Patel et al., 2015 - Google Patents
Offshore Implementation Factors for Managed Pressure DrillingPatel et al., 2015
- Document ID
- 15651155072792484622
- Author
- Patel H
- Bruton J
- Publication year
- Publication venue
- SPE/IADC Managed Pressure Drilling and Underbalanced Operations Conference and Exhibition?
External Links
Snippet
Managed pressure drilling (MPD) has been used for more than a decade onshore to drill an increasing number of challenging wells. However, the offshore drilling industry has only recently begun to adopt this innovative drilling technique. This paper will address some of …
- 238000005553 drilling 0 title abstract description 97
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/02—Surface sealing or packing
- E21B33/03—Well heads; Setting-up thereof
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/02—Surface sealing or packing
- E21B33/08—Wipers; Oil savers
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B17/00—Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
- E21B17/02—Couplings; joints
- E21B17/04—Couplings; joints between rod or the like and bit or between rod and rod or the like
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B17/00—Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
- E21B17/02—Couplings; joints
- E21B17/08—Casing joints
- E21B17/085—Riser connections
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B21/00—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
- E21B21/08—Controlling or monitoring pressure or flow of drilling fluid, e.g. automatic filling of boreholes, automatic control of bottom pressure
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B21/00—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
- E21B21/10—Valve arrangements in drilling fluid circulation systems
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B34/00—Valve arrangements for boreholes or wells
- E21B34/06—Valve arrangements for boreholes or wells in wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B34/00—Valve arrangements for boreholes or wells
- E21B34/02—Valve arrangements for boreholes or wells in well heads
- E21B34/04—Valve arrangements for boreholes or wells in well heads in underwater well heads
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B21/00—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
- E21B21/06—Arrangements for treating drilling fluids outside the borehole
- E21B21/063—Arrangements for treating drilling fluids outside the borehole by separating components
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/01—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells specially adapted for obtaining from underwater installations
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B19/00—Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B41/00—Equipment or details not covered by groups E21B15/00 - E21B40/00
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B44/00—Automatic control systems specially adapted for drilling operations, i.e. self-operating systems which function to carry out or modify a drilling operation without intervention of a human operator, e.g. computer-controlled drilling systems; Systems specially adapted for monitoring a plurality of drilling variables or conditions
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Nas et al. | Offshore managed pressure drilling experiences in asia pacific | |
Cadd et al. | Integrating MPD into HPHT Well Planning | |
Solvang et al. | Managed pressure drilling resolves pressure depletion related problems in the development of the HPHT Kristin field | |
Hannegan et al. | Deepwater Drilling with Lightweight Fluids-Essential Equipment Required | |
Fernandes et al. | Overview of Different Applications for MPD and MCD Techniques on Deepwater Wells | |
Kozicz | Managed-Pressure Drilling–Recent Experience, Potential Efficiency Gains, and Future Opportunities | |
Pinkstone et al. | Using drill pipe connection continuous circulation technology on a geothermal drilling project in indonesia to reduce stuck pipe events | |
Toralde et al. | Riser gas risk mitigation with advanced flow detection and managed pressure drilling technologies in deepwater operations | |
Patel et al. | Offshore Implementation Factors for Managed Pressure Drilling | |
Moghazy et al. | The Challenges of Deploying an MPD System on a MODU to Drill Narrow Margin Shallow Horizontal Wells in DW GoM | |
Godhavn et al. | Development and First Use of Controlled Mud Level System in US Deepwater GoM | |
Kuroda et al. | Deepwater MPD Operation and Design Method | |
Johnson et al. | Augmenting deepwater well control with managed pressure drilling equipment | |
Thiago et al. | Bridging the gap between MPD and Well Control | |
Sammat et al. | Managed pressure drilling experience on deepwater application in West Africa | |
Kulikov et al. | " Secure Drilling" Services for Safe and Effective Drilling | |
Abd El-Meguid et al. | Underbalanced coiled tubing drilling: Delivering well production safely in high H2S and tight gas reservoirs, UAE | |
Kozicz et al. | Integrating Emerging Drilling Methods From Floating Drilling Rigs—Enabling Drilling Solutions for the Future | |
Godhavn et al. | How to apply controlled mud level systems in deep water drilling | |
Azancot et al. | Surface BOP-management system & design guidelines | |
Hammad et al. | New Automated MPD Riser System Allowed an Operator to Reduce Manual Working Hours in the Moonpool by 85% and Installation Time by 60% | |
Moghazy et al. | The Business Case for ABP MPD Use in Deepwater Gulf of Mexico | |
Umair et al. | Successful Application of Modified Diverter System to Drill Long Surface Hole-Provides Dynamic, Safer and Cost-Effective Solution | |
Mohammed et al. | MPD deployment for deepwater drilling operations–HSE & risk considerations and mitigation, rig configuration challenges and MPD equipment selection and standardization | |
Khan et al. | Underbalanced Coiled Tubing Drilling: Delivering Well Production Safely in High H2S and Tight Gas Reservoirs, UAE |