Acworth, 2006 - Google Patents
Ultra-Long Offset? Subsea to Beach? Controls Technology-Case Study, Statoil SnøhvitAcworth, 2006
- Document ID
- 8003883361026759205
- Author
- Acworth W
- Publication year
- Publication venue
- SUT Subsea Control and Data Acquisition (SCADA) Conference
External Links
Snippet
The Snøhvit project in the Barents Sea is a milestone in subsea oil and gas development, with a record-breaking offset and all subsea facilities tied back to shore. The key elements of technology required to implement such a new development with a subsea production …
- 238000004519 manufacturing process 0 abstract description 16
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/02—Surface sealing or packing
- E21B33/03—Well heads; Setting-up thereof
- E21B33/035—Well heads; Setting-up thereof specially adapted for underwater installations
- E21B33/0355—Control systems, e.g. hydraulic, pneumatic, electric, acoustic, for submerged well heads
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/01—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells specially adapted for obtaining from underwater installations
- E21B43/017—Production satellite stations, i.e. underwater installations comprising a plurality of satellite well heads connected to a central station
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/01—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells specially adapted for obtaining from underwater installations
- E21B2043/0115—Drilling for or production of natural gas hydrate reservoirs; Drilling through or monitoring of formations containing gas hydrates
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/12—Means for transmitting measuring-signals or control signals from the well to the surface or from the surface to the well, e.g. for logging while drilling
- E21B47/122—Means for transmitting measuring-signals or control signals from the well to the surface or from the surface to the well, e.g. for logging while drilling by electromagnetic energy, e.g. radio frequency
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B41/00—Equipment or details not covered by groups E21B15/00 - E21B40/00
- E21B41/0007—Equipment or details not covered by groups E21B15/00 - E21B40/00 for underwater installations
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B17/00—Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
- E21B17/02—Couplings; joints
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/16—Enhanced recovery methods for obtaining hydrocarbons
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US6659180B2 (en) | Deepwater intervention system | |
NO326575B1 (en) | Hydrocarbon production system and vessel and method for intervention on subsea equipment | |
WO2017123386A1 (en) | Remotely-operated subsea control module | |
WO2018160982A1 (en) | Wireless control system for subsea devices | |
EP3995667A1 (en) | Subsea fluid handling system and method for long term storage of fluids in a subterranean void | |
Zuan et al. | Field development overview of Liuhua 11-1 and Liuhua 4-1 oil field | |
US20170026085A1 (en) | Resident ROV Signal Distribution Hub | |
Acworth | Ultra-Long Offset? Subsea to Beach? Controls Technology-Case Study, Statoil Snøhvit | |
US9720421B2 (en) | Subsea production system with multiple location master control station system | |
EP4298311B1 (en) | Fluid injection system and related methods | |
EP4053009A1 (en) | Buoy for injecting fluid in a subterranean void and methods for connecting and disconnecting a fluid passage from a vessel to the buoy | |
Gassert et al. | Deepwater Opportunities Extra Long Oil Tiebacks Developments | |
US12140001B2 (en) | Buoy for injecting fluid in a subterranean void and methods for connecting and disconnecting a fluid passage from a vessel to the buoy | |
Douglas et al. | Long-Offset Subsea Production Control Systems, Which Facilitate" Subsea-to-Beach" Field Developments | |
Mao | Creative Solution to Re-Establish Control of a Subsea Field with Failed Umbilical | |
Jarrell et al. | An Integrated Solution to Enable Development of 100 Km Deepwater Liquid Subsea Tiebacks | |
Robinson et al. | Integration of an intelligent completion into an existing subsea production system | |
Mahoney | Balmoral: conception to production | |
NO347106B1 (en) | Buoy for Injecting Fluid in a Subterranean Void and Methods for Connecting and Disconnecting a Fluid Passage from a Vessel to the Buoy | |
Davison et al. | Fast-Track Development of Deepwater Kuito Field, Offshore Angola | |
Denney | Ormen lange subsea production system | |
e Silva | Roncador Field: The Operational Experience on 1-RJS-436 A: The Pilot Well | |
CN112039189A (en) | Underwater electricity distribution system for chain wellhead distribution | |
Gharaibah et al. | Flow Assurance Solutions and Control Systems for Long Step Out Subsea Production Systems | |
Rodda et al. | A Design Review of Diverless Subsea Production Systems |