Valmiki et al., 2018 - Google Patents
A study on simulation methods for AGV fleet size estimation in a flexible manufacturing systemValmiki et al., 2018
View PDF- Document ID
- 493665131344458589
- Author
- Valmiki P
- Reddy A
- Panchakarla G
- Kumar K
- Purohit R
- Suhane A
- Publication year
- Publication venue
- Materials Today: Proceedings
External Links
Snippet
This paper presents a study on the estimation of fleet size of Automated Guided Vehicle (AGV). Determination of AGV fleet size plays a decisive role on the performance of job shop environment. Simulation methods are studied in detail for the estimation of AGV fleet size in …
- 238000004088 simulation 0 title abstract description 24
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation, e.g. linear programming, "travelling salesman problem" or "cutting stock problem"
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Programme-control systems
- G05B19/02—Programme-control systems electric
- G05B19/418—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM]
- G05B19/41865—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM] characterised by job scheduling, process planning, material flow
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/08—Logistics, e.g. warehousing, loading, distribution or shipping; Inventory or stock management, e.g. order filling, procurement or balancing against orders
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B2219/00—Program-control systems
- G05B2219/30—Nc systems
- G05B2219/50—Machine tool, machine tool null till machine tool work handling
- G05B2219/50109—Soft approach, engage, retract, escape, withdraw path for tool to workpiece
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B2219/00—Program-control systems
- G05B2219/30—Nc systems
- G05B2219/32—Operator till task planning
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05D—SYSTEMS FOR CONTROLLING OR REGULATING NON-ELECTRIC VARIABLES
- G05D1/00—Control of position, course or altitude of land, water, air, or space vehicles, e.g. automatic pilot
- G05D1/02—Control of position or course in two dimensions
- G05D1/021—Control of position or course in two dimensions specially adapted to land vehicles
- G05D1/0287—Control of position or course in two dimensions specially adapted to land vehicles involving a plurality of land vehicles, e.g. fleet or convoy travelling
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Valmiki et al. | A study on simulation methods for AGV fleet size estimation in a flexible manufacturing system | |
Murakami | Time-space network model and MILP formulation of the conflict-free routing problem of a capacitated AGV system | |
Rahman et al. | An integrated approach for line balancing and AGV scheduling towards smart assembly systems | |
Chien et al. | A novel route selection and resource allocation approach to improve the efficiency of manual material handling system in 200-mm wafer fabs for industry 3.5 | |
Ho et al. | A multiple-attribute method for concurrently solving the pickup-dispatching problem and the load-selection problem of multiple-load AGVs | |
CN113359702B (en) | Intelligent warehouse AGV operation optimization scheduling method based on water wave optimization-tabu search | |
Correia et al. | Implementing an AGV system to transport finished goods to the warehouse | |
Hwang et al. | Development of dispatching rules for automated guided vehicle systems | |
Teck et al. | A bi-level memetic algorithm for the integrated order and vehicle scheduling in a RMFS | |
Cai et al. | Multiobjective optimization for autonomous straddle carrier scheduling at automated container terminals | |
Angra et al. | Comparison and evaluation of job selection dispatching rules for integrated scheduling of multi-load automatic guided vehicles serving in variable sized flexible manufacturing system layouts: a simulation study | |
King et al. | A review of automated guided-vehicle systems design and scheduling | |
Ilić | Analysis of the number of automated guided vehicles required in flexible manufacturing systems | |
Li et al. | Design and simulation analysis of PDER: A multiple-load automated guided vehicle dispatching algorithm | |
JP4377792B2 (en) | Vehicle allocation plan creation device, vehicle allocation plan creation method, computer program, and computer-readable recording medium | |
Nishida et al. | Just-in-Time routing and scheduling for multiple automated guided vehicles | |
JP7424957B2 (en) | Transport vehicle control system, operation management device, and transport route generation method | |
JP7515112B2 (en) | Transport control system, transport system, component mounting system, and transport control method | |
JP7215490B2 (en) | Transfer work control device, method and program | |
JPH05135070A (en) | Delivery scheduling device | |
CN111784219B (en) | Warehouse flexible production method and device, and computer-readable storage medium | |
JP3534392B2 (en) | Optimal delivery planning method and system | |
Ujvari et al. | Advanced manufacturing simulation: minor system details can be major issues in the real world | |
Mohamad et al. | Optimization of material transportation assignment for automated guided vehicle (AGV) system | |
Erdogan et al. | Developing an optimization model to determine fleet size of Automated Guided Vehicle |