Bolshakov, 2013 - Google Patents
Regression-based Daugava river flood forecasting and monitoringBolshakov, 2013
View PDF- Document ID
- 4760587775940612101
- Author
- Bolshakov V
- Publication year
- Publication venue
- Information Technology and Management Science
External Links
Snippet
The paper discusses the application of linear and symbolic regression to forecast and monitor river floods. Main tasks of the research are to find an analytical model of river flow and to forecast it. The challenges are a small set of flow measurements and a small number …
- 238000005259 measurement 0 abstract description 23
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0639—Performance analysis
- G06Q10/06393—Score-carding, benchmarking or key performance indicator [KPI] analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06N—COMPUTER SYSTEMS BASED ON SPECIFIC COMPUTATIONAL MODELS
- G06N99/00—Subject matter not provided for in other groups of this subclass
- G06N99/005—Learning machines, i.e. computer in which a programme is changed according to experience gained by the machine itself during a complete run
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B13/00—Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion
- G05B13/02—Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric
- G05B13/04—Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric involving the use of models or simulators
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06N—COMPUTER SYSTEMS BASED ON SPECIFIC COMPUTATIONAL MODELS
- G06N7/00—Computer systems based on specific mathematical models
- G06N7/005—Probabilistic networks
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01N—INVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
- G01N33/00—Investigating or analysing materials by specific methods not covered by the preceding groups
- G01N33/48—Investigating or analysing materials by specific methods not covered by the preceding groups biological material, e.g. blood, urine; Haemocytometers
- G01N33/50—Chemical analysis of biological material, e.g. blood, urine; Testing involving biospecific ligand binding methods; Immunological testing
- G01N33/5005—Chemical analysis of biological material, e.g. blood, urine; Testing involving biospecific ligand binding methods; Immunological testing involving human or animal cells
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B13/00—Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion
- G05B13/02—Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric
- G05B13/0265—Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric the criterion being a learning criterion
- G05B13/027—Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric the criterion being a learning criterion using neural networks only
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06N—COMPUTER SYSTEMS BASED ON SPECIFIC COMPUTATIONAL MODELS
- G06N5/00—Computer systems utilising knowledge based models
- G06N5/04—Inference methods or devices
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06N—COMPUTER SYSTEMS BASED ON SPECIFIC COMPUTATIONAL MODELS
- G06N3/00—Computer systems based on biological models
- G06N3/02—Computer systems based on biological models using neural network models
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B17/00—Systems involving the use of models or simulators of said systems
- G05B17/02—Systems involving the use of models or simulators of said systems electric
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation, e.g. linear programming, "travelling salesman problem" or "cutting stock problem"
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01N—INVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
- G01N1/00—Sampling; Preparing specimens for investigation
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Pechlivanidis et al. | Catchment scale hydrological modelling: A review of model types, calibration approaches and uncertainty analysis methods in the context of recent developments in technology and applications | |
Shrestha et al. | Data‐driven approaches for estimating uncertainty in rainfall‐runoff modelling | |
Bolshakov | Regression-based Daugava river flood forecasting and monitoring | |
Fan et al. | Development of PCA-based cluster quantile regression (PCA-CQR) framework for streamflow prediction: Application to the Xiangxi river watershed, China | |
CN117116382B (en) | Water quality space-time prediction method and system for water-bearing lake under influence of diversion engineering | |
Lai et al. | A study on bayesian principal component analysis for addressing missing rainfall data | |
Culley et al. | Identifying critical climate conditions for use in scenario-neutral climate impact assessments | |
Ferreira et al. | Objective functions used as performance metrics for hydrological models: state-of-the-art and critical analysis | |
Watson-Parris et al. | Model calibration using ESEm v1. 1.0–an open, scalable Earth system emulator | |
CN117993305B (en) | Dynamic evaluation method for river basin land utilization and soil erosion relation | |
Azarnivand et al. | Analysing the uncertainty of modelling hydrologic states of AWRA-L–understanding impacts from | |
Zhang et al. | A weighted ensemble of regional climate projections for exploring the spatiotemporal evolution of multidimensional drought risks in a changing climate | |
Shaloo et al. | Reference evapotranspiration prediction using machine learning models: An empirical study from minimal climate data | |
Ahmadi et al. | Assessment of input data selection methods for BOD simulation using data-driven models: a case study | |
Ehteram et al. | Drought prediction using ensemble models | |
Shrestha et al. | Encapsulation of parametric uncertainty statistics by various predictive machine learning models: MLUE method | |
Daechini et al. | Performance assessment of five water balance models for runoff simulation in the Gorganrood watershed. | |
Choubey et al. | Time series data mining in real time surface runoff forecasting through Support Vector Machine | |
Kadri et al. | Comparison between NARX-NN and HEC-HMS models to simulate Wadi Seghir catchment runoff events in Algerian northern | |
Sánchez et al. | Computer-Based Model Calibration and Uncertainty Analysis: Terms and Concepts | |
Pianosi et al. | ANN-based representation of parametric and residual uncertainty of models | |
TYO et al. | Analysis, monitoring and forecasting financial stability | |
Abd Samad et al. | Deterministic Mutation-Based Algorithm for Model Structure Selection in Discrete-Time System Identification | |
DeChant | Quantifying the impacts of initial condition and model uncertainty on hydrological forecasts | |
Douak et al. | Design of a multiblock general regression neural network for wind speed prediction in Algeria |