Pollak et al., 2019 - Google Patents
Deep shaft sinking through limestone, mudstone, and halitePollak et al., 2019
- Document ID
- 6070008023630006816
- Author
- Pollak S
- Mahoney T
- Capes G
- Publication year
- Publication venue
- ISRM Congress
External Links
Snippet
Abstract The Jansen Project is a greenfield potash mine development being undertaken by BHP in Saskatchewan, Canada. The project, which remains subject to sanction by the BHP Board for full construction and execution, includes a pair of shafts which have been sunk to a …
- 235000019738 Limestone 0 title abstract description 22
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D21/00—Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection
- E21D21/0026—Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection characterised by constructional features of the bolts
- E21D21/004—Bolts held in the borehole by friction all along their length, without additional fixing means
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/16—Enhanced recovery methods for obtaining hydrocarbons
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21C—MINING OR QUARRYING
- E21C41/00—Methods of underground or surface mining; Lay-outs therefor
- E21C41/16—Methods of underground mining; Layouts therefor
- E21C41/18—Methods of underground mining; Layouts therefor for brown or hard coal
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/74—Means for anchoring structural elements or bulkheads
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/14—Lining predominantly with metal
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D15/00—Props; Chocks, e.g. made of flexible containers filled with backfilling material
- E21D15/48—Chocks or the like
- E21D15/483—Chocks or the like made of flexible containers, e.g. inflatable, with or without reinforcement, e.g. filled with water, backfilling material or the like
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D23/00—Mine roof supports for step- by- step movement, e.g. in combination with provisions for shifting of conveyors, mining machines, or guides therefor
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D33/00—Testing foundations or foundation structures
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/02—Retaining or protecting walls
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D1/00—Investigation of foundation soil in situ
- E02D1/02—Investigation of foundation soil in situ before construction work
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F17/00—Methods or devices for use in mines or tunnels, not covered elsewhere
- E21F17/103—Dams, e.g. for ventilation
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Ghorbani et al. | A critical review on the developments of rock support systems in high stress ground conditions | |
Hoek | Support for very weak rock associated with faults and shear zones | |
Rahimi et al. | Ground behaviour analysis, support system design and construction strategies in deep hard rock mining–Justified in Western Australian's mines | |
Kang et al. | Investigation on support pattern of a coal mine roadway within soft rocks—a case study | |
Oliveira et al. | Tunnel support for stress induced failures in Hawkesbury Sandstone | |
Babets et al. | Implementation of probabilistic approach to rock mass strength estimation while excavating through fault zones | |
Zhao et al. | Large deformation control of deep roadways in fractured hard rock based on cracking-restraint method | |
Kang et al. | Deformation characteristics and reinforcement technology for entry subjected to mining-induced stresses | |
Yu et al. | Investigations of support failure and combined support for soft and fractured coal-rock tunnel in tectonic belt | |
Hadjigeorgiou et al. | Assessment of the influence of drift orientation on observed levels of squeezing in hard rock mines | |
Ma et al. | Investigation on support pattern of a coal mine roadway under dynamic pressure of mining-a case study | |
Varden et al. | Design approach for squeezing ground | |
Frenelus et al. | An Insight from Rock Bolts and Potential Factors Influencing Their Durability and the Long-Term Stability of Deep Rock Tunnels. Sustainability 2022, 14, 10943 | |
Pollak et al. | Deep shaft sinking through limestone, mudstone, and halite | |
Wang et al. | Large‐Deformation Failure Mechanism of Coal‐Feeder Chamber and Construction of Wall‐Mounted Coal Bunker in Underground Coal Mine with Soft, Swelling Floor Rocks | |
Zhang et al. | Study on the overlying strata movements and stability control of the retained goaf-side gateroad | |
Edelbro et al. | Spiling in unstable tunnel sections–a benchmark and case study review | |
Payne | Crinum Mine, 15 longwalls 40 million tonnes 45 roof falls-What did we learn? | |
Xie et al. | Automatic Roadway Backfilling of Caving Gangue for Cutting Roofs by Combined Support on Gob‐Side Entry Retaining with No‐Pillars: A Case Study | |
Zhou et al. | Bolting control of a coal roadway under multi-seam mining–a case study | |
e Sousa | Learning with accidents and damage associated to underground works | |
Brechtel et al. | The evaluation of cemented rockfill spans at the Murray mine | |
Wieland et al. | Potentially active faults in the foundations of large dams part I: vulnerability of dams to seismic movements in dam foundation | |
Warren et al. | Ground support design curves: squeezing ground in Nevada | |
Fernandez et al. | Design and implementation of a damage assessment system at Argyle Diamond ’s block cave project |