Maraqa et al., 2020 - Google Patents
Empirical assessment of the impact of VDC and lean on environment and waste in masonry operationsMaraqa et al., 2020
View PDF- Document ID
- 15237389062403831576
- Author
- Maraqa M
- Sacks R
- Spatari S
- Publication year
- Publication venue
- Proc. 28th Annual Conference of the International Group for Lean Construction (IGLC28), Berkeley, California, USA, https://doi. org/10.24928/2020/0040
External Links
Snippet
Lean principles aim to improve construction through focus on value and waste elimination, which benefits environmental performance by reducing life cycle greenhouse gas (GHG) emissions and improving other environmental metrics. Although prior research identified …
- 239000002699 waste material 0 title abstract description 54
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0631—Resource planning, allocation or scheduling for a business operation
- G06Q10/06311—Scheduling, planning or task assignment for a person or group
- G06Q10/063114—Status monitoring or status determination for a person or group
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0631—Resource planning, allocation or scheduling for a business operation
- G06Q10/06311—Scheduling, planning or task assignment for a person or group
- G06Q10/063118—Staff planning in a project environment
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0631—Resource planning, allocation or scheduling for a business operation
- G06Q10/06316—Sequencing of tasks or work
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0631—Resource planning, allocation or scheduling for a business operation
- G06Q10/06313—Resource planning in a project environment
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0631—Resource planning, allocation or scheduling for a business operation
- G06Q10/06312—Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0639—Performance analysis
- G06Q10/06393—Score-carding, benchmarking or key performance indicator [KPI] analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0633—Workflow analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation, e.g. linear programming, "travelling salesman problem" or "cutting stock problem"
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Guerra et al. | 4D-BIM to enhance construction waste reuse and recycle planning: Case studies on concrete and drywall waste streams | |
Skullestad et al. | High-rise timber buildings as a climate change mitigation measure–A comparative LCA of structural system alternatives | |
Ji et al. | BIM-based life-cycle environmental assessment of prefabricated buildings | |
Marzouk et al. | Building information modeling-based model for calculating direct and indirect emissions in construction projects | |
Sandanayake et al. | Estimation and comparison of environmental emissions and impacts at foundation and structure construction stages of a building–A case study | |
Mao et al. | Comparative study of greenhouse gas emissions between off-site prefabrication and conventional construction methods: Two case studies of residential projects | |
Kadir et al. | Construction performance comparison between conventional and industrialised building systems in Malaysia | |
Kumanayake et al. | Life cycle carbon emission assessment of a multi-purpose university building: A case study of Sri Lanka | |
Zhang et al. | BIM-based investigation of total energy consumption in delivering building products | |
Huang et al. | Planning gang formwork operations for building construction using simulations | |
Ivanica et al. | Development of a life cycle inventory database and life cycle impact assessment of the building demolition stage: A case study in Germany | |
Tam et al. | Evaluation of construction methods and performance for high rise public housing construction in Hong Kong | |
Pittau et al. | Environmental consequences of refurbishment versus demolition and reconstruction: a comparative life cycle assessment of an Italian case study | |
Maraqa et al. | Empirical assessment of the impact of VDC and lean on environment and waste in masonry operations | |
Abdul Kadir et al. | Construction performance comparison between conventional and industrialised building systems in Malaysia | |
Kumari et al. | Embodied carbon reduction strategies for high-rise buildings in Sri Lanka | |
Simonen et al. | Integrating environmental impacts as another measure of earthquake performance for tall buildings in high seismic zones | |
Maxineasa et al. | Environmental performances of different timber structures for pitched roofs | |
Hansen et al. | Enabling rapid prediction of quantities to accelerate LCA for decision support in the early building design | |
Estève et al. | Developing an integrated BIM/LCA framework to assess the sustainability of using earthen architecture | |
Shin et al. | The development of environmental load evaluation system of a standard Korean apartment house | |
Jahandideh et al. | Carbon footprint assessment in the life-cycle design of concrete structures in the tropics: A case study of residential buildings in Malaysia | |
Maraqa et al. | Role of Lean and VDC in Reducing Physical and Operational Waste and Environmental Impact | |
Hafner et al. | Life cycle analysis of vertical building extensions–environmental impacts of different material selection | |
Luo et al. | Prefabrication and waste minimisation in construction projects: Perspectives from New Zealand |