Konicek, 2018 - Google Patents
DestressingKonicek, 2018
- Document ID
- 12151974665549184021
- Author
- Konicek P
- Publication year
- Publication venue
- Rockburst
External Links
Snippet
Destressing techniques play a very important role as an active measure against rockbursts. The main goals of destressing are the softening of competent rock layers, the reduction of strain energy storage, and the release of rock mass stress. This chapter presents the main …
- 238000005422 blasting 0 abstract description 167
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/25—Methods for stimulating production
- E21B43/26—Methods for stimulating production by forming crevices or fractures
- E21B43/263—Methods for stimulating production by forming crevices or fractures using explosives
- E21B43/2635—Methods for stimulating production by forming crevices or fractures using explosives by means of nuclear energy
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21C—MINING OR QUARRYING
- E21C41/00—Methods of underground or surface mining; Lay-outs therefor
- E21C41/16—Methods of underground mining; Layouts therefor
- E21C41/18—Methods of underground mining; Layouts therefor for brown or hard coal
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21C—MINING OR QUARRYING
- E21C41/00—Methods of underground or surface mining; Lay-outs therefor
- E21C41/16—Methods of underground mining; Layouts therefor
- E21C41/24—Methods of underground mining; Layouts therefor for oil-bearing deposits
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21C—MINING OR QUARRYING
- E21C41/00—Methods of underground or surface mining; Lay-outs therefor
- E21C41/26—Methods of surface mining; Layouts therefor
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21C—MINING OR QUARRYING
- E21C27/00—Machines which completely free the mineral from the seam
- E21C27/20—Mineral freed by means not involving slitting
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21C—MINING OR QUARRYING
- E21C47/00—Machines for obtaining or the removal of materials in open-pit mines
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F15/00—Methods or devices for placing filling-up materials in underground workings
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21C—MINING OR QUARRYING
- E21C35/00—Miscellaneous items relating to machines for slitting or completely freeing the mineral from the seam
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21C—MINING OR QUARRYING
- E21C25/00—Cutting machines, i.e. for making slits approximately parallel or perpendicular to the seam
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D23/00—Mine roof supports for step- by- step movement, e.g. in combination with provisions for shifting of conveyors, mining machines, or guides therefor
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Zhao et al. | Case studies of rock bursts under complicated geological conditions during multi-seam mining at a depth of 800 m | |
Konicek et al. | Stress changes and seismicity monitoring of hard coal longwall mining in high rockburst risk areas | |
Mazaira et al. | Intense rockburst impacts in deep underground construction and their prevention | |
Gong et al. | Rock burst and slabbing failure and its influence on TBM excavation at headrace tunnels in Jinping II hydropower station | |
Mandal et al. | Evaluating extent and causes of overbreak in tunnels | |
Singh et al. | Blast vibration effects in an underground mine caused by open-pit mining | |
Konicek et al. | Destress blasting in coal mining–state-of-the-art review | |
WO2011103620A1 (en) | A method of reducing subsidence or windblast impacts from longwall mining | |
CN112377193B (en) | Deep well small coal pillar gob-side entry retaining method based on top breaking and pressure relief of lower key layer of top plate | |
Konicek | Destressing | |
Yang et al. | Application cumulative tensile explosions for roof cutting in Chinese underground coal mines | |
Li et al. | Trial of small gateroad pillar in top coal caving longwall mining of large mining height | |
Hu et al. | Presplitting blasting the roof strata to control large deformation in the deep mine roadway | |
Fan et al. | Investigation of surrounding rock stability during proximal coal seams mining process and feasibility of ground control technology | |
Huang et al. | Field experiment of destress hydraulic fracturing for controlling the large deformation of the dynamic pressure entry heading adjacent to the advancing longwall face | |
Yu et al. | Innovative Control Technique for the Floor Heave in Goaf‐Side Entry Retaining Based on Pressure Relief by Roof Cutting | |
Zou et al. | Mechanism of hydraulic fracturing for controlling strong mining-induced earthquakes induced by coal mining | |
Yin et al. | Gob-side entry retaining formed by roof cutting without roadside support | |
Chouhan | Induced seismicity of Indian coal mines | |
Shnorhokian et al. | Mechanisms and Measurements of Destressing in Underground Mines: A State-of-the-Art Review | |
Zhang et al. | Experimental study ON the joint application OF innovative techniques for the improved drivage OF roadways at depths over 1 KM: a case study | |
Konicek et al. | Destress blasting on the border of safety pillars | |
Arshad et al. | Methods and applications of coal seam destress–a comprehensive literature review | |
Liu et al. | Rock burst prevention and control of multifield coupling in longwall working face | |
Mgumbwa et al. | Managing a change in rock mass response to mining at the Frog’s Leg underground mine |