Goessmann et al., 2022 - Google Patents
Jumper Fabrication and Testing Specification for Tank FarmsGoessmann et al., 2022
View PDF- Document ID
- 1506091008149977931
- Author
- Goessmann G
- Washington River Protection Solutions L
- Publication year
External Links
Snippet
1.1. This specification establishes the requirements for fabrication, assembly, painting, identification, testing, inspection, and delivery of flexible and rigid jumpers for Tank Farms pit use. Additional information concerning jumper design, fabrication and testing will be found …
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Dale et al. | Continuous quality improvement: why some organisations lack commitment | |
Smith | The fundamentals of piping design | |
Horrocks et al. | Managing ageing plant | |
Goessmann et al. | Jumper Fabrication and Testing Specification for Tank Farms | |
Rostamy et al. | A Process for Selection of Leak Detection Systems for a Pipeline | |
Sears et al. | Joint integrity management of critical flanges | |
Hertelendy | Three Mile Island-II Back Up Heated VAC Dryer System (TMI-2 Fuel Vacuum Dryer) | |
Sperber | Execution Phase Part 1: Detailed Engineering | |
Beers | Performing Coating and Corrosion Assessments to Maintain Military Fuel Piping | |
Sotoodeh | Positive Material Identification Procedure Development to Prevent Valve Corrosion Failures | |
Hazzan | Why is mechanical integrity so tough? | |
Superseding | USACE/NAVFAC/AFCEC/NASA UFGS-33 52 80 (February 2010) | |
Rodery et al. | A Proposed Framework for the Training and Qualification of Personnel Involved in Field Machining of Bolted Flanged Joints | |
Hoesel et al. | A “Case” History in the Minuteman Reliability Program | |
Huitt | Piping for Process Plants, Part 4: Codes and Fabrication. | |
Standard | General-Purpose Steam Turbines for Petroleum, Chemical, and Gas Industry Services | |
Pereira | Auditing Mechanical Integrity Programs in PSM-Covered Facilities | |
Supersedes | Liquid Metal Engineering Center | |
Milne | Joint integrity–the essential elements | |
TO et al. | ROT Standards Transmittal | |
Ohler | Quality Assurance Plan for site electrical replacements at substation line item subproject: 69 KV Substation | |
SK et al. | REVISION RECORD | |
Weber | Tokamak Physics EXperiment (TPX): Toroidal field magnet design, development and manufacture. SDRL 32, Coil assembly documentation. Volume 5 | |
Zhou et al. | Implementation of Alternative Integrity Validation on a Large Diameter Pipeline Construction Project | |
Dean et al. | Industrial Instrument Mechanic. Occupational Analyses Series. |