Xiang, 2022 - Google Patents
Research on Building BIM Intelligent Training System Based on Computer 3D TechnologyXiang, 2022
- Document ID
- 13594004451705954396
- Author
- Xiang W
- Publication year
- Publication venue
- 2022 2nd International Signal Processing, Communications and Engineering Management Conference (ISPCEM)
External Links
Snippet
In this paper, based on the BIM model of computer 3D technology and OPC standard, the research on building intelligent information integration platform is carried out. This paper uses the OPC intelligent data access technology and the characteristics of BIM 3D model …
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0631—Resource planning, allocation or scheduling for a business operation
- G06Q10/06316—Sequencing of tasks or work
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F17/00—Digital computing or data processing equipment or methods, specially adapted for specific functions
- G06F17/30—Information retrieval; Database structures therefor; File system structures therefor
- G06F17/30286—Information retrieval; Database structures therefor; File system structures therefor in structured data stores
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation, e.g. computer aided management of electronic mail or groupware; Time management, e.g. calendars, reminders, meetings or time accounting
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for a specific business sector, e.g. utilities or tourism
- G06Q50/08—Construction
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Programme-control systems
- G05B19/02—Programme-control systems electric
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B15/00—Systems controlled by a computer
- G05B15/02—Systems controlled by a computer electric
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B2219/00—Program-control systems
- G05B2219/30—Nc systems
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Yang et al. | Adopting building information modeling (BIM) for the development of smart buildings: a review of enabling applications and challenges | |
Xie et al. | Policies, applications, barriers and future trends of building information modeling technology for building sustainability and informatization in China | |
CN103559562A (en) | Power grid intelligent operation system and achieving method thereof | |
CN113902605A (en) | Smart park operation and maintenance management mode based on CIM framework | |
CN109460834A (en) | Build operation management system and its management method | |
KR101106220B1 (en) | System for environmental load assessment during life cycle of building | |
CN111104622A (en) | WEBGL-based three-dimensional GIS intelligent monitoring method and device | |
CN109558412A (en) | The data growing method and device of assembled architecture construct platform | |
CN113722797A (en) | Lightweight BIM prefabricated part full life cycle comprehensive information management system | |
RU2686006C1 (en) | Method and system for information modeling of business processes of a life cycle of a production facility | |
CN106251240A (en) | Power transmission network method for early warning based on big data | |
CN110490361A (en) | The digital emergency planning system and its design method of urban distribution network contingency management | |
CN104778551A (en) | Designing and analyzing method of visualization grid | |
Wang et al. | Digital twin-based framework for green building maintenance system | |
Cao et al. | A digital twin (DT) framework at design and construction phases | |
Wang et al. | A hybrid building information modeling and collaboration platform for automation system in smart construction | |
Huang et al. | Research on safety of operation and maintenance of utility tunnel based on BIM and computer technology | |
CN115220378A (en) | System based on BIM model and operation and maintenance information interaction in intelligent building management | |
CN111131482A (en) | Intelligent monitoring closed-loop operation and maintenance system based on BIM three-terminal synchronous equipment | |
Zhang | Intelligent building planning system based on BIM and artificial intelligence | |
Xu | Analysis of safety behavior of prefabricated building Workers’ hoisting operation based on computer vision | |
Xiang | Research on Building BIM Intelligent Training System Based on Computer 3D Technology | |
Adeel et al. | Building information modeling and artificial intelligence based smart construction management: Materials and electrical | |
CN115424212A (en) | Electric power operation field violation identification system and application thereof | |
Baiardi et al. | The integrated project for the redevelopment of a historic building: an example of BIM and IoT integration to manage the comfort of the building |