Perforators; Permeators
- E21B43/119—Details, e.g. for locating perforating place or direction
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/12—Methods or apparatus for controlling the flow of the obtained fluid to or in wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/02—Surface sealing or packing
- E21B33/03—Well heads; Setting-up thereof
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B34/00—Valve arrangements for boreholes or wells
- E21B34/06—Valve arrangements for boreholes or wells in wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B34/00—Valve arrangements for boreholes or wells
- E21B2034/007—Sleeve valves
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B21/00—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
- E21B21/08—Controlling or monitoring pressure or flow of drilling fluid, e.g. automatic filling of boreholes, automatic control of bottom pressure
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B37/00—Methods or apparatus for cleaning boreholes or wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B23/00—Apparatus for displacing, setting, locking, releasing, or removing tools, packers or the like in the boreholes or wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B17/00—Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B41/00—Equipment or details not covered by groups E21B15/00 - E21B40/00
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Cramer | Stimulating unconventional reservoirs: lessons learned, successful practices, areas for improvement | |
Weirich et al. | Frac-Packing: Best Practices and Lessons Learned from over 600 Operations | |
Weirich et al. | Frac packing: best practices and lessons learned from more than 600 operations | |
Soliman et al. | Impact of fracturing and fracturing techniques on productivity of unconventional formations | |
Pourciau et al. | Completion and well performance results, Genesis Field, deepwater Gulf of Mexico | |
Cadotte et al. | Unconventional multiplay evaluation of casing-in-casing refracturing treatments | |
Seale et al. | An effective horizontal well completion and stimulation system | |
Casero et al. | Open Hole Multi-Stage Completion System in Unconventional Plays: Efficiency, Effectiveness and Economics | |
Schnitzler et al. | 100th Intelligent Completion Installation: A Milestone in Brazilian Pre-Salt Development | |
Gibson | Novel Frac Sleeve Technology Designed to Replace Plug N Perf and Improve Efficiencies While Significantly Reducing Time to Production and Environmental Impact | |
Al-Saeed et al. | Successful Field Applications of Installing and Activating High Pressure/Temperature Multi-Stage Completion for Improving Well Performance in Deep North Kuwait Jurassic Formation | |
Rodoplu et al. | 15K Multistage Fracturing Completion System Addresses Operational Challenges, Improves Production Performance and Cost Savings in Openhole Environments | |
Burton | Unconventional Completions: Which One is Right for Your Application? | |
Burger et al. | Single-Trip Multiple-Zone Completion Technology Has Come of Age and Meets the Challenging Completion Needs of the Gulf of Mexico's Deepwater Lower Tertiary Play | |
Rodoplu et al. | 15K Multi-Entry Cemented Multi-Stage Fracturing System-Alternative Completion Method for Deep Tight Gas Wells | |
Madan et al. | Milestones, Lessons Learned and Best Practices in the designing, deployment and installation of ICDs in Saudi Arabia | |
Casero et al. | Multiple Transverse Fracturing in Horizontal Open Hole Allows Development of a Low-Permeability Reservoir in the Foukanda Field, Offshore Congo | |
Hari et al. | Improvements in Multistage Fracturing of Horizontal Wells Using a Newly Introduced Single Trip Coiled Tubing Conveyed Annular Perforating and Fracturing Tool-Benefits, Savings, and Case Histories | |
Rahim et al. | Evaluation and Selection of Stimulation Methods in Horizontal Gas Wells for Production Optimization Using Numerical Modeling of Well Performances | |
Kudrya et al. | Experience of 20 Plus Stage Fracture Stimulation in Samotlorskoye Field | |
Clarkson et al. | Evolution of Single-Trip Multiple-Zone Completion Technology: How State-of-the-Art New Developments Can Meet Today's Ultra Deepwater Needs | |
Rogers et al. | New equipment designs enable swellable technology in cementless completions | |
Ogier et al. | The World's Deepest Frac-Pack Completions Using a Single-Trip Multi-Zone System: A Gulf of Mexico Case Study in the Lower Tertiary Formation | |
Burton et al. | Multi-zone cased hole frac-packs and intelligent well systems improve recovery in subsea gas fields | |
Mazitov et al. | Successful CT Intervention for Re-Frac on Horizontal Oil Well After 2 Years of Production Completed with Full Bore Liner with Frac Ports Controlled by Shifting Tool |