Gopalakrishnan et al., 2014 - Google Patents
Simulation-based planning of maintenance activities by a shifting priority methodGopalakrishnan et al., 2014
View PDF- Document ID
- 15526742620989351991
- Author
- Gopalakrishnan M
- Skoogh A
- Laroque C
- Publication year
- Publication venue
- Proceedings of the Winter Simulation Conference 2014
External Links
Snippet
Machine failures are major causes of direct downtime as well as system losses (blocked and idle times) in production flows. A previous case study shows that prioritizing bottleneck machines over others has the potential to increase the throughput by about 5%. However …
- 238000004088 simulation 0 title abstract description 32
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0631—Resource planning, allocation or scheduling for a business operation
- G06Q10/06315—Needs-based resource requirements planning or analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0639—Performance analysis
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Programme-control systems
- G05B19/02—Programme-control systems electric
- G05B19/418—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM]
- G05B19/41865—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM] characterised by job scheduling, process planning, material flow
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B2219/00—Program-control systems
- G05B2219/30—Nc systems
- G05B2219/32—Operator till task planning
- G05B2219/32234—Maintenance planning
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation, e.g. linear programming, "travelling salesman problem" or "cutting stock problem"
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Gopalakrishnan et al. | Simulation-based planning of maintenance activities by a shifting priority method | |
Helber | Performance analysis of flow lines with non-linear flow of material | |
Rachamadugu et al. | Classification and review of FMS scheduling procedures | |
Antons et al. | Designing decision-making authorities for smart factories | |
Golmohammadi et al. | Complexity and workload considerations in product mix decisions under the theory of constraints | |
Ehrenberg et al. | Simulation-based optimization in make-to-order production: scheduling for a special-purpose glass manufacturer | |
Lanza et al. | Ad-hoc rescheduling and innovative business models for shock-robust production systems | |
Sahu et al. | Quantitative analysis and optimization of production line based on multiple evaluation criteria using discrete event simulation: A review | |
Wang et al. | Energy modeling and simulation of flexible manufacturing systems based on colored timed petri nets | |
Yan et al. | Equilibria, stability, and transients in re-entrant lines under FBFS and LBFS dispatch and constant release | |
Herrmann et al. | Framework for integrated analysis of production systems | |
Panteleev et al. | Developing a model of multi-agent system of a process of a tech inspection and equipment repair | |
KR20120133362A (en) | Optimized production scheduling system using loading simulation engine with dynamic feedback scheduling algorithm | |
Yan et al. | Robustness of various production control policies in semiconductor manufacturing | |
Kopp et al. | An optimization model for qualification management in wafer fabs | |
Saygin et al. | Dissimilarity maximization method for real-time routing of parts in random flexible manufacturing systems | |
Obeid et al. | Scheduling on parallel machines with time constraints and equipment health factors | |
Shafiq et al. | Effect of Scheduling and Manufacturing Flexibility on the Performance of FMS | |
Bajestani et al. | A new branch-and-bound algorithm for the unrelated parallel machine scheduling problem with sequence-dependent setup times | |
Zhou et al. | Simulation based capacity optimization of a general assembly line with extremely unbalanced station process time | |
Li et al. | Applied factory physics study on semiconductor assembly and test manufacturing | |
Krenczyk et al. | Formulation of a sequencing problem in a mixed-model production system | |
Hassam et al. | Selection of alternative routings in real time: DMM and modified DMM rules | |
Ciufudean et al. | Safety discrete event models for holonic cyclic manufacturing systems | |
Ham et al. | Balanced machine workload dispatching scheme for wafer fab |