Chimara et al., 2018 - Google Patents
Engineered Wellbore Strengthening Application Enables Successful Drilling of Challenging WellsChimara et al., 2018
- Document ID
- 5142519440285802243
- Author
- Chimara G
- Calder A
- Amer W
- Leslie P
- Publication year
- Publication venue
- SPE Trinidad and Tobago Section Energy Resources Conference?
External Links
Snippet
Four wells were successfully drilled and completed, but high drilling fluid densities (1.95 to 1.98 SG) were necessary to maintain wellbore stability in the overburden section immediately above the depleted reservoir. The estimated hydrostatic overbalance from the …
- 238000005728 strengthening 0 title abstract description 39
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/02—Subsoil filtering
- E21B43/04—Gravelling of wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/25—Methods for stimulating production
- E21B43/26—Methods for stimulating production by forming crevices or fractures
- E21B43/267—Methods for stimulating production by forming crevices or fractures reinforcing fractures by propping
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/10—Sealing or packing boreholes or wells in the borehole
- E21B33/13—Methods or devices for cementing, for plugging holes, crevices, or the like
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/02—Surface sealing or packing
- E21B33/03—Well heads; Setting-up thereof
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B21/00—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
- E21B21/06—Arrangements for treating drilling fluids outside the borehole
- E21B21/063—Arrangements for treating drilling fluids outside the borehole by separating components
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B21/00—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
- E21B21/08—Controlling or monitoring pressure or flow of drilling fluid, e.g. automatic filling of boreholes, automatic control of bottom pressure
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/16—Enhanced recovery methods for obtaining hydrocarbons
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B21/00—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
- E21B21/06—Arrangements for treating drilling fluids outside the borehole
- E21B21/062—Arrangements for treating drilling fluids outside the borehole by mixing components
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B41/00—Equipment or details not covered by groups E21B15/00 - E21B40/00
- E21B41/005—Waste disposal systems
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B34/00—Valve arrangements for boreholes or wells
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Whitfill | Lost circulation material selection, particle size distribution and fracture modeling with fracture simulation software | |
Aston et al. | Drilling fluids for wellbore strengthening | |
Song et al. | Preventing mud losses by wellbore strengthening | |
Whitfill et al. | All lost-circulation materials and systems are not created equal | |
Friedheim et al. | Innovative fiber solution for wellbore strengthening | |
Savari et al. | Managing lost circulation in highly fractured, vugular formations: Engineered usage of high fluid loss squeeze and reticulated foam lost circulation materials | |
Savari et al. | 'Engineering'Design of Lost Circulation Materials (LCMs) is More than Adding a Word | |
Alrasheed et al. | Deployment of fully automated MPD and manganese tetroxide mud system to drill ultra-narrow mud window in HPHT gas wells | |
Chimara et al. | Engineered Wellbore Strengthening Application Enables Successful Drilling of Challenging Wells | |
Abou-Sayed et al. | Design considerations in drill cuttings re-injection through downhole fracturing | |
Murray et al. | Case study-ECD management strategy solves lost circulation issues on complex salt diapirs/paleocene reservoir | |
Azwar et al. | First Application of a Novel Self-Healing and CO2-Resistant Cement on a Deepwater Cementing Operation | |
Bannerman et al. | New API practices for isolating potential flow zones during drilling and cementing operations | |
Arab et al. | Managed Pressure Cementing MPC Technique Applied with Liner Cementing in Narrow Pore Pressure and Fracture Gradient Window | |
Santos et al. | No-damage drilling: how to achieve this challenging goal? | |
Majidi et al. | The application of wellbore strengthening to achieve zonal isolation | |
Fomenkov et al. | Positive Experience Using Foam Cementing Technology for Production Casing Cementing in the Volga-Ural Field | |
O'Leary et al. | Cementing deepwater, low-temperature Gulf of Mexico formations prone to shallow flows | |
Pillai et al. | Industry first openhole alternate path gravel pack completion in hpht environment: fluid development and case history | |
Ashena et al. | Curing Lost Circulation in Fractured Reservoirs Using a Level-Off Cement Plugging Method-Case Studies in Drilling and Workover Applications | |
Elahifar et al. | Innovative Strategies for Well Integrity in Offshore Top-Hole Cementing: Laboratory-Validated Success in Shallow Gas Mitigation | |
Sanchez et al. | Managed-Pressure Cementing in HPHT Well with Very Narrow Operating Pressure Window | |
Gadiyar et al. | A New Milestone in Open-Hole Gavel Pack (OHGP): World's First Managed Pressure Alternate Path OHGP with a Novel Oil-Based Gravel Pack Carrier Fluid | |
Colaianni | Strict control of ECD in DW exploratory well using a 2nd generation continuous circulation system | |
Alimuddin et al. | Reduction of Subsurface Losses and Non-Productive Time During Deepwater Drilling by Application of Wellbore Strengthening Mechanism–A Strategic Approach |