Nothing Special   »   [go: up one dir, main page]

IDEAS home Printed from https://ideas.repec.org/p/bai/series/series_wp_01-2015.html
   My bibliography  Save this paper

From fixed to state-dependent duration in public-private partnerships

Author

Listed:
  • Daniel Danau

    (Universitè de Caen Basse-Normandie - Centre de Recherche en Economie et Management)

  • Annalisa Vinella

    (Università degli Studi di Bari "Aldo Moro" - Dipartimento di Scienze economiche e metodi matematici)

Abstract
A government delegates a build-operate-transfer project to a private Örm. In the contracting stage, the operating cost is unknown. The Örm can increase the likelihood of facing a low cost, rather than a high cost, by exerting costly e§ort when building the infrastructure. Once this is in place, the Örm learns the true cost and begins to operate. We show that, under limited commitment, if the break-up of the partnership is su¢ciently costly to the government and/or information problems are su¢ciently severe, the contract is not robust to renegotiation unless it has a longer duration when the realized cost is low. This result is at odds with the prescription of the literature on aÌ exible-term contracts, which recommends a longer duration when operating conditions are unfavourable.

Suggested Citation

  • Daniel Danau & Annalisa Vinella, 2015. "From fixed to state-dependent duration in public-private partnerships," SERIES 01-2015, Dipartimento di Economia e Finanza - Università degli Studi di Bari "Aldo Moro", revised Jan 2015.
  • Handle: RePEc:bai:series:series_wp_01-2015
    as

    Download full text from publisher

    File URL: http://www.seriesworkingpapers.it/RePEc/bai/series/SERIES_WP_01-2015.pdf
    Download Restriction: no
    ---><---

    Other versions of this item:

