Nothing Special   »   [go: up one dir, main page]

Unver et al., 2020 - Google Patents

A decision support system for proactive failure prevention: a case in a leading automotive company

Unver et al., 2020

View PDF
Document ID
12304225727542317699
Author
Unver B
Kabak Ă
Topcu Y
Altinisik A
Cavusoglu O
Publication year
Publication venue
Journal of Enterprise Information Management

External Links

Snippet

Purpose In the automotive industry, the high process complexity becomes an important issue because of the increased number of product and process variants demanded by the customers. To avoid quality defects in assembly and losses in such a complex …
Continue reading at www.researchgate.net (PDF) (other versions)

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
    • G06Q10/063Operations research or analysis
    • G06Q10/0639Performance analysis
    • G06Q10/06393Score-carding, benchmarking or key performance indicator [KPI] analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
    • G06Q10/063Operations research or analysis
    • G06Q10/0639Performance analysis
    • G06Q10/06395Quality analysis or management
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06FELECTRICAL DIGITAL DATA PROCESSING
    • G06F17/00Digital computing or data processing equipment or methods, specially adapted for specific functions
    • G06F17/50Computer-aided design
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce, e.g. shopping or e-commerce
    • G06Q30/02Marketing, e.g. market research and analysis, surveying, promotions, advertising, buyer profiling, customer management or rewards; Price estimation or determination
    • G06Q30/0202Market predictions or demand forecasting

Similar Documents

Publication Publication Date Title
Farooq et al. Cost of quality: Evaluating cost-quality trade-offs for inspection strategies of manufacturing processes
Wasserman Reliability verification, testing, and analysis in engineering design
Levin Organizational learning and the transfer of knowledge: An investigation of quality improvement
Unver et al. A decision support system for proactive failure prevention: a case in a leading automotive company
Stäblein et al. Theoretical versus actual product variety: how much customisation do customers really demand?
Arnheiter et al. The integration of lean management and Six Sigma
US8732112B2 (en) Method and system for root cause analysis and quality monitoring of system-level faults
Falck et al. Proactive assessment of basic complexity in manual assembly: development of a tool to predict and control operator-induced quality errors
Falck et al. Basic complexity criteria and their impact on manual assembly quality in actual production
Falck et al. Criteria for assessment of basic manual assembly complexity
Netland et al. Effects of a production improvement programme on global quality performance: The case of the Volvo Production System
Klochkov et al. Approaches to the improvement of quality management methods
Abdullah et al. Supplier development framework in the Malaysian automotive industry: Proton’s experience
Hadi et al. The implementation of quality function deployment (QFD) in tire industry
Al‐Mishari et al. Integrating Six‐Sigma with other reliability improvement methods in equipment reliability and maintenance applications
Alalawin et al. Forecasting vehicle's spare parts price and demand
Amineh et al. Assessment of Consumers' Satisfaction with the Automotive Product Quality.
Plinta et al. PRACTICAL APPLICATION OF THE NEW APPROACH TO FMEA METHOD ACCORDING TO AIAG AND VDA REFERENCE MANUAL.
Schuh et al. Iterative cost assessment of maintenance services
Michelini et al. Diagnostics for monitoring maintenance and quality manufacturing
Darmawan et al. Comparison between ANN and multiple linear regression models for prediction of warranty cost
Altinisik et al. Failure prediction in electrical connector assembly: a case in automotive assembly process
Wagner et al. Advanced analytics for evaluating critical joining technologies in automotive body structures and body shops
Nyhuis et al. Adaptation of logistic operating curves to one‐piece flow processes
Shubenkova et al. Ways to Improve the Efficiency of the Truck's Branded Service System.