Awaid et al., 2014 - Google Patents
ESP well surveillance using pattern recognition analysis, oil wells, petroleum development OmanAwaid et al., 2014
- Document ID
- 504349612078455630
- Author
- Awaid A
- Al-Muqbali H
- Al-Bimani A
- Al-Yazeedi Z
- Al-Sukaity H
- Al-Harthy K
- Baillie A
- Publication year
- Publication venue
- IPTC 2014: International Petroleum Technology Conference
External Links
Snippet
PDO is managing some 850 Electrical Submersible Pump (ESP) systems scattered across North & South fields, which is continue to grow in the next five years business plan. All ESP wells have real time down-hole sensors that measures intake and discharge pressures …
- 238000003909 pattern recognition 0 title abstract description 49
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/12—Methods or apparatus for controlling the flow of the obtained fluid to or in wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/10—Locating fluid leaks, intrusions or movements
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/02—Surface sealing or packing
- E21B33/03—Well heads; Setting-up thereof
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/02—Subsoil filtering
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/12—Means for transmitting measuring-signals or control signals from the well to the surface or from the surface to the well, e.g. for logging while drilling
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/14—Obtaining from a multiple-zone well
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B23/00—Testing or monitoring of control systems or parts thereof
- G05B23/02—Electric testing or monitoring
- G05B23/0205—Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B34/00—Valve arrangements for boreholes or wells
- E21B34/06—Valve arrangements for boreholes or wells in wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B41/00—Equipment or details not covered by groups E21B15/00 - E21B40/00
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F11/00—Error detection; Error correction; Monitoring
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Awaid et al. | ESP well surveillance using pattern recognition analysis, oil wells, petroleum development Oman | |
US20240352839A1 (en) | Oilfield system | |
AU2013296746B2 (en) | Monitoring, diagnosing and optimizing gas lift operations | |
US9470085B2 (en) | Computer-implemented method, device, and computer-readable medium for visualizing one or more parameters associated with wells at a well site | |
Ambrus et al. | Self-learning probabilistic detection and alerting of drillstring washout and pump failure incidents during drilling operations | |
Han et al. | Real-time monitoring and diagnosis of electrical submersible pump | |
Jamal et al. | Effective well management in Sabriyah intelligent digital oilfield | |
El Gindy et al. | Monitoring & surveillance improve ESP operation and reduce workover frequency | |
US11021949B2 (en) | Timeline visualization of events for monitoring well site drilling operations | |
Veneruso et al. | Reliability qualification testing for permanently installed wellbore equipment | |
Villalobos Leon et al. | Data management for appropriate ESP selection, procedures and operation results in a significant reduction of early failures | |
Cramer et al. | Less Footprints in the Snow for Salym Field in Western Siberia | |
Al-Enezi et al. | Value Generated Through Automated Workflows Using Digital Oilfield Concepts: Case Study | |
Gagner et al. | An ESP Lift Reliability Process: Making the Most of Limited Manpower and Field Experience to Promote Field Optimization–Case Study | |
Giden et al. | Re-development of an onshore mature oil field to double gross production by the use of sensor-equipped electrical submersible pumps | |
Khalid et al. | Automated real time ESP performance monitoring and optimization case study | |
Abdul Aziz et al. | World First Commercial Application of Permanent Interventionless Monitoring Using Intelligent Inflow Gas Tracer Technology | |
Rotramel et al. | A pilot test of continuous bottom hole pressure monitoring for production optimization of coalbed methane in the Raton Basin | |
Putra et al. | Artificial Lift Real-Time Monitoring Digitalization Method: An Advanced Approach with Artificial Intelligence to Achieve Efficient Well Surveillance by Utilizing SCADA | |
Reeves et al. | Gas lift automation: Real time data to desktop for optimizing an offshore GOM platform | |
Al Fakih et al. | Reducing Time Losses in Well Construction Operations by Improving Early Detection through a Digital Operation Integrity Center and Digital Aids | |
Nuñez et al. | Integrated Methodology to Optimizes Production and Performance of Electrosubmersible Pump System in Shushufindi Field | |
Abdel-Basset et al. | How real-time surveillance improves the ESP run life, uptime and reduces production deferment | |
Al-Mutawa et al. | Digital oilfield technologies enhance production in ESP wells | |
Wiese et al. | Improving Well-Work Efficiency and Mitigating Risk Exposure by Utilizing Digital Slickline in the Kuparuk River Unit, North Slope, Alaska |