Punnoose, 2018 - Google Patents
Risk Assessment and Management: ISM Code PerspectivePunnoose, 2018
View PDF- Document ID
- 11848590941687906021
- Author
- Punnoose B
- Publication year
- Publication venue
- International Register of Shipping
External Links
Snippet
1.1. 1. We are not sure if Adam had performed risk assessment before accepting the forbidden apple, but the caveman definitely must have weighed the consequences of hunting wild animals. 1.1. 2. Examples of structured risk assessment dating back to 3000 BC …
- 238000012502 risk assessment 0 title abstract description 41
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0639—Performance analysis
- G06Q10/06393—Score-carding, benchmarking or key performance indicator [KPI] analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0635—Risk analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0631—Resource planning, allocation or scheduling for a business operation
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B23/00—Testing or monitoring of control systems or parts thereof
- G05B23/02—Electric testing or monitoring
- G05B23/0205—Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults
- G05B23/0259—Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults characterized by the response to fault detection
- G05B23/0283—Predictive maintenance, e.g. involving the monitoring of a system and, based on the monitoring results, taking decisions on the maintenance schedule of the monitored system; Estimating remaining useful life [RUL]
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation, e.g. computer aided management of electronic mail or groupware; Time management, e.g. calendars, reminders, meetings or time accounting
- G06Q10/105—Human resources
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06N—COMPUTER SYSTEMS BASED ON SPECIFIC COMPUTATIONAL MODELS
- G06N5/00—Computer systems utilising knowledge based models
- G06N5/02—Knowledge representation
- G06N5/022—Knowledge engineering, knowledge acquisition
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F21/00—Security arrangements for protecting computers, components thereof, programs or data against unauthorised activity
- G06F21/50—Monitoring users, programs or devices to maintain the integrity of platforms, e.g. of processors, firmware or operating systems
- G06F21/57—Certifying or maintaining trusted computer platforms, e.g. secure boots or power-downs, version controls, system software checks, secure updates or assessing vulnerabilities
- G06F21/577—Assessing vulnerabilities and evaluating computer system security
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06N—COMPUTER SYSTEMS BASED ON SPECIFIC COMPUTATIONAL MODELS
- G06N5/00—Computer systems utilising knowledge based models
- G06N5/04—Inference methods or devices
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Roland et al. | System safety engineering and management | |
Mokashi et al. | A study of reliability-centred maintenance in maritime operations | |
Kandemir et al. | Determining the error producing conditions in marine engineering maintenance and operations through HFACS-MMO | |
Groth et al. | A data-informed PIF hierarchy for model-based human reliability analysis | |
Robu et al. | Methods and procedures for environmental risk assessment. | |
Karamustafa et al. | Extension of safety and critical effect analysis to neutrosophic sets for the evaluation of occupational risks | |
Caterino et al. | Appraisal of a new safety assessment method using the Petri nets for the machines safety | |
Punnoose | Risk Assessment and Management: ISM Code Perspective | |
Cebi et al. | Developing web based decision support system for evaluation occupational risks at shipyards | |
Rausand | System Analysis Failure Modes, Effects, and Criticality Analysis | |
Luxhøj et al. | Risk assessment of organizational factors in aviation systems | |
Abd Halim et al. | Study of human error from incident investigation in upstream facilities | |
Ayeko | Integrated Safety Investigation Methodology (ISIM)-Investigating for Risk Mitigation | |
Conachey | Development of machinery survey requirements based on reliability-centered maintenance | |
Pillay | Formal safety assessment of fishing vessels | |
Umar | Design for safety framework for offshore oil and gas platforms | |
Netherton | Reliability-Centered Maintenance | |
McNay | A structured, systemic methodology to improve maritime fire safety in machinery spaces | |
Thapa | Oil Gas Offshore Safety Case (Risk Assessment) | |
Tac et al. | Using Weka Data-Mining Analysis To Determine Ship Emergency Preparedness Level In Case Of Fire | |
Wilcox et al. | Methodology for risk-based technology applications to marine system safety | |
Hadidi et al. | A Markov-based model to mitigate human errors occurrence during maintenance activities in petrochemical systems | |
Wang | A review of design for safety methodology for large marine and offshore engineering systems | |
Olsen | Risk Assessment Techniques | |
Chybowski et al. | Remarks on human reliability with reference to marine power plant operation |