The construction industry is plagued by risk and often suffers poor performance as a result. Therefore, risk management is very important for construction project to achieve its goal. The risk evaluation is the basic work of risk management. There are a number of risk evaluation …
- 238000011156 evaluation 0 title abstract description 46
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0639—Performance analysis
- G06Q10/06393—Score-carding, benchmarking or key performance indicator [KPI] analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F17/00—Digital computing or data processing equipment or methods, specially adapted for specific functions
- G06F17/30—Information retrieval; Database structures therefor; File system structures therefor
- G06F17/3061—Information retrieval; Database structures therefor; File system structures therefor of unstructured textual data
- G06F17/30705—Clustering or classification
- G06F17/3071—Clustering or classification including class or cluster creation or modification
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0635—Risk analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06N—COMPUTER SYSTEMS BASED ON SPECIFIC COMPUTATIONAL MODELS
- G06N5/00—Computer systems utilising knowledge based models
- G06N5/02—Knowledge representation
- G06N5/022—Knowledge engineering, knowledge acquisition
- G06N5/025—Extracting rules from data
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06N—COMPUTER SYSTEMS BASED ON SPECIFIC COMPUTATIONAL MODELS
- G06N3/00—Computer systems based on biological models
- G06N3/02—Computer systems based on biological models using neural network models
- G06N3/08—Learning methods
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F17/00—Digital computing or data processing equipment or methods, specially adapted for specific functions
- G06F17/30—Information retrieval; Database structures therefor; File system structures therefor
- G06F17/30286—Information retrieval; Database structures therefor; File system structures therefor in structured data stores
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06N—COMPUTER SYSTEMS BASED ON SPECIFIC COMPUTATIONAL MODELS
- G06N99/00—Subject matter not provided for in other groups of this subclass
- G06N99/005—Learning machines, i.e. computer in which a programme is changed according to experience gained by the machine itself during a complete run
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06N—COMPUTER SYSTEMS BASED ON SPECIFIC COMPUTATIONAL MODELS
- G06N5/00—Computer systems utilising knowledge based models
- G06N5/04—Inference methods or devices
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation, e.g. computer aided management of electronic mail or groupware; Time management, e.g. calendars, reminders, meetings or time accounting
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104018831B (en) | A kind of fractured well reservoir evaluation methods | |
Chandra et al. | Knowledge mining from student data | |
CN105913196A (en) | Navigation channel rectifying social stability risk automatically analyzing method and system | |
CN110472363B (en) | Surrounding rock deformation grade prediction method and system suitable for high-speed railway tunnel | |
CN106355540A (en) | Small- and medium-sized reservoir dam safety evaluating method based on GRA-BP (grey relational analysis and back propagation) neural network | |
CN110895729A (en) | Prediction method for construction period of power transmission line engineering | |
CN114881396A (en) | Tunnel collapse risk assessment method based on AHP and TOPSIS | |
CN107295537A (en) | A kind of method and system for wireless sensor network reliability of testing and assessing | |
Che et al. | Few-shot structural repair decision of civil aircraft based on deep meta-learning | |
Song et al. | Classifying the surrounding rock of tunnel face using machine learning | |
CN114912772A (en) | Urban right transparency differential evaluation system matching method and system based on urban economic classification analysis | |
Wen | Construction project risk evaluation based on rough sets and artificial neural networks | |
CN110727801A (en) | Ontology-based fuzzy evaluation search engine advertisement optimization method | |
Hanifa et al. | Detection of unstable approaches in flight track with recurrent neural network | |
CN109614584B (en) | Reconstruction method of resource logging data | |
Gunawan et al. | Information Systems Students' Study Performance Prediction Using Data Mining Approach | |
Bhosale et al. | Use of Artificial Neural Network in Construction Management | |
CN112950016B (en) | Multi-parameter fusion unconventional oil and gas resource dessert evaluation method based on deep learning | |
Sun et al. | The use of neural network in defense audit nonlinear dynamic processing under the background of big data | |
Zhao et al. | Analysis of Risk-Based Airport Passenger Classification with PSO-BP Neural Network | |
Xiaorong et al. | Research on Lost Circulation Risk Intelligent Identification and Processing System Based on CBR | |
Li et al. | The safety evaluation method of steel enterprises based on deep learning | |
Wu | Construction and Applicaton of Grey Concept Lattices | |
Cai et al. | Application of fund analysis model to identify key factors in construction projects | |
Li | Construction and Verification of Academic Performance Early Warning Model based on PSO-XGBoost Algorithm |