Zhao et al., 2023 - Google Patents
Analysis of influencing factors of equipment life cycle based on TOPSIS-AISMZhao et al., 2023
- Document ID
- 12545032861260126172
- Author
- Zhao Y
- Yang F
- Fu A
- Publication year
- Publication venue
- 2023 IEEE 12th International Conference on Communication Systems and Network Technologies (CSNT)
External Links
Snippet
With the rapid development of economy and society, power grid needs the optimal comprehensive benefit of integrating performance, cost and risk control. To pay attention to the life-cycle management of assets, adopt the TOPSIS-AISM combined model, introduce …
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
- Y04S10/54—Management of operational aspects, e.g. planning, load or production forecast, maintenance, construction, extension
- Y04S10/545—Computing methods or systems for efficient or low carbon management or operation of electric power systems
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GASES [GHG] EMISSION, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E60/00—Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
- Y02E60/70—Systems integrating technologies related to power network operation and communication or information technologies mediating in the improvement of the carbon footprint of electrical power generation, transmission or distribution, i.e. smart grids as enabling technology in the energy generation sector not used, see subgroups
- Y02E60/76—Computer aided design [CAD]; Simulation; Modelling
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
- Y04S10/60—Reporting; Information providing; Statistics or analysis
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S40/00—Communication or information technology specific aspects supporting electrical power generation, transmission, distribution or end-user application management
- Y04S40/20—Information technology specific aspects
- Y04S40/22—Computer aided design [CAD]; Simulation; Modelling
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation, e.g. linear programming, "travelling salesman problem" or "cutting stock problem"
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103761690A (en) | Evaluation method based on voltage reactive power control system in grid system | |
CN106991524A (en) | A kind of platform area line loss per unit predictor method | |
CN102289569A (en) | Method for emergency treatment of emergency events of power system | |
CN105046591A (en) | Method for evaluating electricity utilization energy efficiency of power consumer | |
CN105701554A (en) | Electrical equipment energy efficiency chaos analysis method based on massive measurement data | |
Wang et al. | A two-stage approach of DEA and AHP in selecting optimal wind power plants | |
CN106951993A (en) | A kind of electric energy data predictor method | |
Wu et al. | Optimal site selection of rural wind–photovoltaic-storage station from a sustainable development perspective | |
Zhao et al. | Analysis of influencing factors of equipment life cycle based on TOPSIS-AISM | |
Zhu et al. | On-site energy consumption technologies and prosumer marketing for distributed poverty alleviation photovoltaic linked to agricultural loads in china | |
Shi et al. | Assessment of regional water resource security: a case study from Hebei Province, China | |
Um et al. | Comprehensive evaluation indexes framework and evaluation method for substation site selection | |
Song et al. | Design of Improved Algorithm and Model for Multi-constrained Fuzzy Predictive Analysis. | |
Zhong et al. | [Retracted] Analysis and Design of the Project Risk Management System Based on the Fuzzy Clustering Algorithm | |
Fu et al. | Analysis of Influencing Factors of Equipment Life Cycle Based on Random Forest | |
Li et al. | Tech-economic benefit evaluation and decision for distribution network planning based on fuzzy analysis hierarchical process | |
Zheng | Knowledge Spillover from Green FDI: Evidence from Green Innovation in China | |
Sampaio et al. | Community detection for power systems network aggregation considering renewable variability | |
Zhang et al. | Forecast and analysis of regional energy demand based on grey linear regression forecast model | |
Xiao et al. | Multiple-criteria decision-making of distribution system planning considering distributed generation | |
He et al. | Research on the Selection Method of Modern Rural Power Grid Demonstration Area based on AHP Algorithm | |
Hong et al. | Establishment and application of the CW-MEEM model for post-evaluation of power grid construction projects | |
Liang et al. | Optimal Operation and Maintenance of Power Consumption Acquisition System for Power Users Based on Data Drive | |
Wang et al. | Benefit evaluation and improvement methods for power grid infrastructure projects | |
Yang et al. | Short Term Wind Power Load Prediction Algorithm Based on MLE |