Bhatia et al., 2019 - Google Patents
Dynamic risk-based inspection methodologyBhatia et al., 2019
- Document ID
- 879133362401052087
- Author
- Bhatia K
- Khan F
- Patel H
- Abbassi R
- Publication year
- Publication venue
- Journal of Loss Prevention in the Process Industries
External Links
Snippet
Inspection methodologies have evolved in the past decades to explore optimal interval and inspection methods. The American Petroleum Institute has published several standards such as API-510, API 653, API 570 and API-580 to assist in determining inspection intervals …
- 238000000034 method 0 title abstract description 78
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0639—Performance analysis
- G06Q10/06393—Score-carding, benchmarking or key performance indicator [KPI] analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0635—Risk analysis
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B23/00—Testing or monitoring of control systems or parts thereof
- G05B23/02—Electric testing or monitoring
- G05B23/0205—Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults
- G05B23/0259—Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults characterized by the response to fault detection
- G05B23/0283—Predictive maintenance, e.g. involving the monitoring of a system and, based on the monitoring results, taking decisions on the maintenance schedule of the monitored system; Estimating remaining useful life [RUL]
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B23/00—Testing or monitoring of control systems or parts thereof
- G05B23/02—Electric testing or monitoring
- G05B23/0205—Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults
- G05B23/0259—Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults characterized by the response to fault detection
- G05B23/0267—Fault communication, e.g. human machine interface [HMI]
- G05B23/0272—Presentation of monitored results, e.g. selection of status reports to be displayed; Filtering information to the user
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0631—Resource planning, allocation or scheduling for a business operation
- G06Q10/06312—Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B23/00—Testing or monitoring of control systems or parts thereof
- G05B23/02—Electric testing or monitoring
- G05B23/0205—Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults
- G05B23/0218—Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults characterised by the fault detection method dealing with either existing or incipient faults
- G05B23/0243—Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults characterised by the fault detection method dealing with either existing or incipient faults model based detection method, e.g. first-principles knowledge model
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation, e.g. linear programming, "travelling salesman problem" or "cutting stock problem"
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Bhatia et al. | Dynamic risk-based inspection methodology | |
Animah et al. | Condition assessment, remaining useful life prediction and life extension decision making for offshore oil and gas assets | |
Seo et al. | A risk-based inspection planning method for corroded subsea pipelines | |
Jain et al. | Process resilience analysis based data-driven maintenance optimization: Application to cooling tower operations | |
Leoni et al. | On risk-based maintenance: A comprehensive review of three approaches to track the impact of consequence modelling for predicting maintenance actions | |
De Sanctis et al. | Integration between RCM and RAM: a case study | |
Utne et al. | A structured approach to improved condition monitoring | |
Shafiee et al. | Development of a techno-economic framework for life extension decision making of safety critical installations | |
Ferreira et al. | Guidelines for life extension process management in oil and gas facilities | |
Khan et al. | Real-time monitoring and management of offshore process system integrity | |
Song et al. | Quantitative risk-based inspection approach for high-energy piping using a probability distribution function and modification factor | |
Kermanshachi et al. | Optimal pipeline maintenance strategies in the United States: Stochastic reliability analysis of gas pipeline network failures | |
Kurasov et al. | Substantiation of methods of improving safety of pipeline gas transportation | |
Priyanta et al. | The development of a risk-based maintenance flowchart to select the correct methodology to develop maintenance strategies of oil and gas equipment | |
Soares et al. | Risk-based inspection in the context of nuclear power plants | |
Helle | Five fatal flaws in API RP 581 | |
Geisbush et al. | Developing a Reliability Centered Maintenance Model for Large Diameter Pipeline Maintenance | |
Arena et al. | RBI-IOWs integrated approach to risk assessment: Methodological framework and application | |
Seneviratne et al. | In-service inspection of static mechanical equipment on offshore oil and gas production plants: A decision support framework | |
Melo et al. | A framework for risk-based integrity assessment of unpiggable pipelines subject to internal corrosion | |
Ratnayake | Utilization of piping inspection data for continuous improvement: a methodology to visualize coverage and finding rates | |
Animah et al. | Techno-economic feasibility assessment of life extension decision for safety critical assets | |
Khan et al. | Risk-based inspection and maintenance (RBIM) of power plants | |
Iqbal | A risk-based assessment of integrity management program for oil and gas pipelines: a regulatory perspective | |
Trasatti | Risk-Based Inspection and Integrity Management of Pipeline Systems |