Liguori et al., 1978 - Google Patents
THE DESIGN AND CONSTRUCTION OF THE ALYESICA PIPELINELiguori et al., 1978
View PDF- Document ID
- 12115535428291713645
- Author
- Liguori A
- Maple J
- Heuer C
- Publication year
- Publication venue
- THIRD INTERNATIONAL CONFERENCE ON PERMAFROST
External Links
Snippet
This presentation is dedicated by the authors to Or. Hal Peyton who was involvea originally on the pipeline as a private consultant and subsequently as a senior staff engineer and manager of staff engineering for the Alyeska Pipeline Service Company. Dr. Peyton was …
- 238000010276 construction 0 title abstract description 24
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B3/00—Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealing or joints for engineering works in general
- E02B3/04—Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/045—Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B7/00—Barrages or weirs; Layout, construction, methods of, or devices for, making same
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C9/00—Special pavings; Pavings for special parts of roads or airfields
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C3/00—Foundations for pavings
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B17/00—Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; construction methods therefor
- E02B17/0017—Means for protecting offshore constructions
- E02B17/0021—Means for protecting offshore constructions against ice-loads
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B17/00—Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; construction methods therefor
- E02B2017/0056—Platforms with supporting legs
- E02B2017/0073—Details of sea bottom engaging footing
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D3/00—Improving or preserving soil or rock, e.g. preserving permafrost soil
- E02D3/11—Improving or preserving soil or rock, e.g. preserving permafrost soil by thermal, electrical or electro-chemical means
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D33/00—Testing foundations or foundation structures
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/74—Means for anchoring structural elements or bulkheads
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Ferrians et al. | Permafrost and related engineering problems in Alaska | |
Yu et al. | Analysis of tower foundation stability along the Qinghai–Tibet Power Transmission Line and impact of the route on the permafrost | |
Linell | Design and construction of foundations in areas of deep seasonal frost and permafrost | |
Sanger | Foundations of structures in cold regions | |
Liguori et al. | THE DESIGN AND CONSTRUCTION OF THE ALYESICA PIPELINE | |
Hayley | Application of heat pipes to design of shallow foundations on permafrost | |
US6976809B1 (en) | Method of preventing frost heave stress concentrations in chilled buried pipelines | |
Kutvitskaya et al. | Design of Beds and Foundations of Infrastructure for Oil-Gas Condensate Fields Under Complex Frozen-Soil Conditions. | |
Cole et al. | The economic impact and consequences of global climate change on Alaska’s infrastructure | |
Péwé | Permafrost—and its affects on human activities in arctic and subarctic regions | |
Luscher et al. | Geotechnical aspects of trans-Alaska pipeline | |
Kondratiev | Design and Experience—Controlling Railroad Embankment Deformation on Ice-Rich Permafrost | |
Robinsky et al. | Design of insulated foundations | |
Eidinger et al. | Oil and water system performance–Denali M 7.9 earthquake of November 3, 2002 | |
Kondratiev | Some geocryological problems of railways and highways on permafrost of Transbaikal and Tibet | |
TM | Arctic and subarctic construction foundations for structures | |
Rykaart et al. | Frozen Core Tailings Dam: Part 2, Long-Term Creep Deformation | |
Lucas et al. | Alaskan Beaufort Sea Exploration and Production Islands-Civil Design and Construction | |
Rooney et al. | Foundation rehabilitation at ADOT/PF Jim River maintenance camp | |
Carey et al. | Prevention and control of culvert icing: summary report on studies, FY 1966-70 | |
Sayles | Embankment dams on permafrost: design and performance summary, bibliography, and an annotated bibliography | |
Assessment et al. | Flat Loop Thermosyphon Foundations in Warm Permafrost | |
Khrenov | Some recommendations for ensuring the stability of pile substructures for above-ground routing of the zapolyarnoe-purpe petroleum pipeline | |
Davies et al. | PD 6 (1) Deep Permafrost Oil Production: The First Two Years | |
Zhang et al. | Thermal design of shallow building foundations in permafrost regions |