Li et al., 2018 - Google Patents
Probabilistic Reliability Assessment of Entergy transmission systemLi et al., 2018
- Document ID
- 4116147923273480273
- Author
- Li M
- Kolluri S
- Agarwal S
- Publication year
- Publication venue
- 2018 IEEE International Conference on Probabilistic Methods Applied to Power Systems (PMAPS)
External Links
Snippet
This paper presents probabilistic reliability assessment (PRA) of Energy transmission system. N-1 and N-2 contingency screening is performed over Energy transmission system. Both outage probability and the severity of its impact, including overloads and/or low voltage …
- 230000005540 biological transmission 0 title abstract description 29
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
- G01R31/08—Locating faults in cables, transmission lines, or networks
- G01R31/088—Aspects of digital computing
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/008—Circuit arrangements for ac mains or ac distribution networks involving trading of energy or energy transmission rights
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Veloza et al. | Analysis of major blackouts from 2003 to 2015: Classification of incidents and review of main causes | |
Ni et al. | Online risk-based security assessment | |
Li et al. | Probabilistic transmission planning | |
US20130218494A1 (en) | Systems for Real-Time Available Transfer Capability Determination of Large Scale Power Systems | |
US20180314769A1 (en) | Systems for real-time available delivery capability determination of large-scale distribution networks | |
Bhatt et al. | Assessing vulnerability to cascading outages | |
Kemabonta et al. | A syncretistic approach to grid reliability and resilience: Investigations from Minnesota | |
Cebrian et al. | Hybrid method to assess sensitive process interruption costs due to faults in electric power distribution networks | |
Roland et al. | Reliability prediction of Port Harcourt electricity distribution network using NEPLAN | |
Li et al. | Probabilistic Reliability Assessment of Entergy transmission system | |
Pottonen | A method for the probabilistic security analysis of transmission grids | |
Li et al. | Probabilistic planning of transmission systems: Why, how and an actual example | |
Papic et al. | Prevention of NERC C3 category outages in Idaho power's network: Risk based methodology and practical application | |
Bruvik et al. | Probabilistic reliability analysis in the Norwegian transmission system | |
Zhang et al. | Utility experience performing probabilistic risk assessment for operational planning | |
Bell | Issues in integration of risk of cascading outages into utility reliability standards | |
Mwale et al. | The Southern African Power Pool (SAPP) Steady State Security Assessment Using Contigency Analysis | |
Kintner-Meyer | Towards Metrics for Resilience Characterization and Challenges in Valuing Distribution System Resilience Improvements | |
Phyu et al. | Loss reduction and reliability improvement of industrial distribution system through network reconfiguration | |
Bhandari et al. | Ranking of bulk transmission assets for maintenance decisions | |
Hamoud | Ranking components of high voltage switching and transformer stations | |
Merrill et al. | System Stress and Cascading Blackouts | |
Camargo et al. | Impact assessment of substation contingencies in power systems | |
Ekisheva et al. | North American AC circuit outages initiated by transmission equipment failures and human error | |
Wang et al. | Real time probabilistic security risk assessment at an EMS |