Veeningen et al., 2012 - Google Patents
From field test to successful integration of broadband drillstring system for offshore extended reach wellsVeeningen et al., 2012
- Document ID
- 7391461312956499451
- Author
- Veeningen D
- Palmer J
- Steinicke G
- Saenz J
- Hansen T
- Publication year
- Publication venue
- SPE/IADC Drilling Conference and Exhibition
External Links
Snippet
High-angle offshore wells in Trinidad and Tobago are characterized by hole cleaning challenges, wellbore instability, and downhole vibrations damaging both tools and drill bits. To reduce operational risks and improve project economics, the operator selected a multi …
- 238000004140 cleaning 0 abstract description 11
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B17/00—Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
- E21B17/02—Couplings; joints
- E21B17/028—Electrical or electro-magnetic connections
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B17/00—Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
- E21B17/02—Couplings; joints
- E21B17/04—Couplings; joints between rod or the like and bit or between rod and rod or the like
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/04—Directional drilling
- E21B7/046—Directional drilling horizontal drilling
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/12—Means for transmitting measuring-signals or control signals from the well to the surface or from the surface to the well, e.g. for logging while drilling
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/02—Subsoil filtering
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/14—Obtaining from a multiple-zone well
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B41/00—Equipment or details not covered by groups E21B15/00 - E21B40/00
- E21B41/0035—Apparatus or methods for multilateral well technology, e.g. for the completion of or workover on wells with one or more lateral branches
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/01—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells specially adapted for obtaining from underwater installations
- E21B43/017—Production satellite stations, i.e. underwater installations comprising a plurality of satellite well heads connected to a central station
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B44/00—Automatic control systems specially adapted for drilling operations, i.e. self-operating systems which function to carry out or modify a drilling operation without intervention of a human operator, e.g. computer-controlled drilling systems; Systems specially adapted for monitoring a plurality of drilling variables or conditions
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B21/00—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B19/00—Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B4/00—Drives used in the borehole
- E21B4/04—Electric drives
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B25/00—Apparatus for obtaining or removing undisturbed cores, e.g. core barrels, core extractors
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2016168957A1 (en) | Automated trajectory and anti-collision for well planning | |
Edwards et al. | A summary of wired drill pipe field trials and deployments in bp | |
Pink et al. | Building an automated drilling system where surface machines are controlled by downhole and surface data to optimize the well construction process | |
Veeningen | Novel high speed telemetry system with measurements along the string mitigate drilling risk and improve drilling efficiency | |
Schils et al. | The use of wired drillpipe technology in a complex drilling environment increased drilling efficiency and reduced well times | |
Jeffery et al. | Data while tripping dwt: Keeping the light on downhole | |
Nygård et al. | Improved drilling operations with wired drill pipe and along-string measurements–learnings and highlights from multiple north sea deployments | |
Rae et al. | Understanding Torque and Drag: Best Practices and Lessons Learnt from the Captain Field's Extended Reach Wells | |
Veeningen et al. | From field test to successful integration of broadband drillstring system for offshore extended reach wells | |
Allen et al. | Step-change improvements with wired-pipe telemetry | |
Bello et al. | A simplified framework and performance analysis for while-drilling telemetry systems in underbalanced drilling operations | |
Pixton et al. | Drillstring network 2.0: An enhanced drillstring network based on 100 wells of experience | |
Sehsah et al. | Intelligent drilling system: expanding the envelope of wired drill pipe | |
Larsen et al. | The Automated Drilling Pilot on Statfjord C | |
Ali et al. | High speed telemetry drill pipe network optimizes drilling dynamics and wellbore placement | |
Craig et al. | Drillstring network 2.0: An enhanced drillstring network based on 100 wells of experience | |
Veeningen et al. | Transformational reduction in non-productive time through implementation of broadband networked drill-string and modified drilling practices in an extended reach drilling campaign | |
Salomone et al. | First Wired Drill Pipe Deployment in Adriatic Sea | |
Al-Ebrahim et al. | Using e-coiled tubing for production logging while n2 lifting in horizontal/deviated exploratory well | |
Monden et al. | Operation Support Centers-Real Time Drilling Optimization and Risk Mitigation | |
Reeves et al. | Unique acoustic telemetry network with distributed pressure measurement nodes enables accurate real-time analysis of sweep effectiveness | |
Nygaard et al. | A step change in total system approach through wired drillpipe technology | |
Jerez et al. | Offshore west Africa deepwater ERD: drilling optimization case history | |
US20230193739A1 (en) | Computerized method for performing work-flow drilling operation management for offshore drilling operations | |
Akue et al. | Openhole Tractor and High-Tension Conveyance Package Reduces HSE Risk and Saves 3 Days of Rig Time for Formation Fluid Sampling in a Highly Deviated Well |