(This abstract was borrowed from another version of this item.)"> (This abstract was borrowed from another version of this item.)">
Nothing Special   »   [go: up one dir, main page]

IDEAS home Printed from https://ideas.repec.org/a/eee/jfinec/v18y1987i1p7-27.html
   My bibliography  Save this article

Time to build, option value, and investment decisions

Author

Listed:
  • Majd, Saman
  • Pindyck, Robert S.
Abstract
Many investment projects have the following characteristics: (i) spending decisions and cash outlays occur sequentially over time, (ii) there is a maximum rate at which outlays and construction can proceed -- it takes "time to build," and (iii) the project yields no cash return until it is actually completed. Furthermore, the pattern of investment outlays is usually flexible,and can be adjusted as new information arrives. For such projects traditional discounted cash flow criteria, which treat the spending pattern as fixed, are inadequate as a guide for project evaluation. This paper develops an explicit model of investment projects with these characteristics, and uses option pricing methods to derive optimal decision rules for investment outlays over the entire construction program. Numerical solutions are used to demonstrate how time to build, opportunity cost, and uncertainty interact in affecting the investment decision. We show that with moderate levels of uncertainty over the future value of the completed project, a simple NPV rule could lead to gross over-investment. Also, we show how the contingent nature of the investment program magnifies the depressive effect of increased uncertainty on investment spending.
(This abstract was borrowed from another version of this item.)

Suggested Citation

  • Majd, Saman & Pindyck, Robert S., 1987. "Time to build, option value, and investment decisions," Journal of Financial Economics, Elsevier, vol. 18(1), pages 7-27, March.
  • Handle: RePEc:eee:jfinec:v:18:y:1987:i:1:p:7-27
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/0304-405X(87)90059-6
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to look for a different version below or search for a different version of it.

    Other versions of this item:

