JANAKIRAM et al., 1995 - Google Patents
The use of FMEA in process quality improvementJANAKIRAM et al., 1995
- Document ID
- 13568881438106881601
- Author
- JANAKIRAM M
- KEATS J
- Publication year
- Publication venue
- International Journal of Reliability, Quality and Safety Engineering
External Links
Snippet
Failure Mode and Effects Analysis (FMEA) is well-known as a useful tool in the design process. It is used by some engineers as part of process characterization studies. Yet FMEA is virtually ignored in most process quality improvement paradigms. We suggest its use in …
- 238000000034 method 0 title abstract description 196
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0631—Resource planning, allocation or scheduling for a business operation
- G06Q10/06311—Scheduling, planning or task assignment for a person or group
- G06Q10/063114—Status monitoring or status determination for a person or group
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0639—Performance analysis
- G06Q10/06398—Performance of employee with respect to a job function
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0639—Performance analysis
- G06Q10/06393—Score-carding, benchmarking or key performance indicator [KPI] analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0639—Performance analysis
- G06Q10/06395—Quality analysis or management
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B2219/00—Program-control systems
- G05B2219/30—Nc systems
- G05B2219/32—Operator till task planning
- G05B2219/32234—Maintenance planning
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation, e.g. computer aided management of electronic mail or groupware; Time management, e.g. calendars, reminders, meetings or time accounting
- G06Q10/101—Collaborative creation of products or services
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Programme-control systems
- G05B19/02—Programme-control systems electric
- G05B19/18—Numerical control [NC], i.e. automatically operating machines, in particular machine tools, e.g. in a manufacturing environment, so as to execute positioning, movement or co-ordinated operations by means of programme data in numerical form
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B23/00—Testing or monitoring of control systems or parts thereof
- G05B23/02—Electric testing or monitoring
- G05B23/0205—Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Mahto et al. | Application of root cause analysis in improvement of product quality and productivity | |
Stamatis | The ASQ pocket guide to failure mode and effect analysis (FMEA) | |
Parida | Study and analysis of maintenance performance indicators (MPIs) for LKAB: A case study | |
Falck et al. | Criteria for assessment of basic manual assembly complexity | |
Agrawal et al. | Does organizational forgetting affect vendor quality performance? An empirical investigation | |
Lamptey et al. | Developing a project status dashboard for construction project progress reporting | |
Tuhacek et al. | Quality of project documentation | |
Bevilacqua et al. | Overview on the application of ISO/TS 16949: 2009, in a worldwide leader company in the production of stainless steel tubes for automotive exhaust systems | |
US20050154561A1 (en) | Method for performing failure mode and effects analysis | |
JANAKIRAM et al. | The use of FMEA in process quality improvement | |
Cheh | Analysis of Overall Equipment Effectiveness (OEE) within different sectors in different Swedish industries. | |
Badiger et al. | A methodology to enhance equipment performance using the OEE measure | |
CN110874712A (en) | Modeling method of equipment integrity management system | |
Whitcomb et al. | Failure modes and effects analysis (FMEA) system deployment in a semiconductor manufacturing environment | |
Mawane et al. | Evaluating the impact of TPM in a railway and mining component manufacturing company. | |
Hultman | Capability study and measurement system analysis: A case study at bosch rexroth AB | |
Hassan | Assessment of Total Productive Maintenance (TPM) Implementation in Industrial Environment | |
Buksa et al. | Shipbuilding pipeline production quality improvement | |
Boudinot et al. | Integration of Safety and Process Improvement to Improve Perceived Incompatibility | |
Pan et al. | Quality tree: A systematic problem-solving model using total quality management tools and techniques | |
Cyganiuk et al. | Solving selected quality management problems with the use of the D4 discipline algorithm of the G8D method | |
Shin et al. | On the effectiveness of on‐line repair policy: quality failure costs perspective | |
Ahumada et al. | Relationship between Human-Managerial and Social-Organizational Factors for Industry Safeguards Project: Dynamic Bayesian Networks | |
Nedzanani | Optimum selection of maintenance strategies | |
FA08066 | Implementation of 7 QC tools by using kaizen approach for sme manufacturing industry |