Khalaquzzaman et al., 2011 - Google Patents
Optimization of periodic testing frequency of a reactor protection system based on a risk-cost model and public risk perceptionKhalaquzzaman et al., 2011
- Document ID
- 9457664408419693704
- Author
- Khalaquzzaman M
- Kang H
- Kim M
- Seong P
- Publication year
- Publication venue
- Nuclear Engineering and Design
External Links
Snippet
Techniques for optimizing the frequency of periodic surveillance testing of nuclear power plant (NPP) safety systems have been receiving increased attention and growing importance because of the need to reduce system unavailability and maintenance cost …
- 230000000737 periodic 0 title abstract description 118
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GASES [GHG] EMISSION, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E30/00—Energy generation of nuclear origin
- Y02E30/30—Nuclear fission reactors
- Y02E30/40—Other aspects relating to nuclear fission
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0635—Risk analysis
-
- G—PHYSICS
- G21—NUCLEAR PHYSICS; NUCLEAR ENGINEERING
- G21D—NUCLEAR POWER PLANT
- G21D3/00—Control of nuclear power plant
- G21D3/001—Computer implemented control
- G21D2003/002—Core design; Core simulations
-
- G—PHYSICS
- G21—NUCLEAR PHYSICS; NUCLEAR ENGINEERING
- G21D—NUCLEAR POWER PLANT
- G21D1/00—Details of nuclear power plant
-
- G—PHYSICS
- G21—NUCLEAR PHYSICS; NUCLEAR ENGINEERING
- G21D—NUCLEAR POWER PLANT
- G21D3/00—Control of nuclear power plant
- G21D3/04—Safety arrangements
-
- G—PHYSICS
- G21—NUCLEAR PHYSICS; NUCLEAR ENGINEERING
- G21C—NUCLEAR REACTORS
- G21C17/00—Monitoring; Testing ; Maintaining
- G21C17/02—Devices or arrangements for monitoring coolant or moderator
-
- G—PHYSICS
- G21—NUCLEAR PHYSICS; NUCLEAR ENGINEERING
- G21C—NUCLEAR REACTORS
- G21C19/00—Arrangements for treating, for handling, or for facilitating the handling of, fuel or other materials which are used within the reactor, e.g. within its pressure vessel
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Khalaquzzaman et al. | Optimization of periodic testing frequency of a reactor protection system based on a risk-cost model and public risk perception | |
Himanen et al. | Risk‐Informed Regulation and Safety Management of Nuclear Power Plants—On the Prevention of Severe Accidents | |
Liu et al. | A mechanistic model of a PWR-based nuclear power plant in response to external hazard-induced station blackout accidents | |
Jang et al. | Development of an accident sequence precursor methodology and its application to significant accident precursors | |
Khalaquzzaman et al. | A model for estimation of reactor spurious shutdown rate considering maintenance human errors in reactor protection system of nuclear power plants | |
Yadav et al. | Utilizing FLEX Equipment for O&M Cost Reduction in Nuclear Power Plants | |
Ramuhalli et al. | An updated methodology for enhancing risk monitors with integrated equipment condition assessment | |
Kim et al. | Deterministic and risk-informed approaches for safety analysis of advanced reactors: Part II, Risk-informed approaches | |
Ayoub et al. | Simplified/harmonized PSA: a generic modeling framework | |
Miller et al. | US Nuclear Power Plant Performance Assessment Using the Versatile Economic Risk Tool (VERT) | |
Lee | Development of a Methodology for Evaluating Inter-Unit Dependencies at Multi-Unit Nuclear Power Plants | |
Sande et al. | The Benefits of Using a Risk-Informed Approach to Resolving GSI-191 | |
Ramuhalli et al. | Prototypic Enhanced Risk Monitor Framework and Evaluation-Advanced Reactor Technology Milestone: M3AT-15PN2301054 | |
Ma et al. | Risk-Informed Analysis for Accident Tolerant Fuel in Pressurized Water Reactors | |
Baron et al. | Safety and productivity trade-offs: managing nuclear reactor outages | |
Robbins | VIABILITY OF GENERATION RISK ASSESSMENT | |
Virtanen | Comparison between safety classification and risk importance measure of systems and components in a nuclear power plant | |
Liu et al. | Evaluation of Core Damage Frequency of High Flux Engineering Test Reactor From Internal Events | |
Arigia et al. | Analysis of Human-Induced Initiating Events in the LOOP Scenario | |
Gomez Cobo | Importance measures | |
Dolan et al. | Power Plant Designs | |
Kee et al. | Risk Applications in Commercial Nuclear Power | |
Wielenberg et al. | The Link between the Defence-in-Depth Concept and Extended PSA | |
Cepin et al. | Allowed outage time for test and maintenance-Optimization of safety | |
Samanta | Alternatives and considerations in defining strategies to optimize test and maintenance in NPPs |