Yu et al., 2017 - Google Patents
Stochastic optimization model for supporting urban drainage design under complexityYu et al., 2017
View PDF- Document ID
- 13570536430447600542
- Author
- Yu J
- Qin X
- Chiew Y
- Min R
- Shen X
- Publication year
- Publication venue
- Journal of Water Resources Planning and Management
External Links
Snippet
A stochastic optimization model for urban drainage design (SODD) was proposed in this study to help analyze the trade-off between investment and acceptable flood damage in urban drainage designs considering effects of both uncertainty and climate change. The …
- 238000005457 optimization 0 title abstract description 71
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F17/00—Digital computing or data processing equipment or methods, specially adapted for specific functions
- G06F17/50—Computer-aided design
- G06F17/5009—Computer-aided design using simulation
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation, e.g. linear programming, "travelling salesman problem" or "cutting stock problem"
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F21/00—Security arrangements for protecting computers, components thereof, programs or data against unauthorised activity
- G06F21/50—Monitoring users, programs or devices to maintain the integrity of platforms, e.g. of processors, firmware or operating systems
- G06F21/57—Certifying or maintaining trusted computer platforms, e.g. secure boots or power-downs, version controls, system software checks, secure updates or assessing vulnerabilities
- G06F21/577—Assessing vulnerabilities and evaluating computer system security
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for a specific business sector, e.g. utilities or tourism
- G06Q50/10—Services
- G06Q50/26—Government or public service
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q40/00—Finance; Insurance; Tax strategies; Processing of corporate or income taxes
- G06Q40/06—Investment, e.g. financial instruments, portfolio management or fund management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q30/00—Commerce, e.g. shopping or e-commerce
- G06Q30/01—Customer relationship, e.g. warranty
- G06Q30/018—Business or product certification or verification
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for a specific business sector, e.g. utilities or tourism
- G06Q50/08—Construction
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Kirshen et al. | Adapting urban infrastructure to climate change: A drainage case study | |
Yu et al. | Stochastic optimization model for supporting urban drainage design under complexity | |
Butts et al. | An evaluation of the impact of model structure on hydrological modelling uncertainty for streamflow simulation | |
Wang et al. | Comparative case study of rainfall-runoff modeling between SWMM and fuzzy logic approach | |
Yazdi et al. | Stochastic multiobjective optimization model for urban drainage network rehabilitation | |
Haddad et al. | Retracted: levee layouts and design optimization in protection of flood areas | |
Sarzaeim et al. | Runoff projection under climate change conditions with data-mining methods | |
Jato-Espino et al. | Flood risk assessment in urban catchments using multiple regression analysis | |
Jahanbazi et al. | Application and comparison of two different dual drainage models to assess urban flooding | |
Kim et al. | Assessment of porous pavement effectiveness on runoff reduction under climate change scenarios | |
Sordo-Ward et al. | Impact of hydrological uncertainty on water management decisions | |
Ashofteh et al. | Evaluation of the impacts of climate variability and human activity on streamflow at the basin scale | |
Goharian et al. | Using joint probability distribution of reliability and vulnerability to develop a water system performance index | |
Yazdi et al. | Copula-based performance assessment of online and offline detention ponds for urban stormwater management | |
Dong et al. | Bivariate flood frequency analysis of nonstationary flood characteristics | |
Zhou et al. | Optimising the combination strategies for pipe and infiltration‐based low impact development measures using a multiobjective evolution approach | |
Vrban et al. | Evaluation of stormwater infrastructure design storms developed using partial duration and annual maximum series models | |
Zhang et al. | A surrogate-based optimization design and uncertainty analysis for urban flood mitigation | |
Yazdi et al. | A stochastic optimization algorithm for optimizing flood risk management measures including rainfall uncertainties and nonphysical flood damages | |
Pedersen et al. | Using multi-event hydrologic and hydraulic signatures from water level sensors to diagnose locations of uncertainty in integrated urban drainage models used in living digital twins | |
Rossi et al. | Potential impacts of changes in climate on turbidity in New York City’s Ashokan Reservoir | |
Ashofteh et al. | Performance evaluation of a developed hybrid AOGCM model under climate change | |
de la Cruz Courtois et al. | Simulated optimal operation policies of a reservoir system obtained with continuous functions using synthetic inflows | |
Mishra et al. | Development of decision support system (DSS) for urban flood management: a review of methodologies and results | |
Zimmer et al. | Reducing combined sewer overflows through model predictive control and capital investment |