    References listed on IDEAS

    as
    1. Fischer, Stanley & Merton, Robert C., 1984. "Macroeconomics and finance: The role of the stock market," Carnegie-Rochester Conference Series on Public Policy, Elsevier, vol. 21(1), pages 57-108, January.
    2. Myers, Stewart C. & Majd, Saman., 1983. "Calculating abandonment value using option pricing theory," Working papers 1462-83., Massachusetts Institute of Technology (MIT), Sloan School of Management.
    3. Poterba, James M & Summers, Lawrence H, 1986. "The Persistence of Volatility and Stock Market Fluctuations," American Economic Review, American Economic Association, vol. 76(5), pages 1142-1151, December.
    4. Merton, Robert C., 1977. "On the pricing of contingent claims and the Modigliani-Miller theorem," Journal of Financial Economics, Elsevier, vol. 5(2), pages 241-249, November.
    5. Cox, John C. & Ross, Stephen A., 1976. "The valuation of options for alternative stochastic processes," Journal of Financial Economics, Elsevier, vol. 3(1-2), pages 145-166.
    6. Robert McDonald & Daniel R. Siegel, 1982. "Investment and the Valuation of Firms When There is an Option to Shut Down," Discussion Papers 529S, Northwestern University, Center for Mathematical Studies in Economics and Management Science.
    7. Kenneth J. Arrow & Anthony C. Fisher, 1974. "Environmental Preservation, Uncertainty, and Irreversibility," The Quarterly Journal of Economics, President and Fellows of Harvard College, vol. 88(2), pages 312-319.
    8. Roberts, Kevin & Weitzman, Martin L, 1981. "Funding Criteria for Research, Development, and Exploration Projects," Econometrica, Econometric Society, vol. 49(5), pages 1261-1288, September.
    9. Robert C. Merton, 2005. "Theory of rational option pricing," World Scientific Book Chapters, in: Sudipto Bhattacharya & George M Constantinides (ed.), Theory Of Valuation, chapter 8, pages 229-288, World Scientific Publishing Co. Pte. Ltd..
    10. Geske, Robert & Shastri, Kuldeep, 1985. "Valuation by Approximation: A Comparison of Alternative Option Valuation Techniques," Journal of Financial and Quantitative Analysis, Cambridge University Press, vol. 20(1), pages 45-71, March.
    11. Martin L. Weitzman & Whitney Newey & Michael Rabin, 1981. "Sequential R&D Strategy for Synfuels," Bell Journal of Economics, The RAND Corporation, vol. 12(2), pages 574-590, Autumn.
    12. Cukierman, Alex, 1980. "The Effects of Uncertainty on Investment under Risk Neutrality with Endogenous Information," Journal of Political Economy, University of Chicago Press, vol. 88(3), pages 462-475, June.
    13. Brennan, Michael J & Schwartz, Eduardo S, 1985. "Evaluating Natural Resource Investments," The Journal of Business, University of Chicago Press, vol. 58(2), pages 135-157, April.
    14. Brennan, Michael J. & Schwartz, Eduardo S., 1978. "Finite Difference Methods and Jump Processes Arising in the Pricing of Contingent Claims: A Synthesis," Journal of Financial and Quantitative Analysis, Cambridge University Press, vol. 13(3), pages 461-474, September.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Pindyck, Robert S, 1991. "Irreversibility, Uncertainty, and Investment," Journal of Economic Literature, American Economic Association, vol. 29(3), pages 1110-1148, September.
    2. Lim, Terence & Lo, Andrew W. & Merton, Robert C. & Scholes, Myron S., 2006. "The Derivatives Sourcebook," Foundations and Trends(R) in Finance, now publishers, vol. 1(5–6), pages 365-572, April.
    3. Jeffrey MacKie-Mason, 1988. "Nonlinear Taxation of Risky Assets and Investment, With Application to Mining," NBER Working Papers 2631, National Bureau of Economic Research, Inc.
    4. Mark Broadie & Jérôme Detemple, 1996. "Recent Advances in Numerical Methods for Pricing Derivative Securities," CIRANO Working Papers 96s-17, CIRANO.
    5. Coggins, Jay S. & Ramezani, Cyrus A., 1996. "AN ARBITRAGE-FREE APPROACH TO QUASI-OPTION VALUE; Proceedings of the Fifth Joint Conference on Agriculture, Food, and the Environment, June 17-18, 1996, Padova, Italy," Working Papers 14469, University of Minnesota, Center for International Food and Agricultural Policy.
    6. Garner, Jacqueline L. & Nam, Jouahn & Ottoo, Richard E., 2002. "Determinants of corporate growth opportunities of emerging firms," Journal of Economics and Business, Elsevier, vol. 54(1), pages 73-93.
    7. Coggins, Jay S. & Ramezani, Cyrus A., 1998. "An Arbitrage-Free Approach to Quasi-Option Value," Journal of Environmental Economics and Management, Elsevier, vol. 35(2), pages 103-125, March.
    8. Conrad, Jon M. & Lopez, Andres, 2000. "Stochastic Water Quality: The Timing and Option Value of Treatment," Working Papers 127675, Cornell University, Department of Applied Economics and Management.
    9. repec:dau:papers:123456789/9845 is not listed on IDEAS
    10. Frimpong, Samuel & Whiting, Jerry M, 1997. "Derivative mine valuation: strategic investment decisions in competitive markets," Resources Policy, Elsevier, vol. 23(4), pages 163-171, December.
    11. Philipp N. Baecker, 2007. "Real Options and Intellectual Property," Lecture Notes in Economics and Mathematical Systems, Springer, number 978-3-540-48264-2, July.
    12. Mark Broadie & Jerome B. Detemple, 2004. "ANNIVERSARY ARTICLE: Option Pricing: Valuation Models and Applications," Management Science, INFORMS, vol. 50(9), pages 1145-1177, September.
    13. Chen, Andrew H., 2002. "A new perspective on infrastructure financing in Asia," Pacific-Basin Finance Journal, Elsevier, vol. 10(3), pages 227-242, June.
    14. Duffie, Darrell, 2003. "Intertemporal asset pricing theory," Handbook of the Economics of Finance, in: G.M. Constantinides & M. Harris & R. M. Stulz (ed.), Handbook of the Economics of Finance, edition 1, volume 1, chapter 11, pages 639-742, Elsevier.
    15. Saman Majd & Robert S. Pindyck, 1989. "The Learning Curve and Optimal Production under Uncertainty," RAND Journal of Economics, The RAND Corporation, vol. 20(3), pages 331-343, Autumn.
    16. Saman Majd & Stewart C. Myers, 1985. "Valuing the Government's Tax Claim on Risky Corporate Assets," NBER Working Papers 1553, National Bureau of Economic Research, Inc.
    17. Li, Yong & James, Barclay & Madhavan, Ravi & Mahoney, Joseph T., 2006. "Real Options: Taking Stock and Looking Ahead," Working Papers 06-0114, University of Illinois at Urbana-Champaign, College of Business.
    18. Huimin Yao & Frederik Pretorius, 2014. "Demand Uncertainty, Development Timing and Leasehold Land Valuation: Empirical Testing of Real Options in Residential Real Estate Development," Real Estate Economics, American Real Estate and Urban Economics Association, vol. 42(4), pages 829-868, December.
    19. Michele Moretto & Chiara D’Alpaos, 2004. "The Value of Flexibility in the Italian Water Service Sector: A Real Option Analysis," Working Papers 2004.140, Fondazione Eni Enrico Mattei.
    20. Ghysels, E. & Harvey, A. & Renault, E., 1995. "Stochastic Volatility," Papers 95.400, Toulouse - GREMAQ.
    21. Mondher Bellalah, 2009. "Derivatives, Risk Management & Value," World Scientific Books, World Scientific Publishing Co. Pte. Ltd., number 7175, September.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:jfinec:v:18:y:1987:i:1:p:7-27. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/inca/505576 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.