    References listed on IDEAS

    as
    1. Rey, Patrick & Salanie, Bernard, 1996. "On the Value of Commitment with Asymmetric Information," Econometrica, Econometric Society, vol. 64(6), pages 1395-1414, November.
    2. Eduardo Engel & Ronald Fischer & Alexander Galetovic, 2013. "The Basic Public Finance Of Public–Private Partnerships," Journal of the European Economic Association, European Economic Association, vol. 11(1), pages 83-111, February.
    3. Albalate, Daniel & Bel, Germà, 2009. "Regulating concessions of toll motorways: An empirical study on fixed vs. variable term contracts," Transportation Research Part A: Policy and Practice, Elsevier, vol. 43(2), pages 219-229, February.
    4. David Martimort & Aggey Semenov & Lars Stole, 2017. "A Theory of Contracts with Limited Enforcement," The Review of Economic Studies, Review of Economic Studies Ltd, vol. 84(2), pages 816-852.
    5. Eduardo M. R. A. Engel & Ronald D. Fischer & Alexander Galetovic, 2001. "Least-Present-Value-of-Revenue Auctions and Highway Franchising," Journal of Political Economy, University of Chicago Press, vol. 109(5), pages 993-1020, October.
    6. David Martimort & Flavio Menezes & Myrna Wooders & DANIEL DANAU & ANNALISA VINELLA, 2015. "Public-Private Contracting under Limited Commitment," Journal of Public Economic Theory, Association for Public Economic Theory, vol. 17(1), pages 78-110, February.
    7. Bajari, Patrick & Tadelis, Steven, 2001. "Incentives versus Transaction Costs: A Theory of Procurement Contracts," RAND Journal of Economics, The RAND Corporation, vol. 32(3), pages 387-407, Autumn.
    8. David Martimort & Flavio Menezes & Myrna Wooders & ELISABETTA IOSSA & DAVID MARTIMORT, 2015. "The Simple Microeconomics of Public-Private Partnerships," Journal of Public Economic Theory, Association for Public Economic Theory, vol. 17(1), pages 4-48, February.
    9. repec:bla:devpol:v:24:y:2006:i:2:p:175-202 is not listed on IDEAS
    10. David Martimort, 2006. "An Agency Perspective on the Costs and Benefits of Privatization," Journal of Regulatory Economics, Springer, vol. 30(1), pages 5-44, July.
    11. Grossman, Sanford J & Hart, Oliver D, 1986. "The Costs and Benefits of Ownership: A Theory of Vertical and Lateral Integration," Journal of Political Economy, University of Chicago Press, vol. 94(4), pages 691-719, August.
    12. Bennett, John & Iossa, Elisabetta, 2006. "Building and managing facilities for public services," Journal of Public Economics, Elsevier, vol. 90(10-11), pages 2143-2160, November.
    13. Eduardo Engel & Ronald Fischer & Alexander Galetovic, 2010. "The economics of infrastructure finance: Public-private partnerships versus public provision," Documentos de Trabajo 276, Centro de Economía Aplicada, Universidad de Chile.
    14. Jonathan Levin, 2003. "Relational Incentive Contracts," American Economic Review, American Economic Association, vol. 93(3), pages 835-857, June.
    15. Michael Trebilcock & Michael Rosenstock, 2015. "Infrastructure Public-Private Partnerships in the Developing World: Lessons from Recent Experience," Journal of Development Studies, Taylor & Francis Journals, vol. 51(4), pages 335-354, April.
    16. Baron, David P. & Besanko, David, 1984. "Regulation and information in a continuing relationship," Information Economics and Policy, Elsevier, vol. 1(3), pages 267-302.
    17. Auriol, Emmanuelle & Picard, Pierre M., 2013. "A theory of BOT concession contracts," Journal of Economic Behavior & Organization, Elsevier, vol. 89(C), pages 187-209.
    18. Helmut Bester & Roland Strausz, "undated". "Imperfect Commitment and the Revelation Principle," Papers 004, Departmental Working Papers.
    19. repec:hal:pseose:hal-00813153 is not listed on IDEAS
    20. repec:hal:pseose:halshs-01109351 is not listed on IDEAS
    21. Guasch, J. Luis & Laffont, Jean-Jacques & Straub, Stéphane, 2008. "Renegotiation of concession contracts in Latin America: Evidence from the water and transport sectors," International Journal of Industrial Organization, Elsevier, vol. 26(2), pages 421-442, March.
    22. Mathias Dewatripont, 1989. "Renegotiation and Information Revelation Over Time: The Case of Optimal Labor Contracts," The Quarterly Journal of Economics, President and Fellows of Harvard College, vol. 104(3), pages 589-619.
    23. Oliver D. Hart & Jean Tirole, 1988. "Contract Renegotiation and Coasian Dynamics," The Review of Economic Studies, Review of Economic Studies Ltd, vol. 55(4), pages 509-540.
    24. Mathias Dewatripont, 1989. "Renegotiation and Information Revelation Over Time: The Case of Optimal Labor Contracts," The Quarterly Journal of Economics, Oxford University Press, vol. 104(3), pages 589-619.
    25. David E. M. Sappington & Joseph E. Stiglitz, 1987. "Privatization, information and incentives," Journal of Policy Analysis and Management, John Wiley & Sons, Ltd., vol. 6(4), pages 567-585.
