Hajirasouli et al., 2022 - Google Patents
Augmented reality in design and construction: thematic analysis and conceptual frameworksHajirasouli et al., 2022
View PDF- Document ID
- 13855440450085622008
- Author
- Hajirasouli A
- Banihashemi S
- Drogemuller R
- Fazeli A
- Mohandes S
- Publication year
- Publication venue
- Construction Innovation
External Links
Snippet
Purpose This study aims to present a comprehensive review, critical analysis and implications of the augmented reality (AR) application and implementation in the construction industry arena and demonstrate the gaps along with the future research …
- 238000010276 construction 0 title abstract description 147
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F3/00—Input arrangements for transferring data to be processed into a form capable of being handled by the computer; Output arrangements for transferring data from processing unit to output unit, e.g. interface arrangements
- G06F3/01—Input arrangements or combined input and output arrangements for interaction between user and computer
- G06F3/048—Interaction techniques based on graphical user interfaces [GUI]
- G06F3/0481—Interaction techniques based on graphical user interfaces [GUI] based on specific properties of the displayed interaction object or a metaphor-based environment, e.g. interaction with desktop elements like windows or icons, or assisted by a cursor's changing behaviour or appearance
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F17/00—Digital computing or data processing equipment or methods, specially adapted for specific functions
- G06F17/50—Computer-aided design
- G06F17/5009—Computer-aided design using simulation
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06T—IMAGE DATA PROCESSING OR GENERATION, IN GENERAL
- G06T2200/00—Indexing scheme for image data processing or generation, in general
- G06T2200/24—Indexing scheme for image data processing or generation, in general involving graphical user interfaces [GUIs]
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06T—IMAGE DATA PROCESSING OR GENERATION, IN GENERAL
- G06T11/00—2D [Two Dimensional] image generation
- G06T11/20—Drawing from basic elements, e.g. lines or circles
- G06T11/206—Drawing of charts or graphs
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F17/00—Digital computing or data processing equipment or methods, specially adapted for specific functions
- G06F17/30—Information retrieval; Database structures therefor; File system structures therefor
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation, e.g. computer aided management of electronic mail or groupware; Time management, e.g. calendars, reminders, meetings or time accounting
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06T—IMAGE DATA PROCESSING OR GENERATION, IN GENERAL
- G06T19/00—Manipulating 3D models or images for computer graphics
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06T—IMAGE DATA PROCESSING OR GENERATION, IN GENERAL
- G06T17/00—Three dimensional [3D] modelling, e.g. data description of 3D objects
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06T—IMAGE DATA PROCESSING OR GENERATION, IN GENERAL
- G06T7/00—Image analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06T—IMAGE DATA PROCESSING OR GENERATION, IN GENERAL
- G06T2219/00—Indexing scheme for manipulating 3D models or images for computer graphics
- G06T2219/20—Indexing scheme for editing of 3D models
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06T—IMAGE DATA PROCESSING OR GENERATION, IN GENERAL
- G06T2207/00—Indexing scheme for image analysis or image enhancement
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Hajirasouli et al. | Augmented reality in design and construction: thematic analysis and conceptual frameworks | |
Cheng et al. | State-of-the-art review on mixed reality applications in the AECO industry | |
Davila Delgado et al. | Augmented and virtual reality in construction: drivers and limitations for industry adoption | |
Palmarini et al. | A systematic review of augmented reality applications in maintenance | |
Alizadehsalehi et al. | From BIM to extended reality in AEC industry | |
Schiavi et al. | BIM data flow architecture with AR/VR technologies: Use cases in architecture, engineering and construction | |
Devagiri et al. | Augmented Reality and Artificial Intelligence in industry: Trends, tools, and future challenges | |
Khan et al. | Integration of BIM and immersive technologies for AEC: A scientometric-SWOT analysis and critical content review | |
Delgado et al. | A research agenda for augmented and virtual reality in architecture, engineering and construction | |
García-Pereira et al. | A collaborative augmented reality annotation tool for the inspection of prefabricated buildings | |
Wang et al. | Augmented Reality in built environment: Classification and implications for future research | |
Hou et al. | Combining photogrammetry and augmented reality towards an integrated facility management system for the oil industry | |
Oke et al. | An analysis of the application areas of augmented reality technology in the construction industry | |
Kolaei et al. | Challenges and opportunities of augmented reality during the construction phase | |
Chung et al. | Smart facility management systems utilizing open BIM and augmented/virtual reality | |
Zhou et al. | Computer-aided process planning in immersive environments: A critical review | |
Ababsa | Augmented reality application in manufacturing industry: Maintenance and non-destructive testing (ndt) use cases | |
Insa-Iglesias et al. | 3D visual inspection system framework for structural condition monitoring and analysis | |
Cardoso et al. | A virtual reality based approach to improve human performance and to minimize safety risks when operating power electric systems | |
Nassereddine | Design, development and validation of an augmented reality-enabled production strategy process for the construction industry | |
Assila et al. | Integration of augmented, virtual and mixed reality with building information modeling: a systematic review | |
Smith et al. | Wearable augmented reality interface design for bridge inspection | |
Zaman et al. | Integration of BIM data and real-time game engine applications: Case studies in construction safety management. | |
Salman et al. | Implementation of augmented reality and mixed reality applications for smart facilities management: a systematic review | |
Wang et al. | Implementation of augmented reality in BIM-enabled construction projects: a bibliometric literature review and a case study from China |