Yao et al., 2021 - Google Patents
Key technique study of stability control of surrounding rock in deep chamber with large cross-section: A case study of the Zhangji Coal Mine in ChinaYao et al., 2021
- Document ID
- 16140128438814916025
- Author
- Yao W
- Pang J
- Zhang J
- Liu G
- Publication year
- Publication venue
- Geotechnical and Geological Engineering
External Links
Snippet
This paper is a case study on the key technique of stability control of surrounding rock in the deep chamber with large cross-section in Zhangji Coal Mine of China. Many investigations and field experiments were performed to reveal the surrounding rock failure mechanisms of …
- 239000011435 rock 0 title abstract description 100
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/08—Lining with building materials with preformed concrete slabs
- E21D11/083—Methods or devices for joining adjacent concrete segments
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/045—Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/38—Waterproofing; Heat insulating; Soundproofing; Electric insulating
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/14—Lining predominantly with metal
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F15/00—Methods or devices for placing filling-up materials in underground workings
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D15/00—Props; Chocks, e.g. made of flexible containers filled with backfilling material
- E21D15/48—Chocks or the like
- E21D15/483—Chocks or the like made of flexible containers, e.g. inflatable, with or without reinforcement, e.g. filled with water, backfilling material or the like
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D33/00—Testing foundations or foundation structures
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D3/00—Improving or preserving soil or rock, e.g. preserving permafrost soil
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Zhao et al. | Mechanism analysis and control technology of surrounding rock failure in deep soft rock roadway | |
Lai et al. | Characteristics of seismic disasters and aseismic measures of tunnels in Wenchuan earthquake | |
Kang | Support technologies for deep and complex roadways in underground coal mines: a review | |
Xu et al. | Investigation of key techniques on floor roadway support under the impacts of superimposed mining: theoretical analysis and field study | |
Xie et al. | Failure analysis and control technology of intersections of large-scale variable cross-section roadways in deep soft rock | |
Li et al. | Mechanical responses of closely spaced large span triple tunnels | |
Zhu et al. | Research on the “three shells” cooperative support technology of large-section chambers in deep mines | |
Yao et al. | Key technique study of stability control of surrounding rock in deep chamber with large cross-section: A case study of the Zhangji Coal Mine in China | |
Jiang et al. | Failure mechanism analysis and support design for deep composite soft rock roadway: a case study of the Yangcheng coal mine in China | |
Wu et al. | Failure mechanism and stability control of surrounding rock in mining roadway with gentle slope and close distance | |
Chen et al. | Characteristics and failure analysis of a railway tunnel collapse influenced by cavity in phyllite strata | |
Sun et al. | Highly prestressed NPR cable coupling support technology and its application in the deep roadway | |
Chu et al. | Mechanical response of inclined TBM tunnel due to drainage settlement of deep sandstone aquifer | |
Zhu et al. | Joint support technology and its engineering application to deep soft rock tunnel with strong creep | |
Chen et al. | Stability analysis and deformation control of tunnel with extremely weak surrounding rocks caused by strike-slip fault activity | |
Xie et al. | Research on the Control Technology and Key Parameters of External Anchor-Internal Unloading of Surrounding Rock During Gob-Side Entry Driving Under Severe Mining of 1000-m-Deep Mine | |
Huang et al. | Model experiment and support optimization analysis of primary support arch cover excavation of large-section metro station in sandy mudstone stratum | |
Du et al. | A case study of the failure mechanism analysis and support design of a tailrace tunnel in a weak fracture zone containing expansive minerals | |
Li et al. | Failure mechanisms and reinforcement support of soft rock roadway in deep extra-thick coal seam: A case study | |
Wang et al. | Application research on composite support technology of concrete-filled steel tube support in high stress and large deformation soft rock roadway: A case study | |
Cao et al. | Non-pillar mining of upper coal seam layers with double-roadway driving using a flexible-formwork pre-cast partition wall | |
Wu et al. | Research on Failure Characteristics and Zoning Control Technology of Thick‐Soft Surrounding Rock for Deep Gob‐Side Entry Retaining | |
Wang et al. | Research on Active Advanced Support Technology of Backfilling and Mining Face | |
Chen et al. | Modeling and simulation of deformation mechanism of soft rock roadway considering the mine water | |
Gou et al. | Navigating the depths: Experimental study on the influence of ground fissures on metro shield tunnels considering different intersection angles |