    26. William Fuchs, 2007. "Contracting with Repeated Moral Hazard and Private Evaluations," American Economic Review, American Economic Association, vol. 97(4), pages 1432-1448, September.
    27. Philippe Gagnepain & Marc Ivaldi & David Martimort, 2009. "Renégociation de contrats dans l'industrie du transport urbain en France," Revue économique, Presses de Sciences-Po, vol. 60(4), pages 927-947.
    28. Martimort, David & Pouyet, Jerome, 2008. "To build or not to build: Normative and positive theories of public-private partnerships," International Journal of Industrial Organization, Elsevier, vol. 26(2), pages 393-411, March.
    29. Ehrhardt, David & Irwin Timothy, 2004. "Avoiding customer and taxpayer bailouts in private infrastructure projects : Policy toward leverage, risk allocation, and bankruptcy," Policy Research Working Paper Series 3274, The World Bank.
    30. Elisabetta Iossa & David Martimort, 2012. "Risk allocation and the costs and benefits of public--private partnerships," RAND Journal of Economics, RAND Corporation, vol. 43(3), pages 442-474, September.
    31. Bev Dahlby, 2008. "The Marginal Cost of Public Funds: Theory and Applications," MIT Press Books, The MIT Press, edition 1, volume 1, number 0262042509, April.
    32. J. Luis Guasch, 2004. "Granting and Renegotiating Infrastructure Concessions : Doing it Right," World Bank Publications - Books, The World Bank Group, number 15024.
    33. Oliver Hart, 2003. "Incomplete Contracts and Public Ownership: Remarks, and an Application to Public-Private Partnerships," Economic Journal, Royal Economic Society, vol. 113(486), pages 69-76, March.
    34. J. Guasch & Jean-Jacques Laffont & Stéphane Straub, 2006. "Renegotiation of Concession Contracts: A Theoretical Approach," Review of Industrial Organization, Springer;The Industrial Organization Society, vol. 29(1), pages 55-73, September.
    35. Harris, Milton & Raviv, Artur, 1979. "Optimal incentive contracts with imperfect information," Journal of Economic Theory, Elsevier, vol. 20(2), pages 231-259, April.
    36. Engel, Eduardo & Fischer, Ronald & Galetovic, Alexander, 1997. "Highway Franchising: Pitfalls and Opportunities," American Economic Review, American Economic Association, vol. 87(2), pages 68-72, May.
    37. Timothy C. Irwin, 2007. "Government Guarantees : Allocating and Valuing Risk in Privately Financed Infrastructure Projects," World Bank Publications - Books, The World Bank Group, number 6638.
    38. Elisabetta Iossa & David Martimort, 2011. "Post-Tender Corruption and Risk Allocation:Implications for Public-Private Partnerships," CEIS Research Paper 195, Tor Vergata University, CEIS, revised 19 May 2011.
    39. Oliver E. Williamson, 1976. "Franchise Bidding for Natural Monopolies -- in General and with Respect to CATV," Bell Journal of Economics, The RAND Corporation, vol. 7(1), pages 73-104, Spring.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Marco Buso & Cesare Dosi & Michele Moretto, 2021. "Do exit options increase the value for money of public–private partnerships?," Journal of Economics & Management Strategy, Wiley Blackwell, vol. 30(4), pages 721-742, November.
    2. Daniel Danau & Annalisa Vinella, 2021. "Under/Over‐Investment and Early Renegotiation in Public‐Private Partnerships," Journal of Industrial Economics, Wiley Blackwell, vol. 69(4), pages 923-966, December.
    3. Marco Buso & Cesare Dosi & Michele Moretto, 2018. "Termination Fees and Contract Design in Public-Private Partnerships," Working Papers 2018.32, Fondazione Eni Enrico Mattei.
    4. Giuseppe Di Liddo & Annalisa Vinella, 2022. "Asymmetric yardstick competition: traditional procurement versus public-private partnerships," Italian Economic Journal: A Continuation of Rivista Italiana degli Economisti and Giornale degli Economisti, Springer;Società Italiana degli Economisti (Italian Economic Association), vol. 8(3), pages 669-695, November.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. David Martimort & Flavio Menezes & Myrna Wooders & DANIEL DANAU & ANNALISA VINELLA, 2015. "Public-Private Contracting under Limited Commitment," Journal of Public Economic Theory, Association for Public Economic Theory, vol. 17(1), pages 78-110, February.
    2. David Martimort & Flavio Menezes & Myrna Wooders & ELISABETTA IOSSA & DAVID MARTIMORT, 2015. "The Simple Microeconomics of Public-Private Partnerships," Journal of Public Economic Theory, Association for Public Economic Theory, vol. 17(1), pages 4-48, February.
    3. Auriol, Emmanuelle & Picard, Pierre M., 2013. "A theory of BOT concession contracts," Journal of Economic Behavior & Organization, Elsevier, vol. 89(C), pages 187-209.
