Nothing Special   »   [go: up one dir, main page]

Gopalakrishnan et al., 2014 - Google Patents

Simulation-based planning of maintenance activities by a shifting priority method

Gopalakrishnan et al., 2014

View PDF
Document ID
15526742620989351991
Author
Gopalakrishnan M
Skoogh A
Laroque C
Publication year
Publication venue
Proceedings of the Winter Simulation Conference 2014

External Links

Snippet

Machine failures are major causes of direct downtime as well as system losses (blocked and idle times) in production flows. A previous case study shows that prioritizing bottleneck machines over others has the potential to increase the throughput by about 5%. However …
Continue reading at www.researchgate.net (PDF) (other versions)

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
    • G06Q10/063Operations research or analysis
    • G06Q10/0631Resource planning, allocation or scheduling for a business operation
    • G06Q10/06315Needs-based resource requirements planning or analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
    • G06Q10/063Operations research or analysis
    • G06Q10/0639Performance analysis
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/418Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM]
    • G05B19/41865Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM] characterised by job scheduling, process planning, material flow
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/30Nc systems
    • G05B2219/32Operator till task planning
    • G05B2219/32234Maintenance planning
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation, e.g. linear programming, "travelling salesman problem" or "cutting stock problem"

Similar Documents

Publication Publication Date Title
Gopalakrishnan et al. Simulation-based planning of maintenance activities by a shifting priority method
Helber Performance analysis of flow lines with non-linear flow of material
Rachamadugu et al. Classification and review of FMS scheduling procedures
Antons et al. Designing decision-making authorities for smart factories
Golmohammadi et al. Complexity and workload considerations in product mix decisions under the theory of constraints
Ehrenberg et al. Simulation-based optimization in make-to-order production: scheduling for a special-purpose glass manufacturer
Lanza et al. Ad-hoc rescheduling and innovative business models for shock-robust production systems
Sahu et al. Quantitative analysis and optimization of production line based on multiple evaluation criteria using discrete event simulation: A review
Wang et al. Energy modeling and simulation of flexible manufacturing systems based on colored timed petri nets
Yan et al. Equilibria, stability, and transients in re-entrant lines under FBFS and LBFS dispatch and constant release
Herrmann et al. Framework for integrated analysis of production systems
Panteleev et al. Developing a model of multi-agent system of a process of a tech inspection and equipment repair
KR20120133362A (en) Optimized production scheduling system using loading simulation engine with dynamic feedback scheduling algorithm
Yan et al. Robustness of various production control policies in semiconductor manufacturing
Kopp et al. An optimization model for qualification management in wafer fabs
Saygin et al. Dissimilarity maximization method for real-time routing of parts in random flexible manufacturing systems
Obeid et al. Scheduling on parallel machines with time constraints and equipment health factors
Shafiq et al. Effect of Scheduling and Manufacturing Flexibility on the Performance of FMS
Bajestani et al. A new branch-and-bound algorithm for the unrelated parallel machine scheduling problem with sequence-dependent setup times
Zhou et al. Simulation based capacity optimization of a general assembly line with extremely unbalanced station process time
Li et al. Applied factory physics study on semiconductor assembly and test manufacturing
Krenczyk et al. Formulation of a sequencing problem in a mixed-model production system
Hassam et al. Selection of alternative routings in real time: DMM and modified DMM rules
Ciufudean et al. Safety discrete event models for holonic cyclic manufacturing systems
Ham et al. Balanced machine workload dispatching scheme for wafer fab