    4. Daniel Danau & Annalisa Vinella, 2013. "From fixed to state-dependent duration in public-private contracts," Economics Working Paper Archive (University of Rennes & University of Caen) 201344, Center for Research in Economics and Management (CREM), University of Rennes, University of Caen and CNRS, revised Jan 2015.
    5. David Martimort & Flavio Menezes & Myrna Wooders & FLÁVIO MENEZES & MATTHEW RYAN, 2015. "Default and Renegotiation in Public-Private Partnership Auctions," Journal of Public Economic Theory, Association for Public Economic Theory, vol. 17(1), pages 49-77, February.
    6. Ram Singh, 2018. "Public–private partnerships vs. traditional contracts for highways," Indian Economic Review, Springer, vol. 53(1), pages 29-63, December.
    7. repec:bla:annpce:v:89:y:2018:i:1:p:25-48 is not listed on IDEAS
    8. Pierre M. Picard & Ridwan D. Rusli, 2018. "State‐owned firms and private debt," Journal of Public Economic Theory, Association for Public Economic Theory, vol. 20(5), pages 672-702, October.
    9. Elisabetta Iossa & David Martimort, 2012. "Risk allocation and the costs and benefits of public--private partnerships," RAND Journal of Economics, RAND Corporation, vol. 43(3), pages 442-474, September.
    10. Buso, Marco & Marty, Frederic & Tran, Phuong Tra, 2017. "Public-private partnerships from budget constraints: Looking for debt hiding?," International Journal of Industrial Organization, Elsevier, vol. 51(C), pages 56-84.
    11. Eva I. Hoppe & Patrick W. Schmitz, 2021. "How (Not) to Foster Innovations in Public Infrastructure Projects," Scandinavian Journal of Economics, Wiley Blackwell, vol. 123(1), pages 238-266, January.
    12. Fay, Marianne & Martimort, David & Straub, Stéphane, 2021. "Funding and financing infrastructure: The joint-use of public and private finance," Journal of Development Economics, Elsevier, vol. 150(C).
    13. Philippe Gagnepain & Marc Ivaldi & David Martimort, 2013. "The Cost of Contract Renegotiation: Evidence from the Local Public Sector," American Economic Review, American Economic Association, vol. 103(6), pages 2352-2383, October.
    14. Buso, Marco & Moretto, Michele & Zormpas, Dimitrios, 2021. "Excess returns in Public-Private Partnerships: Do governments pay too much?," Economic Modelling, Elsevier, vol. 102(C).
    15. Elisabetta Iossa & David Martimort, 2011. "The Theory of Incentives Applied to the Transport Sector," Chapters, in: André de Palma & Robin Lindsey & Emile Quinet & Roger Vickerman (ed.), A Handbook of Transport Economics, chapter 29, Edward Elgar Publishing.
    16. Nicolas Campos & Eduardo Engel & Ronald D. Fischer & Alexander Galetovic, 2019. "Renegotiations and corruption in infrastructure: The Odebrecht case," "Marco Fanno" Working Papers 0230, Dipartimento di Scienze Economiche "Marco Fanno".
    17. Engel, Eduardo & Fischer, Ronald & Galetovic, Alexander, 2018. "The joy of flying: Efficient airport PPP contracts," Transportation Research Part B: Methodological, Elsevier, vol. 114(C), pages 131-146.
    18. Stéphane Saussier & Carine Staropoli & Anne Yvrande-Billon, 2009. "Public–Private Agreements, Institutions, and Competition: When Economic Theory Meets Facts," Review of Industrial Organization, Springer;The Industrial Organization Society, vol. 35(1), pages 1-18, September.
    19. Eduardo Engel & Ronald Fischer & Alexander Galetovic, 2013. "The Basic Public Finance Of Public–Private Partnerships," Journal of the European Economic Association, European Economic Association, vol. 11(1), pages 83-111, February.
    20. Eva I. Hoppe & Patrick W. Schmitz, 2013. "Public-private partnerships versus traditional procurement: Innovation incentives and information gathering," RAND Journal of Economics, RAND Corporation, vol. 44(1), pages 56-74, March.
    21. David Martimort & Flavio Menezes & Myrna Wooders & LUCIANO GRECO, 2015. "Imperfect Bundling in Public–Private Partnerships," Journal of Public Economic Theory, Association for Public Economic Theory, vol. 17(1), pages 136-146, February.

    More about this item

    Keywords

    Public-private partnerships; state-dependent duration; aÌ exible-term con- tract; limited commitment; renegotiation; break-up;
    All these keywords.

    JEL classification:

    • D82 - Microeconomics - - Information, Knowledge, and Uncertainty - - - Asymmetric and Private Information; Mechanism Design
    • H57 - Public Economics - - National Government Expenditures and Related Policies - - - Procurement
    • H81 - Public Economics - - Miscellaneous Issues - - - Governmental Loans; Loan Guarantees; Credits; Grants; Bailouts

    NEP fields

    This paper has been announced in the following NEP Reports:

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:bai:series:series_wp_01-2015. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Annalisa Vinella (email available below). General contact details of provider: https://edirc.repec.org/data/debarit.html .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.